Guide to the Canadian Electrical Code, Part I — Instalment 7

Wiring Methods

 

William (Bill) Burr

The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.In this article: Section 12 — Wiring Methods.

It should be noted that while many other sections of the code are commonly used by designers, installers and regulators, Section 12 is mostly used byelectricians, who must clearly understand all aspects of wiring, and by electrical inspectors, who audit compliance of the wiring methods with the code requirements. Electrical inspection authorities must always be consulted on specific issues related to wiring methods.

Section 12 is a general section and applies to all wiring installations except for
•    Class 2 circuits
•    community antenna distribution and radio and television circuits
•    opticalfibre cables
•    communication circuit conductors
•    conductors integral to factory-built equipment

That is, unless specified in the respective code sections covering those type of installations. We will discuss this later when dealing with Sections 16, 54, 56, and 60in future instalments.

The rules of this section may also be modified by the provisions of Section 32 — Fire alarm systems, Section 36 — High voltage installations or Section 45 — Emergency power supply, unit equipment exit signs and life safety systems.

Section 12 of the Code is divided into six parts:
•    General Requirements
•    Conductors
•    Raceways
•    Cablebus
•    Manufactured wiring systems
•    Installation of boxes, cabinets, outlets and terminal fittings

Generally the definitions in Section 0 apply throughout, but there are some special terminology definitions in the sub-section rules covering flat conductor cable type FCC.

In the General Requirements part, rules 12-010 to 12-020 apply specifically to locations where fire, mechanical, moisture or other environmental issues must be considered or locations where wiring may be prohibited, such as ducts and plenum chambers, underground installations, hoistways, lightning down conductors, entry of raceways and cables into buildings, and wiring under raised floors for data processing.

The Conductors part includes the rules applying to the installation of all types of conductors.It is divided into a general subdivision and individual subdivisions for each type of conductor.

In the General subdivision of Conductors,Rule 12-100 establishes that types of conductors must be chosen for their location with respect to moisture, corrosive action, temperature, degree of enclosure and mechanical protection as set out in Table 19. The Appendix B notes offer additional specifications on choosing the appropriate type of conductor.

Rules 12-102 to 12-120 provide general considerations for the installation of all conductors, such as:
•    the treatment of insulated conductors
•    flame test coverings
•    multi- and single-conductor cables
•    conductors in parallel
•    radii of bends in conductors
•    conductor joints and splices
•    treatment of the ends of insulated conductors
•    termination of conductors
•    termination and splicing of aluminum conductors
•    supporting of conductors

You will find, again, that extensive notes in Appendix B provide additional helpful information, including a diagram outlining configurations for installing parallel conductors.

The rest of the Conductor subdivision deals with the rules for specific types of conductors:
•    open wiring Rules 12-200 to 12-224 apply to single conductors run as open wiring (colloquially referred to as “knob and tube wiring”)
•    exposed wiring on exteriors of buildings and between buildings on the same premises —Rules 12-302 to 12-318
•    barebusbars and risers —Rules 12-400
•    non-metallic-sheathed-cable: Rules 12-500 to 12-526 (NMSC)
•    armoured cable —Rules 12-600 to 12-618
•    mineral-insulated cable, aluminum-sheathed cable, and copper-sheathed cable —Rules 12-700 to 12-716
•    flat conductor cable Type FCC —Rules 12-800 to 12-824

The third part, Raceways, includes the rules applying to the installation of all types of raceways.It is divided into a general subdivision and subdivisions for each type of raceway.

The General subdivision,Rules 12-902 to 12-944, governs the installation of all
•    raceways and conductors run in raceways
•    types of conductors and cable suitable for use in raceways as per Table 19
•    conductors in raceways
•    protection of conductors at the ends of raceways
•    inserting conductors in raceways
•    conductors, in conduit and tubing
•    joints or splices within raceways
•    stranding of conductors, electrical continuity of raceways
•    mechanical continuity of raceways
•    junction of open wiring and raceways
•    entry of underground conduits into buildings
•    raceways installed underground or where moisture may accumulate
•    metal raceways in plaster
•    protection for raceways installed in concrete, cinder concrete, and cinder fill
•    raceways completely installed before conductors are installed
•    capping of unused raceways
•    maximum number of bends in raceways
•    metal raceways embedded in slabs, pavement or roadbeds

The rest of the Raceways part documents the rules for specific types of raceways:
•    rigid and flexible metal conduit:Rules 12-1000 to 12-1014
•    rigid PVC conduit: Rules 12-1100 to 12-1124
•    rigid types EB1 and DB2/ES2 PVC conduit: Rules 12-1150 to 12-1166
•    rigid RTRC conduit: Rules 12-1200 to 12-1220
•    liquid-tight flexible conduit: Rules 12-1300 to 12-1308
•    electrical metallic tubing: Rules 12-1400 to 12-1414
•    electrical non-metallic tubing: Rules 12-1500 to 12-1514
•    surface raceways: Rules 12-1600 to 12-1614
•    underfloor raceways: Rules 12-1700 to 12-1718
•    cellular floors: Rules 12-1800 to 12-1820
•    auxiliary gutters: Rules 12-1900 to 12-1904
•    busways and splitters: Rules 12-2000 to 12-2020
•    wireways: Rules 12-2100 to 12-2112
•    cable trays: Rules 12-2200 to 12-2210

The fourth part, Cablebus, includes the rules applying to the installation of cablebus as a complete system.Rules 12-2252 to 12-2260 include:
•    the use of Cablebus
•    methods of installation
•    connection to other wiring methods
•    provisions for bonding
•    ampacities of conductors in cablebus

The fifth part, Manufactured wiring systems, includes Rules 12-2500 and 12-2502 specifying the uses permitted, and Installation of Manufactured wiring systems

The sixth sub-section, Installations of boxes, cabinets, outlets, and terminals, includes Rules 12-3000 to 12-3036 that cover
•    outlet boxes
•    outlet box covers
•    terminal fittings
•    terminal fittings behind switchboards
•    boxes in concrete construction
•    outlet box supports, boxes, cabinets and fitting supports
•    accessibility of junction boxes, outlet boxes, cabinets and fittings
•    outlet boxes attached to existing plaster work
•    outlet boxes, etc., in damp places
•    entrance of conductors into boxes, cabinets and fittings
•    unused openings in boxes, cabinets, and fittings
•    extensions from existing outlets
•    multi-outlet assemblies
•    conductors in boxes, cabinets or fittings
•    wiring space in enclosures
•    maximum number of conductors in a box,
•    pull box or junction box sizes

 In the next installment we will be discussing Section 14 — Protection and control.

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…

  • EB Horsman Unveils New Mural at Campbell River Branch

    EB Horsman Unveils New Mural at Campbell River Branch

    July 14, 2025 EB Horsman & Son are thrilled to unveil a new mural at their Campbell River branch, painted by the talented Kwakwaka’wakw artist, Adam Lewis. “This stunning piece celebrates Indigenous heritage and our community spirit,” said EB Horsman on LinkedIn. “As we mark 125 years of serving Western Canada and 55 years in… Read More…

  • Glenco Electric Celebrate New Red Seal Team Members

    Glenco Electric Celebrate New Red Seal Team Members

    July 14, 2025 “The Red Seal Journeyman designation is the highest recognition in the trades, and we’re proud to have seen so many of our team members earn it under our watch,” said Glenco Electric on LinkedIn. “At Glenco, we’re big on mentorship and promoting from within. When you combine that with driven, hard-working professionals,… Read More…

  • Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    July 14, 2025 The governments of Canada and Ontario are investing up to $3 million and launching the third intake of the Agricultural Stewardship Initiative (ASI) to help farmers implement projects to improve the energy efficiency of their farming operations. To support the province’s plan to protect Ontario, this funding will help local agriculture, agri-food… Read More…