Five Reasons for Preventive Maintenance

 

October 23, 2016 

Joy Sonn

Keeping electrical distribution equipment at optimum performance levels can be challenging and stressful. Why? Because nothing operates without reliable power. Developing a maintenance strategy for your electrical distribution system is a sound business decision and implementing an electrical preventive maintenance program is a great starting point. Here are five reasons why.

1. Protect people and equipment
Plant managers must ensure the sustainability of their businesses, and with that comes the responsibility to evaluate and adopt all measures technically and economically available to minimize the risk of unwanted events. These events might cause loss of plant assets, but also place workers in danger. Electrical distribution equipment such as circuit breakers and fuse-contactors is designed to minimize the risk and severity of injuries or equipment breakdown. Therefore, the first priority of maintenance is to ensure this role is performed.

2. Maximize your electrical equipment’s uptime
A regularly scheduled preventive maintenance program lessens process disruptions and reduces stress on electrical equipment. It takes less time to have preventive maintenance performed through a scheduled outage than to have emergency repair on electrical equipment.

3. Enhance energy efficiency
Research shows that regularly maintained equipment is more energy efficient. Over time, normal wear and tear causes stress to components that can result in diminishing device energy efficiency. Less wear and tear on the equipment means less wasted energy while it is running. Preventive maintenance can be performed during off-peak business periods.

4. Improve spare parts management
Spare parts alone can add up to half of the total maintenance costs. Substituting preventive maintenance for reactive maintenance helps to reduce the number of faults on complex parts and/or systems. As a result, more money and time can be spent on improving your production process.

5. Optimize total cost of ownership
Plant managers want to keep their facility’s electrical distribution equipment running well for as long as possible, considering the significant costs of any new equipment acquisition (CapEx). Business operations must also be kept running as smoothly as possible at an optimum cost (OpEx). Without maintenance, the potential for unplanned downtime increases.

Reactive (repair) situations can cause both spare parts and labour to be sold at a premium, in addition to the cost of lost productivity. Implementing an electrical preventive maintenance strategy mitigates the risk of unplanned (and costly) downtime. Knowing when a scheduled shutdown will occur enables management to set staffing levels accordingly.

The bottom line is that electrical preventive maintenance helps to reduce Total Cost of Ownership (CapEx + OpEx) and creates more value for your business. In addition, it helps companies meet their legislative and regulatory requirements.

Joy Sonn has 25 years experience in the electrical distribution services industry. She joined Schneider Electric in 1996.

This article was first published as a Schneider Electric blog: http://blog.schneider-electric.com.

 

Related Articles


Latest Articles

  • EFC Urges Federal Government to Maintain the EV Availability Standard to Ensure Affordability, Consumer Choice, and Industry Certainty

    EFC Urges Federal Government to Maintain the EV Availability Standard to Ensure Affordability, Consumer Choice, and Industry Certainty

    Electro-Federation Canada (EFC), the national association representing over 230 member companies in the electrical industry, including manufacturers, distributors, and technology providers that power Canada’s electrification infrastructure, is calling on the federal government to maintain the Electric Vehicle (EV) Availability Standard and preserve policies that send strong and consistent signals to consumers, manufacturers, and investors. At… Read More…

  • ESA Honours Sector Leaders Driving Safety Innovation

    September 18, 2025 The Electrical Safety Authority (ESA) hosted its 2025 Annual Meeting and the 16th Ontario Electrical Safety Awards yesterday, recognizing individuals and organizations making meaningful contributions to electrical safety across the province. The Honourable Stephen Crawford, Minister of Public and Business Service Delivery and Procurement, was in attendance to mark the occasion. Awards… Read More…

  • ESA Releases 2024 Ontario Electrical Safety Report

    ESA Releases 2024 Ontario Electrical Safety Report

    September 18, 2025 Electrical Fatalities in Ontario Drop on the Job, But Rise at Home  ESA’s newly released Ontario Electrical Safety Report finds electrical fatalities outside of work up 40%, even as workplace deaths decline The Electrical Safety Authority (ESA) has released the 24th edition of its Ontario Electrical Safety Report (OESR), the only publication… Read More…

  • Ontario Save on Energy Instant Discounts Program for Lighting

    Ontario Save on Energy Instant Discounts Program for Lighting

    September 18, 2025 Receive upfront discounts from participating distributors on the purchase of energy-efficient lighting products that will help to lower your business’s energy consumption, improve your bottom line and transform your space. Instant, point-of-sale discounts are available for existing commercial, agricultural, industrial, institutional and multi-unit residential buildings and facilities in Ontario that purchase eligible… Read More…


Changing Scene

  • Greenlee Experience 2025 – Recap

    September 18, 2025  Greenlee brought together electrical and utility professionals for its fourth annual Greenlee Experience, a three-day VIP event   at one of its manufacturing facilities. This exclusive event was created to honor professionals in the electrical and utility trades, while offering a behind-the-scenes look at the brand’s legacy of innovation. “It was an absolute joy… Read More…

  • Ontario Investing $10 million to Build New South Bowmanville Recreation Centre

    Ontario Investing $10 million to Build New South Bowmanville Recreation Centre

    September 18, 2025 The Ontario government is investing $10 million to support the construction of the South Bowmanville Recreation Centre in the Municipality of Clarington. This project is part of the $200 million Community Sport and Recreation Infrastructure Fund (CSRIF) — a provincewide initiative to help communities revitalize local facilities, grow the economy and promote active,… Read More…

  • Ontario Investing $19.5 Million to Build New Recreation Complex in Cambridge

    September 18, 2025 The Ontario government is investing $19.5 million to protect jobs and support the construction of a new multi-purpose recreation complex in the City of Cambridge. This project is part of the $200 million Community Sport and Recreation Infrastructure Fund (CSRIF), a provincewide initiative to revitalize local facilities, grow the economy and promote active, healthy… Read More…

  • SWTCH and FLO Launch Seamless Roaming Agreement, Improving Access to Tens of Thousands of Chargers Across North America

    SWTCH and FLO Launch Seamless Roaming Agreement, Improving Access to Tens of Thousands of Chargers Across North America

    September 18, 2025 Cross-network integration eliminates charging barriers and delivers unified access through both companies’ mobile applications  SWTCH Energy and FLO have announced a comprehensive roaming agreement. The agreement allows users of one charging network to access the other network’s stations through their existing app, eliminating the need for multiple accounts, payment methods, and apps to install…. Read More…