Guide to the Canadian Electrical Code, Part I — Instalment 18

November 7, 2016 

By William (Bill) Burr

In this article: Section 32 — Fire Alarm Systems, Fire Pumps, and Carbon Monoxide Alarms. The code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Section 32, as outlined in rule 32-000 Scope, is a supplementary or amendatory section of the code and provides additional and specific requirements for the location, installation, wiring, and protection of fire alarm systems, fire pumps and smoke and carbon monoxide alarms required by the National Building Code of Canada as referenced in Appendix G. For further information, refer to Canadian Standard CAN/ULC – S524 Standard for the Installation of Fire Alarm Systems published by ULC Canada. Appendix B contains important additional helpful notes, and the CEC Handbook also contains helpful information.

Fire alarm systems

Rule 32-100 specifies the requirements for conductors in fire alarm systems, which include copper material, ampacity, use of optical fibre cables, use of stranded conductors, insulation rated at 300 volts, determining wire size for raceways or integral assemblies, and selection in accordance with rules 4-008(1) or 4-020(1).

Rule 32-102 outlines wiring methods for installation of conductors either in metal, non-metallic raceway, or having a metal armour or sheath. Where installed in buildings of combustible construction, conductors may be installed in accordance with Section 12. Conductors need to be installed independent of any other wiring except for point of supply, signal, ancillary device or communication circuits and must be insulated for the highest voltage rated conductor. Communication circuits must conform to Section 60.

Rule 32-104 requires that all exposed non-current-carrying parts of electrical equipment be bonded to ground in accordance with Section 10. In addition, non-metallic fire alarm wiring systems must incorporate a bonding conductor.

Rule 32-106 denotes that for electrical supervision, each circuit conductor terminal shall be independently terminated.

Rule 32-108 specifies that the fire alarm system power supply, except for included additional control units or transponders, be on a separate circuit and that the overcurrent devices and disconnecting means be permanently identified as a fire alarm system, be coloured red, and lockable in the on position.

Rule 32-110 provides installation requirements for permanently connected smoke alarms and carbon monoxide alarms in dwelling units that are required by the National Building Code of Canada (see Appendix G). The rule requires that smoke and carbon monoxide alarms be supplied from a circuit, such as a lighting only or mixed lighting and receptacle circuit, that will provide an indication if shut off. The circuit shall also have no disconnect or a GFCI or AFCI device between the alarms and the branch circuit overcurrent device. Interconnection of alarms may use a class 2 power supply in accordance with Rules 12-506 to 12-524.

Fire pumps

Rule 32-200 requires that conductors for the supply of a fire pump supplied from the emergency power source have an ampacity not less than 125% of the full load current rating of the motor or sum of multiple motors and auxiliary motors, and be protected from fire exposure to provide continuing operation during a fire as required by the National Building Code of Canada (see Appendix G).

Rule 32-202 outlines the requirements for wiring methods of fire pumps to be installed in metal raceways, in armour or metal sheathed cable, selected in accordance with Rule 4-888(1), in rigid non-metallic conduit embedded in concrete, or electrical non-metallic tubing embedded in concrete.

Rule 32-204 provides that a separate service box for a fire pump and equipment may be installed in conformance with rule 32-206 below and, notwithstanding rule 6-102(2), may be located remote from other service boxes.

Rule 32-206 requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box and the fire pump transfer switch or controller, except a circuit breaker that is permanently labelled identifying it as a fire pump disconnect. In addition, the circuit breaker must be lockable in the closed position and may be in the separate service box as in rule 32-204 above. In the case where this circuit breaker is installed in an emergency power supply circuit between the emergency power source and the fire pump transfer switch, the rating of the circuit breaker shall be as per rule 28-200. Where it is installed in a normal supply circuit the rating should be not less than the overcurrent protection of the fire pump controller.

Rule 32-208 requires that where an on-site electrical transfer switch is used to provide emergency power supply to a fire pump, it must be provided solely for the fire pump, located in a barriered or separate compartment or enclosure, permanently labelled as the fire pump power transfer switch, and approved for fire pump service. Where more than one fire pump is provided, a transfer switch is required for each fire pump.

Rule 32-208 provides that overload and overheating protection for branch circuit, control or equipment conductors shall not be required but shall be protected by the motor branch circuit overcurrent device.

Rule 32-210 specifies that ground fault protection shall not be installed in a fire pump circuit.

In the next instalment, we will be discussing Section 34 – Signs and Outline Lighting.

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting, billburr@gmail.com.

Related Articles


Latest Articles

  • Alberta Municipalities EV Charging Installation Rebate

    Alberta Municipalities EV Charging Installation Rebate

    April 4, 2025 Alberta Municipalities are proud to provide financial rebates for applicants to purchase and install electric vehicle charging stations in Alberta as part of the Electric Vehicle Charging Program (EVCP), funded by Natural Resources Canada (NRCan) & Alberta Municipalities.  The funding will cover up to 46% of your total project cost, which can… Read More…

  • Industry Legend Bill Smith Retires

    Industry Legend Bill Smith Retires

    April 4, 2025 By Electro-Federation Canada On March 25, Electrozad, a Sonepar Company, hosted a special retirement reception at Caesars Windsor for industry titan Bill Smith who marked an incredible 50-year career with the company.  The reception was held in the elegant Caesars Ballroom, which featured an array of food stations and elegant decor. In… Read More…

  • Schneider Electric: Your Trusted Partner in Sustainability and Efficiency

    Schneider Electric: Your Trusted Partner in Sustainability and Efficiency

    April 4, 2025 By Krystie Johnston Schneider Electric is on a mission to be the trusted partner in sustainability and efficiency. Since 1836, they have pioneered technological innovation to create a world where life is on. Frederick Morency, Vice President of Sustainability, Strategic Initiatives & Innovation at Schneider Electric Canada, has experienced this joie de… Read More…

  • The Evolving Landscape of Energy Management in Buildings with Trilliant’s Steven Lupo: AMI, EV Charging, DERs & Beyond Metering

    The Evolving Landscape of Energy Management in Buildings with Trilliant’s Steven Lupo: AMI, EV Charging, DERs & Beyond Metering

    March 31, 2025 By Blake Marchand Late last year Trilliant announced partnerships with Oshawa Power and Milton Hydro to enable suite metering and advanced metering technology using their Smart Building Platform. Those partnerships were the jumping off point for my conversation with Steven Lupo, Managing Director, North America at Trilliant, a company with four decades of innovation in Canada… Read More…


Changing Scene

  • NSAA Fee Change Effective April 1, 2025

    NSAA Fee Change Effective April 1, 2025

    As of April 1, 2025, the Nova Scotia Apprenticeship Agency’s fees have changed due to the 1% reduction in HST in Nova Scotia. NSAA noted on their website that due to the number of references across various pages, you may still come across old fee amounts as they work through updating their website. Here is… Read More…

  • Nominations Open for 2024 NETCO Leadership Excellence Award

    Nominations Open for 2024 NETCO Leadership Excellence Award

    Established in 2016, the NETCO Leadership Excellence award honours an industry training professional for his/her role for the success and their outstanding contributions to apprenticeship training and continuing electrical training. Read More…

  • Munded Partners with Kane Test Equipment in Atlantic Canada

    Munded Partners with Kane Test Equipment in Atlantic Canada

    April 4, 2025 Munden Enterprises has announced a partnership with Kane Test Equipment to bring their test and measurement solutions to Atlantic Canada. “We are now excited to announce a new and promising partnership with Kane Test Equipment. Kane Test Equipment brings innovative solutions that align with our dedication to providing the best tools for… Read More…

  • Nedco Announces Western Canadian Wire & Cable Sales Manager

    Nedco Announces Western Canadian Wire & Cable Sales Manager

    April 4, 2025 Don Blake has joined Nedco as their Western Canadian Wire & Cable Sales Manager. “With over 20 years of experience in the Wire & Cable industry, Don brings a wealth of knowledge and expertise to our Nedco West team,” said the company on LinkedIn. “His focus will be on expanding our product… Read More…