Users of the Canadian Electrical Code, 23rd edition will see a completely re-written Section 62 covering fixed electric heating systems. Advances in new heating technologies as well as increases in electric heating efficiency at the point of use have seen growth in industrial, commercial and residential applications. Changes to Section 62 include these new applications as well as a complete re-organizing of existing requirements. Rules that duplicated requirements or were repeated for different installations have been combined.Significant entries have also been included within Appendix B to assist with clarification.This article will attempt to simplify the requirements and illustrate the total overall change within Section 62.

Heating technology

Fixed electric space heating refers to the application of providing heat to an enclosed space or room for the comfort of persons or animals, or simply to maintain a specific temperature required by products stored within that room.Electric heaters provide heat in a room by radiation, conduction or convection.Understanding these heating methods helps to understand installation requirements, including clearances.

Radiant heating is heat energy transferred in the form of electro magnetic radiation. A common example is the warmth of the sun.Fixtures generating radiant heat will have very specific clearances from combustible and non-combustible materials.

Convection heating is simply the movement of heat by air. This is also known as forced air. However, not all convection heating is forced air. The natural movement of air over a heating element causes hot air to rise within a room. The heated or hot air will eventually cool and fall back down to the floor, circulating through the heater and repeating this cycle.Fixtures producing convection heat will also have specific clearances from combustible and non-combustible materials.

Conduction heating is the transfer of heat energy between objects that are in physical contact with each other.This type of heating is common in industrial applications where tanks, piping and vessels must be heated to ensure their contents do not freeze.These heating technologies will have virtually no clearance requirements from the surfaces they are designed to heat. However, clearances from other adjacent surfaces may need to be observed.Additionally, a maximum temperature limit will come in to play with some applications.

Section 62: scope

Revisions to the scope of Section 62 now include all fixed heaters, including fixed electric space heating systems for rooms and similar areas, fixed surface heating systems, and fixed heating that is not considered as space heating or surface heating.Examples of these three heating systems have been tabulated and are listed in the Appendix B note to Rule 62-000 and include:

• central heating units
• baseboard heaters
• radiant heaters
• wall and ceiling heaters
• floor warming heaters
• pipe heating
• storage tank or vessel heating
• snow and/or ice melting
• Skin effect heating
• pipe internal heaters, often referred to as “gut” heating
• immersion heaters
• hot water tanks

General (100 Series) Rules

Several changes have been made to the General Rules (100 Series) of Section 62.Rules of a general nature that were scattered throughout the section have all been consolidated.Additionally, several rules that repeated themselves in the previous edition CE Code have been rewritten once for clarity.This simplifies the meaning and lets code users know that the rules specified under the General Rules apply to all heating installations except where otherwise specified.The following is a summary of the changes to the General Rules, 62-102 to 62-128.

• Heating devices shall be assembled and installed “following manufacturer instructions.”This is stated just once as opposed to several times as in previous editions of the code, Rule 62-102(1).
• CE Code Part ll standards require electrically conductive coverings, braids, etc. on all heaters. Rule 62-102(2) requires that these coverings be bonded to ground.
• Special Terminology (62-104 Definitions) includes standardized cable and panel definitions, and has changed “Fixture” to “Heating fixture.”The generic term “Heating device” includes all heaters and has added definitions forbare element water heater, dielectric heating, impedance heating, induction heating, and skin effect trace heating.
• Wet conditions are stated in AppendixB Note to Rule 62-106 as concrete slabs or masonry in direct contact with earth or drains, e.g., showers,but not where isolation measures are installed, e.g., a membrane.
• One requirement has been set for maximum temperature adjacent to combustible materials: 90oC, Rule 62-112.
• The previous requirement not allowing a flammable fluid to be heated above its flash point (62-118(3)) has been deleted.
• All ground fault protection requirements were consolidated into one general rule, (62-116), with exemptions for industrial establishments under certain conditions. Additional exemptions apply to heaters on Class 1 extra-low-voltage power circuits with an ungrounded secondary isolating transformer.
• A demand factor relaxation was added for cyclic loads.
• Updates were made to field repair, modification or assembly of series heating cable sets(62-126).

Space heating (200 Series)

These rules (62-200 to 62-222) have also seen several changes with edits tobetter match the topic area. The rules cover fixed electric space heating systems for heating rooms and similar areas, and now recognize surface heaters and wall heating. One of the significant changes includes the addition of Table 67, which identifies clearance requirements of installed heating systems. Temperature limits shown in Table 67 were derived from the Maximum Temperature Table in C22.2 No. 130, reproduced in Appendix B. Additionally, five diagrams (B62-1 to B62-5) were added to Appendix B,illustrating examples of clearances in residential applications. The maximum temperatures for heater contact with materials are

• 150oC for masonry, concrete, etc., 62-210(2)
• 90oC for combustible material, 62-112

The requirements for sauna heaters have also been included within the 200 Series (62-222) with a few changes.

Surface heating (300 Series)

The 300 series of rules (62-300 to 62-314) covers fixed surface heating systems for pipe heating, melting of snow or ice on roofs or concrete or asphalt surfaces, soil heating, and similar applications other than space heating. Substantial changes were made to applications of heating systems under sidewalks, driveways, and similar areas whereby the non-safety requirements (clearances, separations, wattages, etc.) associated with these installations were moved to the informative Appendix B, leaving the rules to address the safety related requirements. Other notable changes include:

• The 90oC Max Temp. requirement changed, applyingonly to adjacent combustible materials and now in the General (100) section.
• 750 V limit for parallel cables has been deleted (this is covered in the product standard).
• The requirement for marking has been changed to requirements for caution labels, with subrules added to define the frequency of these labels.
• Requirements for skin effect trace heating systemshave been added (62-314), including an Appendix Bnote and diagram (B62.6)

Other heating (400 Series)

Lastly, the 400 Series (62-400 to 62-410)was revised to bring the requirements for heating cable sets and heating panel set installed within pipes, ducts or vessels up to date. Pipeline resistance heating is now referred to as pipeline impedance heating, and several rules have been moved from Section 26 for infrared drying lamps, water storage tanks, dielectric and induction heating, and bare element water heaters.

Additional changes and the re-organization of Section 62 rules will continue to take place. Requirements are in the works for heating within hazardous locations as well as Induction heating. Advances will also take place with skin effect heating and impedance heating systems. With the changes to this 2015 CE Code, Section 62 is posed to accept new heating technologies and any new safety requirements. While this article covers a very general view of section 62, it is incumbent on the Code user to review all the changes and apply the rules accordingly. It should also be noted that while this 2015 CE Code is published and available, to date it has yet to be recognized by anyprovincial or territorial authority having jurisdiction (AHJ). Code users should contact their Inspection authority to determine when this code becomes law within you jurisdiction.

More from Pierre McDonald:
Conductor Ampacities and Their Temperature Rating
– Code and Public Safety
– Establishing When the CE Code Becomes Mandatory
– UL Code Link
– CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories
– Canadian CE Code Changes: Section 20 and More
– Meeting National Building Code of Canada Requirements


 

Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

 

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…

  • EB Horsman Unveils New Mural at Campbell River Branch

    EB Horsman Unveils New Mural at Campbell River Branch

    July 14, 2025 EB Horsman & Son are thrilled to unveil a new mural at their Campbell River branch, painted by the talented Kwakwaka’wakw artist, Adam Lewis. “This stunning piece celebrates Indigenous heritage and our community spirit,” said EB Horsman on LinkedIn. “As we mark 125 years of serving Western Canada and 55 years in… Read More…

  • Glenco Electric Celebrate New Red Seal Team Members

    Glenco Electric Celebrate New Red Seal Team Members

    July 14, 2025 “The Red Seal Journeyman designation is the highest recognition in the trades, and we’re proud to have seen so many of our team members earn it under our watch,” said Glenco Electric on LinkedIn. “At Glenco, we’re big on mentorship and promoting from within. When you combine that with driven, hard-working professionals,… Read More…

  • Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    July 14, 2025 The governments of Canada and Ontario are investing up to $3 million and launching the third intake of the Agricultural Stewardship Initiative (ASI) to help farmers implement projects to improve the energy efficiency of their farming operations. To support the province’s plan to protect Ontario, this funding will help local agriculture, agri-food… Read More…