NH Switch-Disconnector-Fuses from Rittal

May 10 2016

Switching operations on low voltage installations always bear risks. If NH switch-disconnector-fuses are operated incorrectly, the resulting arcs can (in the worst case) even endanger lives. In order to protect people and technology, fast switching operations and defined switch points are a prerequisite. The new fast switching NH switch-disconnector-fuses with Rittal fuses now provide greater safety for operator-independent switching and disconnection with one device.

Rittal has now rounded off its range of NH fuse technology with its new NH switch-disconnector-fuse. High-speed circuit breakers make the use of a switch-disconnector-fuse as easy and safe as never before.

The fuse strip is switched, with the aid of a spring, by tilting a lever, thus permitting completely operator-independent and reliable switching. The integrated snap-action mechanism with its double-break thereby ensures a rapid switching procedure and a defined switching point.

In contrast with other high-speed circuit breakers, the NH switch-disconnector-fuse is installed vertically, so permitting a comfortable line connection from either above or below. A separate cable connection and routing chamber are thus unnecessary. The vertical design also has the advantage of offering more efficient heat dissipation than a horizontal type.

No drilling is required for contacting; fastening is performed with clamping screws or alternatively with screw fasteners. It is also possible to connect different types of conductors with screw or box terminals.

Safety for the operator is ensured by the advanced contact hazard protection for the connection space, as well as the separate front and rear cover of the connection area. Connection with an electronic fuse monitoring system is another option. Increased security is also ensured by the tool-locked cover, as well as by an integrated position-indicating device.

The new NH switch-disconnector-fuses are suitable for fuses of NH00 – 3. A double-break ensures voltage-free fuse replacement.

The new NH switch-disconnector-fuses form part of the Ri4Power 185-mm system solution, and they can be combined with component adapters and NH fused-switch disconnectors.

Find more at: www.rittalenclosures.ca and www.rittal.ca.

  >> Source ALL of your Canadian Electrical products in the Goldbook Directory <<

Related Articles


Latest Articles


Changing Scene

  • ABB Among TIME’s World’s Most Sustainable Companies

    ABB Among TIME’s World’s Most Sustainable Companies

    June 30, 2025 ABB has been ranked 14th in TIME’s “World’s Most Sustainable Companies 2025” and third in Switzerland across all industries. TIME and Statista assessed over 5,000 of the world’s largest and most influential companies, considering factors such as revenue, market capitalization, and public prominence. The top 500 companies from 35 countries and 21 industries were… Read More…

  • New Partnership to Deliver 1,000 Affordable Housing Units Across Quebec

    New Partnership to Deliver 1,000 Affordable Housing Units Across Quebec

    June 25, 2025 The governments of Canada and Quebec, together with Desjardins, have announced the construction of 1,000 new affordable housing units over the next three years. These housing units will be created as part of the Desjardins Affordable Housing Initiative, a partnership launched in 2022 that will now enable the delivery of over 3,000 affordable housing units… Read More…

  • CIB Closes $50M Loan with Dream Industrial REIT to Fund Large-Scale Commercial Building Upgrades

    CIB Closes $50M Loan with Dream Industrial REIT to Fund Large-Scale Commercial Building Upgrades

    June 30, 2025 The Canada Infrastructure Bank (CIB) and Dream Industrial Real Estate Investment Trust have finalized a $50 million loan to fund commercial property retrofits related to energy efficiency savings and emissions reductions at 34 warehouses in Alberta, Ontario and Quebec. With buildings currently accounting for 18% of Canada’s total emissions, investments from the… Read More…

  • Province, BC Hydro Launch Pilot Program to Cut Energy Costs, Support Housing Density

    Province, BC Hydro Launch Pilot Program to Cut Energy Costs, Support Housing Density

    June 25, 2025 In a Canadian first, the Province and BC Hydro have launched a pioneering pilot project in Vancouver that has the potential to set new standards for supporting growing housing priorities and densification in Canada. Designed to support the transition from single-family homes to multi-unit residences, the initiative is exploring how full electrification –… Read More…