Province, BC Hydro Launch Pilot Program to Cut Energy Costs, Support Housing Density

June 25, 2025

In a Canadian first, the Province and BC Hydro have launched a pioneering pilot project in Vancouver that has the potential to set new standards for supporting growing housing priorities and densification in Canada.

Designed to support the transition from single-family homes to multi-unit residences, the initiative is exploring how full electrification – heating, cooling, EV charging and appliances – can be achieved without the need for more significant electrical service upgrades.

“The potential for this innovative system shows what’s possible when we partner with local technology providers to make clean energy more accessible,” said Adrian Dix, Minister of Energy and Climate Solutions. “We’re proud to support made-in-B.C. solutions that reduce emissions, strengthen our grid and lower energy costs for residents.”

At the core of this project is a smart panel developed by Burnaby-based Evectrix, a key innovation supported through a $600,000 investment from the Province’s Innovative Clean Energy Fund and BC Hydro’s $700-million Energy Efficiency Plan. This device transforms a conventional breaker panel into a “smart hub” that manages real-time energy usage, in this case eliminating the need to upgrade from a 200-amp to a 400-amp service, even in an electrified six-unit development.

This pilot project is Canada’s first to demonstrate:

  • all-suite electrification in a multi-unit residential building without requiring a significant service upgrade;
  • a smart panel integration with advanced thermostats for greater suite-level energy control; and
  • management of multiple non-EV electrical loads, such as hot water, ranges and dryers, through a single smart panel.

Traditionally, densifying from single-family homes to duplexes, fourplexes and sixplexes has required significant electrical upgrades. This project explores a better path: the smart panel dynamically manages load at the suite level, helping avoid over-capacity while unlocking significant savings. The project is a scalable model for retrofitting and densification that could save thousands of dollars in infrastructure costs per project.

Special permission was given from the City of Vancouver in order for the project to be installed at the location. Through the Consortium for Power Efficient Design, BC Hydro continues working with partners to advocate for changes to the Canadian Electrical Code, expanding the use of energy management systems like the one being explored through this project.

“This technology pilot is a potential game-changer for accelerating clean-energy adoption in multi-unit housing,” said Chris O’Riley, president and CEO, BC Hydro. “It not only supports our broader goal of building a more sustainable and efficient electricity system, but it also helps customers avoid the high costs of major electrical upgrades – making densification more accessible, affordable and practical.”

Through its $700-million Energy Efficiency Plan, BC Hydro is significantly increasing investments in energy-saving tools, technologies, programs and rebates. These measures are expected to deliver 2,000 gigawatt hours in electricity savings – enough to power approximately 200,000 homes. The project, located on Vancouver’s Chestnut Street, is one of many innovative pilot programs now underway or in development, designed not only to reduce consumption today but to empower customers to manage their energy use more efficiently in the years ahead and save money.

If this approach proves successful, it could set the stage for more customer-focused energy solutions that help households and businesses lower their bills, reduce emissions and take advantage of smarter, more responsive grid technologies. These efforts are part of BC Hydro’s long-term commitment to delivering value, reliability and sustainability to customers as energy needs evolve.

Souce

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…