The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook**, but will hopefully provide some help in navigating the Code.

Section 56 — Optical fiber cables

56

Rule 56-000 states that Section 56 is a supplementary or amendatory section of the code and applies to the installation of optical fiber cables in conjunction with all other electrical systems.

Rule 56-002 provides a special terminology definition for an Optical Fiber Cable – a cable consisting of one or more optical fibers that transmits modulated light for the purpose of control, signalling or communications.

Rule 56-102 outlines that there are 3 types of optical fiber cables:

  • Non-conductive cables containing no metal other conductive materials.
  • Conductive cables containing non-current carrying conductive material such as strength member, metal vapour barriers or metal sheaths or shields, and,
  • Hybrid cables that contain both fiber optic and current carrying electrical conductors.
Rule 56-104 requires that optical fiber cables
  • installed, within buildings, be approved types as listed in Table 19 and
  • where installed outdoors be suitable for the location with respect to moisture, corrosive atmosphere, temperature, degree of enclosure and exposure to mechanical damage.
  • Also note that OFNP, OFNR, OFNG, OFN, OFNH, OFCP, OFCR, OFCG, OFC, and OFCH have a minimum cable temperature rating of 60 °C.
  • Where a cable is used in a greater temperature the rating must be marked on the cable.

Rule 56-106 states that, as per paragraph (a) in the Scope of the code, optical fiber installations, by a utility in its function as a utility, are not subject to inspection and acceptance by an inspector.

Rule 56-200 prohibits non-conductive optical fiber cables from occupying the same raceway, cabinet, panel, outlet box or similar enclosure with insulated conductors of electric lighting, power or Class I circuits, unless they are functionally associated, and the number and size of insulated conductors meet applicable requirements of the wiring method. For industrial establishments, where authorized persons supervise and maintain the installation, this prohibition may be waived.

Rule 56-202 Conductive optical fiber cables
  • are permitted to occupy the same raceway with Class 2 circuits in accordance with Section 16; communication circuits in accordance with Section 60; or community antenna distribution and radio and television circuits in accordance with Section 54.
  • must not occupy the same raceway, panel, cabinet, or similar enclosure housing electric lighting, power, or Class 1 circuits.
  • must not occupy the same cabinet, panel, outlet box, or similar enclosure housing the electrical terminals of a Class 2, communications, community antenna distribution, or radio and television circuit, unless they are functionally associated with the Class 2, communication, community antenna distribution, or radio and television circuit; or the conductive optical fiber cables are factory assembled in the enclosure.
  • for industrial establishments only, where conditions of maintenance and supervision ensure that only authorized persons service the installation, conductive optical fiber cables are permitted to occupy the same raceway, cabinet, panel, outlet box, or similar enclosure as electric power, control, or instrumentation cables provided the total length of each conductive optical fiber cable does not extend beyond the boundaries of the industrial establishment.
  • The conductive non-current-carrying members of conductive optical fiber cables shall be grounded in accordance with Section 10

Rule 56-204 permits optical fiber cables to be incorporated in hybrid cables with electric lighting, power, or Class I circuits not exceeding 750 volts, or Class 2, communications, community antenna, or radio and television circuits conductors with associated functions. In every case, the hybrid cable is classed as per the type of insulated conductors in the cable and installed according to the rules for that type.

Rule 56-206 requires that where an optical fiber cable penetrates through a fire separation it shall be installed in accordance with Rule 2-128 to prevent fire spread.

Rule 56-208 requires optical fiber and hybrid cables installed in a vertical shaft to be totally enclosed in non-combustible raceway unless they meet the flame spread requirements of the National Building Code of Canada or local building legislation for buildings of non-combustible construction (FT4).

Rule 56-210 provides that optical fiber cables must not be installed in ducts or plenum chambers unless they meet the flame spread requirements of the National Building Code of Canada or local building legislation and the provision of Rule 12-010 – Wiring in ducts and plenum chambers.

Rule 56-212 requires that all raceways containing optical fiber cables must be installed in accordance with Section 12.

Rule 56-214 requires that where conductive optical fiber cables are exposed to lightning or accidental contact with lighting or power cables the metal parts must be bonded to ground at the point, as close as possible, to the point the cable enters the building. 

Previous Installment: Section 54

In the next installment, we will be discussing Section 58 — Passenger ropeways and similar equipment.


[i] Source: CSA C22.1:24, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2024 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:24, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

Related Articles


Latest Articles

  • Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    March 16, 2026 By Electro-Federation Canada Following EFC’s recent update on our 2026 Ottawa Day, we are pleased to share photo highlights from two days of engagement on Parliament Hill, where members met with federal decision-makers to discuss the future of Canada’s electricity system. More than 40 EFC member leaders and Government Relations representatives travelled Read More…

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…


Changing Scene

  • A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    March 16, 2026 Guillevin.com was built as a digital working tool, designed to support the way their customers plan, search for, and purchase products today. The goal is simple: to offer a fast, reliable, and intuitive online platform capable of supporting real-world operations; both on the job site and in the office. A platform built around Read More…

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…

  • KPMG Establishes Major Products Delivery Office

    KPMG Establishes Major Products Delivery Office

    March 13, 2026 KMPG: Complex projects require well-structured teams, appropriate delivery models tailored to the project’s needs, robust governance frameworks, and stable execution environments KPMG Canada is entering a defining era of major project development that has significant implications for the nation’s economic future, as the country works to establish new trade partnerships, develop its resources, reinforce self-reliance Read More…