Greenlee G-Series Smart Pull Cable Tension Monitoring System

July 27, 2016

Greenlee has developed the patent-pending G-Series Smart Pull, a real time cable pulling monitoring system that alerts contractors when a cable pull has met or is exceeding the amount of tension recommended by the cable manufacturer. This saves contractors time and money by avoiding overstretching the cable leading to faulty cable installation.

“We’ve learned that an overstretched cable can lead to diminished transmission capabilities and even a potential fire hazard,” says Sumeet Pujari, Greenlee Project Manager – Pulling + Fishing. “We also found that an overstretched cable can be costly to a contractor if a pull has to be reworked.”

The new Greenlee Smart Pull alerts the user when pulling force exceeds 80% of the cable’s limit. Physical, visual, and auditory warnings allow the worker to take action before the cable is damaged. A second alert is given when the pulling force has met 100% of the manufacturer’s recommended tension limit. The smart pull has an accuracy of +/- 2% up to a load limit of 10,000 pounds (44.48 kN). Information obtained during the pull is stored directly onto the smart pull’s 128MB of onboard memory. Pull data can be seamlessly exported via the onboard USB port or emailed directly through the PullCalc app.

“This proof of work helps contractors to avoid liability and provides building engineers with documentation that the cable was pulled to specification,” adds Pujari.

A modern touch screen interface makes the Smart Pull easy to operate. The on-screen prompts make setup simple, and the unit is equipped with Bluetooth technology, allowing connection to Greenlee’s PullCalc app. This application monitors pull force, speed, and distance in real time. An external USB port exports files in .CSV format. Files can also be transferred to the mobile app and emailed to other stakeholders.

The smart pull is compatible with rope sizes up to 7/8-inch diameter. The five-roller design holds the rope in place and maintains consistency to the sensor, eliminating the need to specify rope diameter. The smart pull operates on the 18V Makita battery platform, and is compatible with 1.5Ah to 5Ah batteries. A single 5Ah battery will run for 20 uninterrupted hours.

The lightweight skeletal design and roll handles make this device easy to handle on the jobsite. The product comes in a carrying case with mounting hardware, battery and charger. It is compatible with the existing Greenlee Mobile VersiBoom II and floor mounts.

The Greenlee Smart Pull is available exclusively at the following distributors:

• A.A. Casey Co.
• California Service Too
• Colonial Electric Supply
• Contractors Choice, Inc.
• Crawford Electric Supply
• Electrical Engineering & Equipment Company
• Fasteners Inc. Southwestern Supply
• Kovalsky-Carr Electric Supply Co Inc.
• Lumen
• McNaughton-McKay Electric Company
• Platt Electric Supply
• Total Tool Supply, Inc.
• Von Rohr Equipment Corporation
• WESCO

 

Related Articles


Latest Articles


Changing Scene

  • Nominations Now Open for 8th Biennial MEET Innovation Awards

    Nominations Now Open for 8th Biennial MEET Innovation Awards

    February 13, 2026 The Mechanical Electrical Electronic Technology Show (MEET) is pleased to announce that the ‘MEET Innovation Awards’ will return as part of the 2026 edition of the show. The purpose of these awards is to recognize innovative products in the industry. Individuals and businesses are encouraged to nominate themselves or others by completing this online form no Read More…

  • 2026 ECABC Hall of Fame Nominations

    2026 ECABC Hall of Fame Nominations

    February 12, 2026 On June 2nd, ECABC will hold a Hall of Fame Induction Ceremony as part of their Awards Gala Dinner at the Association’s 2026 Conference and AGM in Kelowna. ECABC would like to invite you to nominate an extraordinary individual from the electrical industry to join the organizations esteemed Hall of Fame! Induction into the Read More…

  • Canada Introduces New Auto Strategy by Expanding EV Charging Infrastructure Across the Country

    Canada Introduces New Auto Strategy by Expanding EV Charging Infrastructure Across the Country

    February 12, 2026  On February 5, Canada announced its new Automotive Strategy. The strategy includes a new five-year Electric Vehicle Affordability Program and enhanced charging infrastructure through investments through the Canada Infrastructure Bank’s $1.5-billion Charging and Hydrogen Refuelling Infrastructure Initiative. Canada has installed more than 30,000 electric vehicle chargers across the country through Natural Resources Canada’s Read More…

  • Nova Scotia & NSCC Launch Institute of Skilled Trades

    Nova Scotia & NSCC Launch Institute of Skilled Trades

    February 12, 2026 The Province and Nova Scotia Community College (NSCC) are launching the Institute of Skilled Trades (IST) to provide students and apprentices with modern training and equipment to develop the skills employers need – today and in the future. The IST and skilled trades training at NSCC will now be guided by an Read More…