Electrical Safety Authority Urges Ontarians to Stay Safe After Powerline Contacts Increased by 310%

ESA

May 15, 2023

Since 2019, Ontario has seen a staggering 310% increase in powerline contacts by the general public, according to the Electrical Safety Authority (ESA). To help educate Ontarians and keep them safe, this Powerline Safety Week (May 15 to 21), ESA is busting the myths around the deadly hazards of powerlines.

With 19 fatalities and 1,393 overhead powerline contacts occurring between 2012 and 2021, the ESA’s mission to educate and protect Ontarians is more important than ever. While many powerline contacts can be attributed to weather-related events that cause tree branches and limbs to fall on powerlines, almost a third involve accidental powerline contacts from recreational activities like tree pruning, high reach equipment and outdoor home renos.

“The danger that powerlines pose is very real, and a powerline contact can have devastating consequences in an instant,” said Patrick Falzon, Powerline Specialist at the Electrical Safety Authority. “We know there are many myths out there that may provide a false sense of security around powerlines, but whether you are cleaning up the yard or come across a downed powerline from a storm, there are important steps you should take to keep yourself and those around you safe.”

Some of the most common myths around powerlines include:

MYTH: Downed powerline wires need to be moving or arcing if they are energized.
FACT: Always assume a downed powerline has electricity flowing through it, even if it isn’t moving. Stay back at least 10 metres (that’s the length of a school bus), call 9-1-1 and the local utility. 

MYTH: Orange cover-ups on powerlines will protect workers from electrical shock.
FACT: More than 67% of construction workers in Ontario believe this or aren’t sure. This is a deadly misconception. Orange cover-ups on powerlines are used for identification purposes only and you should always remain a minimum of 3 metres away from overhead powerlines.

MYTH:  If my ladder isn’t metal, it can rest on or near the powerline.
FACT: No matter what a ladder is made of, it is a possible hazard. Be safe. Keep all ladders 3 metres away from overhead powerlines. 

MYTH: Wearing leather gloves or safety boots can protect from a powerline shock.
FACT: More than a third of Ontarians believe this or aren’t sure. But you should always stay at least 3 metres away from powerlines with yourself and your tools, no matter what safety gear you may be wearing.

MYTH: Your tool/ladder needs to touch a powerline to get a shock or burn. 
FACT: More than 40% of Ontarians mistakenly think this might be true – it is not. Anything that comes within 3 metres of an overhead powerline – a pruning tool, the tree limb or your hand – can give you a shock, burn or kill you.

MYTH: I’m just digging a couple of feet into the ground. I don’t need to worry about underground lines. 
FACT: The lines may be closer than you think, or a grading change may have happened over time. Better to be safe than sorry. For any sized dig, you must click before you dig! Contact Ontario One Call to request utility locates. It’s free, it’s easy, it’s the law!

For more information about powerline safety, including tips for homeowners and construction workers, visit ESAsafe.com/StopLookLive.

Source

Related Articles


Latest Articles

  • New Gender Equality Report Card Shows Most Jurisdictions are Failing

    New Gender Equality Report Card Shows Most Jurisdictions are Failing

    November 10, 2025 The Canadian Coalition of Women in Engineering, Science, Trade and Technology (CCWESTT) has just released the first Gender Equality Report Card, which provides comprehensive, evidence-based insight into the state of gender equality across Canada’s provinces and territories in science, engineering, trades and technology (SETT) workplaces. The report draws on 18 participatory research… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i] 26th Edition – A Road Map: Section 46

    Guide to the Canadian Electrical Code, Part 1[i] 26th Edition – A Road Map: Section 46

    November 10, 2025 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendices B and… Read More…

  • Calgary Project Transforms Office Building into Energy Efficient Housing

    November 10, 2025 More than 200 Calgarians now have new homes in Downtown West as the former Dominion Centre office reopens as Dominion Civic Apartments. The former Dominion Centre has been transformed from 100,000 square feet of vacant office space to an energy efficient and climate resilient residential building with 132 modern rental suites. The… Read More…

  • Remembering Katy Shebath, A Kind And Thoughtful Leader

    Remembering Katy Shebath, A Kind And Thoughtful Leader

    November 10, 2025 By Stanpro Katy Shebath played a critical role alongside her brother, David Nathaniel, throughout the last 32 years of Standard Products journey. She remains, with David, the heart and soul of this company. A Driving Force Behind STANDARD When Katy joined STANDARD in 1986, she took on the administration of the company. At… Read More…


Changing Scene

  • A Groundbreaking Return to the Sir Robert Peel Centre for Ellis Don

    A Groundbreaking Return to the Sir Robert Peel Centre for Ellis Don

    November 10, 2025 In a full circle moment, EllisDon has broken ground on the Sir Robert Peel Centre Redevelopment Project, a facility originally constructed by EllisDon in the 1980s. Now, this milestone marks the beginning of a new chapter in Peel Region’s public safety infrastructure. The redevelopment will deliver a modern, high-performance policing hub designed… Read More…

  • BCCA Response to Federal Budget 2025

    BCCA Response to Federal Budget 2025

    November 10, 2025 The BCCA welcomes the federal government’s investments into construction and infrastructure in Budget 2025. The budget includes increasing Canada Infrastructure Bank funding by $10 billion and funding the new Major Projects Office to the tune of $213.8 million over 5 years. The BCCA also supports the government’s investment into the construction workforce,… Read More…

  • Government of Canada Releases Budget 2025

    Government of Canada Releases Budget 2025

    November 10. 2025 Canada faces a rapidly changing and increasingly uncertain world. The rules-based international order and the trading system that powered Canada’s prosperity for decades are being reshaped – hurting companies, displacing workers, causing major disruption and upheaval for Canadians. In the face of global uncertainty, Canada’s new government is focused on what we… Read More…

  • CME: Budget 2025 Delivers Key Gains for Manufacturers Facing Tariff Pressures, but Canada Still Needs Deeper Competitiveness Reforms

    CME: Budget 2025 Delivers Key Gains for Manufacturers Facing Tariff Pressures, but Canada Still Needs Deeper Competitiveness Reforms

    November 10, 2025 Canadian Manufacturers & Exporters (CME) applauds Budget 2025 for recognizing the serious challenges facing Canada’s economy amid ongoing U.S. trade actions and for introducing new incentives to spur investment. “This budget takes meaningful steps to support manufacturers under pressure and acknowledges the critical role our sector plays in Canada’s economic future,” said… Read More…