Greenlee® Pull Connect™: Intuitive, Synchronized Cable Pulling Solution

February 27, 2024

Greenlee®, a part of Emerson’s professional tools portfolio, recently introduced Pull Connect™, a pulling accessory with a simple, intuitive operation that wirelessly synchronizes both sides of a cable pull and allows it to be stopped from either side. This easy-to-use design allows cable pulling operators to focus on the pull for enhanced safety and confidence on the job site.

pull Connect

“Our team regularly hears from electrical contractors that team communication is their number one safety concern when pulling cable,” said Alex Carey, product manager, Greenlee for Emerson. “The Greenlee Pull Connect addresses those concerns with its ability to synchronize a pull, extend the signal and provide wireless communication.”

Pairing with existing Greenlee pulling equipment and designed to communicate through walls, floors and other obstructions for a synchronized pull, Pull Connect units are interchangeable, allowing them to be used in all modes (pull side, feed side and optional repeater). To help assure reliable communication, it can connect up to two repeaters, making it adaptable to nearly every job site.

Pull Connect is controlled by a foot switch for hands-free operation and provides visual cues to ensure noise is not a factor during pulls. A quick-stop button on the Pull Connect also allows the users further control of the pull. A water-resistant case and internal antenna protect from job site conditions and moisture, while its magnetic backing enables quick and easy mounting to pulling equipment.

Go HERE for more information

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4% Read More…


Changing Scene