Lind Equipment Launches LED Temporary High Bay Light for Construction Sites

March 30 2016

Lind Equipment’s newest addition to its Beacon Light line of portable LED floodlights, the LE-HB150LED LED temporary high bay light, is an integral part of the LED Jobsite suite of temporary site lighting for construction sites. The Beacon LED temporary high bay light drives huge electricity, labour and material savings for general contractors and electricians.

Temporary high bay lights are used in construction sites to light up large areas from heights greater than 15’. For retail stores, lobbies, and any area with a higher than normal ceiling height, the temporary high bay has been a staple of construction sites for many years. The Lind LE-HB150LED changes the equation by providing a more efficient and cost-effective solution than traditional bulb-based high bay lights.

With the use of high-efficiency LEDs, the LE-HB150LED puts out the same amount of usable light as a 400W metal halide high bay, but with only 150W of energy usage. This reduction in electricity usage alone can pay for the light on the first project. And unlike traditional bulb-based high bays, the Lind Equipment LED temporary high bay is built durable enough to be used again and again from project to project.

For general contractors and electricians, the savings from using the LE-HB150LED also come from a reduction in installation and maintenance activities. The LE-HB150LED comes out of the box with a daisy-chain outlet, allowing quick installation of multiple lights on one circuit without having to run dedicated cords. Because of its low energy draw, the LE-HB150LED can be daisy-chained up to 9 units on a single 15A circuit. In addition, because there are no bulbs to break or burn out, there is virtually no maintenance needed once the lights are hung.

The LE-HB150LED has a multitude of benefits over the traditional bulb-based high bays. In addition to the ones already listed, the LE-HB150LED will instantly start and restart in all weather conditions and doesn’t require a warm-up period like bulb-based high bays. It also does not generate dangerous heat like the metal halide bulb-based high bays.

Find out more: www.lindequipment.net/ledhighbay.

>> Source ALL of your Canadian Electrical products in the Goldbook Directory <<

Other Products:

Lind Equipment Releases New Brighter Version of LED Dock Light

 

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…

  • EB Horsman Unveils New Mural at Campbell River Branch

    EB Horsman Unveils New Mural at Campbell River Branch

    July 14, 2025 EB Horsman & Son are thrilled to unveil a new mural at their Campbell River branch, painted by the talented Kwakwaka’wakw artist, Adam Lewis. “This stunning piece celebrates Indigenous heritage and our community spirit,” said EB Horsman on LinkedIn. “As we mark 125 years of serving Western Canada and 55 years in… Read More…

  • Glenco Electric Celebrate New Red Seal Team Members

    Glenco Electric Celebrate New Red Seal Team Members

    July 14, 2025 “The Red Seal Journeyman designation is the highest recognition in the trades, and we’re proud to have seen so many of our team members earn it under our watch,” said Glenco Electric on LinkedIn. “At Glenco, we’re big on mentorship and promoting from within. When you combine that with driven, hard-working professionals,… Read More…

  • Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    July 14, 2025 The governments of Canada and Ontario are investing up to $3 million and launching the third intake of the Agricultural Stewardship Initiative (ASI) to help farmers implement projects to improve the energy efficiency of their farming operations. To support the province’s plan to protect Ontario, this funding will help local agriculture, agri-food… Read More…