In January 2021, the International Code Council published the 2021 version of the International Energy Conservation Code (IECC), which has been updated every three years since 2000. This new version reduces lighting power allowances, expands mandatory controls requirements, and issues clarifications.

This article starts with some background about commercial building energy codes and then describes the major lighting control requirements in 2021 IECC, highlighting significant changes from the 2018 version. The most significant changes in the control requirements include the addition of daylight-responsive control for secondary daylight zones, plug load control, parking garage lighting control, and corridor lighting control.

A line-by-line comparison of the 2021 and 2018 versions was conducted to produce this article; if you see anything significant that we missed or any other errors (as this document may include errors and involves some interpretation, it obviously should not be used as a substitute for the code), please let us know. For greater specificity, consult the actual language in the IECC. For ultimate interpretation, consult the authority having jurisdiction.

Purpose of energy codes

Commercial building energy codes regulate the energy-efficient design of buildings. States and other jurisdictions adopt them and require compliance.

Scope of IECC 2021

IECC 2021 applies to various energy-using systems installed in building new construction, additions, and alterations, including electric lighting. For alterations, all of the lighting provisions must be followed for the newly installed lighting system except if less than 10% of the luminaires are replaced and these new luminaires do not increase the installed lighting power.

The lighting section (C405) contains prescriptive and mandatory provisions focused on lighting power allowances, lighting controls, and commissioning. The lighting control requirements apply to all lighting except 24-hour emergency or security lighting, emergency egress lighting that is off during normal building operation, and lighting for interior egress stairways, ramps, and passageways. Otherwise, each requirement may include its own particular exemptions.

Lighting control

Conceptually, IECC 2021 aims to minimize energy consumption by automatically reducing or turning off lighting when it is not being used based on three inputs: occupancy, a time event, or ambient light level. Additionally, various manual controls are required for occupant convenience and additional energy savings with light reduction, and zoning restrictions ensure independent control of lighting where needed. Commissioning requirements ensure the lighting control system is functionally tested and supported by construction documents.

Compliance paths

With the 2018 version, the IECC began offering two paths for interior lighting controls compliance. The first is a discrete approach that satisfies all the applicable requirements. The other is simpler, being based on use of luminaire-level lighting controls (LLLC) along with occupancy sensors, specific application controls, and manual controls. These luminaires feature independently operating and configurable onboard controls that automatically raise or lower light output based on occupancy or ambient light level.

Occupancy sensing (C405.2.1)

Occupancy sensors can be used where appropriate to satisfy requirements for interior automatic shutoff, but they are specifically required in a range of spaces. These are usually smaller, enclosed spaces such as classrooms and private offices but also include larger spaces such as warehouses and open offices, which can be divided into smaller zones with dedicated occupancy sensor control.

What’s new in IECC 2021: Corridors are now specifically listed as one of the applications requiring occupancy sensors and have their own section with specific requirements.
Where occupancy sensors are installed, a separate manual space control is not needed. However, the sensor must incorporate a manual OFF switch. Otherwise, the sensor must turn the lights OFF within 20 minutes of the space being vacated and feature manual-ON or auto-ON-to-maximum-50-percent-power operation.

Occupancy sensors are required in warehouse aisles. Here, the sensor must reduce lighting power by no more than 50% after the aisle becomes vacant. The sensor must be zoned to a single aisle and not control any lighting outside the aisle.

What’s new in IECC 2021: The previous version of IECC required sensors to reduce lighting power by at least 50%. This was changed to “no more than 50%,” a minor but significant change. Additionally, occupancy sensors appear to no longer be specifically required in open areas in warehouses, where time-switch control now appears to be required. Finally, a manual control is now required to turn OFF lighting in the space.

Occupancy sensors are also required in open offices. if the open office is smaller than 300 sq.ft., the usual occupancy sensor provisions apply. If 300 sq.ft. or larger, the sensors must control general lighting up to a 600-sq.ft. control zone and either turn off or reduce lighting power by at least 80% (with a reasonably uniform illumination pattern) within 20 minutes when the zone is vacant. If all occupants leave the entire open office space, the sensors must turn off all general lighting within 20 minutes, or a time-switch control must provide this on a scheduled basis.

What’s new in IECC 2021: A provision that daylight-responsive controls sharing the space will only activate general lighting if occupancy is also detected has been removed. A provision was added that the sensor in a zone may automatically turn the lighting on upon occupancy; lighting in other zones still unoccupied may activate as well if this is desired, but at no more than 20% of full power.

Also new to IECC 2021 is a section covering occupancy control function in corridors. Unless the corridor is lighted with a bare amount of illumination required for safety, lighting power must be uniformly reduced by no more than 50% within 20 minutes of the space becoming unoccupied.

Time-switch controls (C405.2.2)

Where occupancy sensors are not installed, time-switch controls must be installed, with notable exceptions. The control must feature a minimum seven-day clock, backup capability in the event of power interruption, and “holiday” programming.

Users must be given override capability via a manual switch that is limited in zoning to 5,000 sq.ft. and keeps the lights on for no longer than two hours. In certain large facilities such as mall concourses and sports arenas, the override time may be longer (if switch is a captive key device) and the control area may be up to 20,000 sq.ft.

What’s new in IECC 2021: Perhaps to address any confusion, the code now specifically points out that the time-switch control is to be used to automatically turn lighting off when a space is scheduled as being unoccupied. Additionally, a light reduction exemption was moved from this section to where it belongs, under light-reduction controls.

Light-reduction controls (C405.2.3)

Where occupancy sensors (featuring an on/off switch) and daylight-responsive controls are not required, a manual control capable of light reduction must be installed. Some spaces require a manual control but not light reduction, including spaces with only one low-wattage luminaire, spaces with very low lighting power density (<0.6W/sq.ft.), and corridors, lobbies, and electrical/mechanical rooms. Occupants must be able to use the manual control to reduce lighting by at least 50% with a reasonably uniform illumination pattern.

What’s new in IECC 2021: Compliant light-reduction options are now clearer and more in line with the LED era. These options include continuous dimming of all luminaires from full to less than 20% of power, switching all luminaires to 30-70% of full power, and alternate switching of luminaires or luminaire rows to 30-70%.

Daylight-responsive controls (C405.2.3)

IECC 2021 requires that general lighting in daylight zones feature daylight-responsive controls that independently control the lighting, with exceptions. IECC defines the dimensions of these daylight zones based on whether they are sidelit (adjacent to vertical fenestration such as windows) or toplit (under fenestration such as skylights).

What’s new in IECC 2021: IECC 2021 now identifies secondary daylit zones, which potentially doubles the reach of daylight-responsive control. IECC 2021 also recognizes a rooftop monitor as producing sidelit illumination. The code recognizes projection factor (shading by overhanging projections) as potentially limiting the utility of implementing daylight-responsive control. Finally, daylight zones in atrium spaces must be established at the top floor surrounding the atrium and not any intermediate floors.

The control must be automatic and provide continuous dimming down to 15% of full light output or lower and capable of turning the lights off. They must be configured so they can be calibrated within the space, with the calibration means readily accessible.

What’s new in IECC 2021: The continuous dimming to at least 15% of full output or lower is now required in all zones with daylight-responsive control, not just a few applications. In warehouses, open offices, and corridors where occupancy sensing produces a light-reduction effect, daylight-responsive controls may reduce power further but not raise it above the level set by the occupancy sensor.

Special applications (C405.2.4)

IECC 2021 designates control requirements for special applications such as display lighting and supplemental task lighting. These luminaires must be controlled by either an occupancy sensor or time-switch control for automatic shutoff, plus a manual control enabling them to be controlled separately from the general lighting.

Meanwhile, lighting for nonvisual applications such as plant growth must be served by an independent time-switch control. Lighting within sleeping units in buildings such as hotels must be turned off within 20 minutes of the room being unoccupied, along with all switched receptacles.

What’s new in IECC 2021: This section now includes in its covered list luminaires for which additional lighting power is claimed when using the space-by-space method. It also includes display lighting for gallery, museum, and monument exhibit lighting that is in addition to the general lighting. Healthcare task lighting must be provided with a manual control.

Parking garage lighting controls (C405.2.8)

IECC 2021 requires lighting controls in parking garages.

What’s new in IECC 2021: The latest version of the model code contains an entirely new section dedicated to parking garage control. Parking garage lighting must be controlled by either an occupancy sensor or a time-switch control. Additionally, lighting power must be automatically reduced based on occupancy with a time delay of 20 minutes and a control zone limited to a maximum of 3,600 sq.ft. At entrances and exits where light affects eye adaptation between indoor and outdoor brightness levels, lighting must be reduced by at least 50% between sunset to sunrise.

Plug load controls (C405.11)

Both previous versions of IECC and the 2021 version require power receptacle control in sleeping units, where they may be swept OFF using an occupancy sensor or card key control.
What’s new in IECC 2021: IECC 2021 now contains new general receptacle control requirements.

Specifically, at least 50% of all permanently installed 125V, 15A and 20A receptacles installed in certain applications such as enclosed offices, workstations, and classrooms must be controlled. At least 25% of branch circuit feeders installed for modular furniture not shown on the plans must be controlled.

The control function may be based on split-controlled receptacles (top controlled) or separate controlled receptacles must be installed within a foot of each uncontrolled receptacle. All controlled receptacles must be marked per NFPA 70 and uniformly distributed.

The receptacles may be controlled either on a scheduled basis using a time-switch control, via an occupancy sensor with a 20-minute time delay, or via a signal from another control or alarm system.

Exterior lighting controls (C405.2.7)

Exterior lighting must be turned off when sufficient daylight is present. Building façade and landscape lighting must be automatically turned off during the night when it is no longer needed. All other exterior lighting — typically operating dusk to dawn — must be reduced during the night based on time or occupancy.

[BF/IT]What’s new in IECC 2021[BF/IT]: Dusk-to-dawn lighting power must be reduced by at least 50%, not 30%, after hours. Outdoor parking lot luminaires greater than 78W and with a mounting height of 42 feet or less must be controlled with an occupancy sensor that reduces power by at least 50% with a 15-minute time delay. For control of such luminaires, control zoning is limited to 1500W of lighting power.

Additional energy efficiency requirements (C406)

Buildings complying with the 2021 IECC must enhance energy efficiency by choosing various options such as renewable energy and recovered or renewable water heating. Two of the options cover lighting and controls.

What’s new in IECC 2021: The table has been expanded into a credit system. New buildings are required to gain 10 credits from among 15 options. Between lighting and controls, 10 points can be gained.

For lighting, lighting power density (LPD) must be achieved that is at least 10 or 15% below the model code’s maximum LPD values. This option is valued at 8+ credits.

For lighting controls, digital controls must be implemented with compact control zoning of luminaires for maximum granularity of response. The digital lighting control system must be capable of continuous dimming, individual luminaire addressability, load shedding, and reconfiguration, same as in IECC 2018. What’s new in 2021 is giving occupants individual control of overhead general lighting is no longer required. This option is valued at 2 credits.

Testing and documentation (C408.3)

All lighting controls must be set up in accordance with approved documents and manufacturer instructions, and performance verified through testing. This ensures that the project team delivers a lighting and control system that operates as specified. Specific functional testing is indicated for different control types.

At the conclusion of the project, the owner must be given certain documentation about the lighting and control system so that they can maintain it. This is in addition to documentation provided by the functional testing party that the installed controls meet or exceed specified performance criteria.

Documentation requirements include a lighting and control narrative, operating and maintenance manuals, submittal data indicating all selected options for lighting and controls, a schedule for inspecting and recalibrating lighting controls, and more.

2021 IECC decoded

Commercial building energy codes continue to become increasingly restrictive in regard to lighting and controls, and the 2021 version of the IECC is no exception.

In the future, commercial building energy codes may evolve toward becoming focused on energy consumption rather than initial design power and control capability. In the meantime, IECC 2021 is likely to be adopted and used.

Designers in jurisdictions likely to implement the 2021 version of the IECC should start to become familiar with its requirements, as there are some significant changes, particularly in regard to controls.

For more information, consult the 2021 IECC: https://shop.iccsafe.org/2021-international-energy-conservation-coder.html

Craig DiLouie, LC, is Education Director for the Lighting Controls Association. Reprinted with permission of the Lighting Controls Association, www.lightingcontrolsassociation.org. The article has been lightly edited.

Five Tips to Find Time for Field Service Marketing

SimProTime is a precious resource that we all want more of. And if you own a field service business or work for one, you undoubtedly know how hard it is to find time for everything you need to accomplish in a workday, let alone a week, a quarter, or a year.

Like many of us, you do your best to check every item off of the to-do list during working hours while inevitably pushing lower priority items off to another day. And often, marketing your field service business is one of those things that easily falls to the wayside after being pushed back for more urgent matters.

Read More


Changing Scene

  • Prev
The federal governemnt has officially launched a call for proposals (CFP) for the  ...
The Electrical Contractors Association of BC (ECABC) has announced the impending departure of ...
The Minister of Employment, Workforce Development and Disability Inclusion, Carla Qualtrough was at ...
The launch of the Apprenticeship Service stands to help overcome financial barriers employers face ...
The National Electrical Trade Council (NETCO) is pleased to announce that they will be rolling out ...
43 years ago, Steve Silverstein bought a table saw and a delivery van and began a revolution in the ...
E.B. Horsman & Son (EBH) has announced their Victoria location will be officially moving to a ...
 The Maritime’s largest Mechanical and Electrical event took place last Wednesday and ...
IDEAL INDUSTRIES, INC. is calling all professional and student-apprentice electricians to come out ...
Vivi White has been appointed to the Board of Directors of the Electrical Safety Authority ...

Become a Wiser Approved Installer

Wiser Approved Installer

Get access to exclusive benefits, product discounts and resources that will help you drive more business, and lower energy bills for your clients.

 

 

 

Read More


 



Government of CanadaThe federal governemnt has officially launched a call for proposals (CFP) for the Zero-Emission Vehicle Awareness Initiative (ZEVAI). The initiative’s 2022 CFP will help fund new and innovative projects that aim to increase awareness and knowledge of ZEVs and charging and refueling infrastructure thereby increasing public confidence in these vehicles and their economic and environmental benefits.


Natural Resources Canada will provide funding through non-repayable contributions of between 50 and 75 percent of the total eligible project costs, with a maximum funding of up to $300,000 per project. The CFP will close on August 18, 2022.

Read more


 

Omnicable joins ETIMETIM North America announced that OmniCable has joined the product classification standards organization. Headquartered in West Chester, PA, OmniCable has 24 locations throughout North America, and also owns Houston Wire & Cable (HWC). The company partners with many electrical manufacturers and only sells to distributors.

According to John Dean, Director of Marketing & E-Commerce, OmniCable/HWC, “The wire and cable industry is often called commodities, but there are very distinct features and attributes for the different products our manufacturers produce. 

Read More

 


 

Atkore United Poly SystemsAtkore Inc. announced that it has acquired United Poly Systems, a manufacturer of High Density Polyethylene (HDPE) pressure pipe and conduit, primarily serving telecom, water infrastructure, renewables, and energy markets.

“We are pleased to complete the acquisition of United Poly Systems, which strengthens Atkore’s product portfolio, expands our manufacturing capacity and further enables us to meet HDPE customers’ needs,” stated John Pregenzer, President of Atkore’s Electrical business. “HDPE pipe and conduit is a growing market that is expected to benefit from U.S. infrastructure legislation, and United Poly Systems is a great addition to Atkore. We welcome these employees and look forward to working together to continue to serve and support our customers.”

Read More


 

Canadian Electrical Contractor Discussion Group: Can You Count the Deficiencies?

EIN CECD 400Have you ever been called to fix the work of a 'handyman'?

"Was supposedly done by a"certified ' electrician....told the homeowner that he got a $266 permit....no record at TSBC. Can you count the deficiencies?"

"There is a second panel change in the triplex also.......even more deficiencies. Think the guy was a glorified handyman. Ones not obvious: 240 BB heat hooked up 120....drier on 2p20....range on 2p50....water heater fed with 2c14 Bx on 2p15."

Go HERE to join the discussion

 


 

The Canadian Electrical Code for safer electrical installations

Canadian Standards Association

For over 90 years, the Canadian Electrical Code, Part I (CSA C22.1:21), has helped ensure the safety of electrical installations and protection of electrical workers. Its 2021 edition brought 200+ additions and updates that address energy storage systems, climate change adaptation, hazardous locations, and other important topics. To help users better understand and apply the Code, CSA Group developed additional resources and training.

Learn more about available Code packages and resources

 


 



 

Iron+EarthThe RenuWell Project partners are excited to announce the groundbreaking of two pilot sites located near Taber, Alberta. These pilot sites are the first of their kind to repurpose inactive oil and gas infrastructure as a foundation for renewable energy development and job creation.

When operating, the solar projects will generate 2,030 MWh annually – enough electricity to power 280 average Alberta households or irrigate 11,700 acres of farmland for an average year. This is roughly equivalent to $200,000 in electricity sales per year with 1,100  tCO2e savings in GHG emissions. Over a 25-year lifespan, the projects will generate 50,750 MWh, with GHG emission savings of 28,420 tCO2e.

Read More


 

David O'ReillyBy Elle Bremmer

Recently, I had the pleasure of sitting down with David O’Reilly, Vice President Home & Distribution and Secure Power Divisions with Schneider Electric Canada for a discussion regarding the Wiser EnergyTM smart home solution, the Wiser Approved training program, and his thoughts on several different subjects, including sustainability and future technologies currently in the works at Schneider Electric. David has been with the company for five and a half years in his role.

We recently published a study (version en français ICI) from Schneider Electric showing a strong interest from Canadians in smart home technology. 

Read More


 

SimplySnap: It Just Works.

SynapseSmart technology is only smart if it works, and SimplySnap? It just works.
Scalable, field-proven, DLC NLC 5.0 qualified, and easy-to-install wireless network
lighting controls are in-stock. Explore energy code compliant SimplySnap
technology here.

Read More

 


 

Product News

  • Prev
Alligator® water pump pliers from KNIPEX provide good access to the workpiece due to slim size of ...
The MX FUEL™ ROCKET™ Tower Light/Charger provides up to 27,000 lumens of task and area lighting and ...
Automate electrical system labelling and electrical panel directory creation (ditch the manual ...
The Ferret Plus brings you the ultimate innovation in inspection technology. Includes built-in (on ...
IDEAL® Pro Series Camo Zipper Pouches are a convenient storage solution for electrical tools, ...
The new WhisperAir Repair™ from Panasonic is a compact ceiling-mount air purifier that is effective ...
By pairing the sturdiness and performance of the Green Cable Concrete and the simplicity ...
Offering a wide range of high-quality industrial plugs and sockets complying with IEC 60309-1 and ...
Stanpro’s L1RHT is a high temperature, high lumen output, high impact resistant LED high bay rated ...
The nPODA Key is a low voltage, single gang, nLight decorator switch that offers additional ...


Ericson String LightsEricson announces upgraded versions of their extremely capable line of Industrial String Lights and SL, LED Stringlights. These new and updated products have several key features important when safe, code compliant lighting for industrial workspace is necessary.

Infinitely capable, these ruggedly built products have several industry leading & exclusive features including:

Industrial String Lights:

  • A United States Navy Specification since before WWII, they’re time and application tested...

 

Read More


 

 

Intermatic Pool and Spa SolutionIntermatic Incorporated announced its new P40000 Series Load Centers, a set of next-generation panels for pool-only applications, as well as its new PE24GVA 24-Volt Valve Actuator, an easy-to-install valve actuator that allows for tool-free cam adjustments. Both solutions remove obstacles for pool service professionals while delivering lasting performance.

“Intermatic load centers and valve actuators have been the preferred choice of pool professionals for more than 30 years,” says Brian Lamberty, product marketing manager at Intermatic. “The PE24GVA and P40000 Series build on that tradition, helping pool professionals streamline service calls while setting the standard for quality and performance.”

Read More


 

 

Klein Tools Zipper BagsKlein Tools introduces new Stand-up Zipper Bags, in a 2-Pack with 7-Inch and 14-Inch sizes, both designed to handle tough jobsite conditions and stand up so tools and small parts can be easily accessed when working.

Stand-up Zipper Bags, 7-Inch and 14-Inch, 2-Pack (Cat. No. 55559)

  • Perfect for storing pliers, wrenches, screwdrivers, drill bits and other small tools and parts
  • 4 1/2’’ tall zipper bags come in two sizes:
    • 14’’ (36.6 cm) dark gray
    • 7’’ (17.8 cm) royal blue


Read More


 

Emerson HV SafetyThe Occupational Safety and Health Administration (OSHA) estimates 350 employees are killed annually in electrocution accidents, which roughly equals one fatality per day. In the face of these dangers, OSHA officials and industry safety consultants alike recommend eliminating potential hazards on work sites, rather than simply relying on contractors or employees to follow safety guidelines.

To help safeguard employees from electrocution, Emerson has launched its Appleton™ Powertite™ Lock Collar, a device that fastens over plug and connector connections and is secured with a padlock, preventing unauthorized personal from disconnecting the cable connection once in place. 

Read More


 

Peers & Profiles

  • Prev
Watt’s the Word is a recently launched Electrical Industry Podcast hosted by Zack Hartle and ...
Allana Kellett-Jamieson loves working in the electrical sector and is proud of the great focus ...
As the head of ABB Canada's electrification business unit, Éric Deschênes is no newcomer to the ...
Karen Pullen knows what it’s like to be the only woman on a construction site, and as a proud ...
As of February 2021, Martin Stephenson is the new President and CEO of Signify Canada.   ...
This past July, Kerith Richards, who has worked for Service Wire Company for the last seven years, ...
EngWorks was formed in 2004 as an electrical engineering and consulting firm by Allan Bozek, “After ...
Headquartered in Concord, Ontario, Mercury Lighting services national retail, ...
Among the recipients of the 2021 Clean50 Awards announced last month is Carolina Gallo, Vice ...
Sarah Silverstein is a principal with Liteline along side her two brothers Mark and Daniel. ...

Copper $US Dollar price per pound

Kerrwil Publications Great Place to Work. Certified December 2019 - December 2020

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2022 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil