Cree Extends IG Parking Luminaire Series

January 15, 2017

Cree, Inc. extends its IG Series LED parking structure luminaires to include a warmer colour temperature and standard 0-10V dimming for better light experiences with enhanced aesthetics and performance. The result is more choices that meet customer preference for warm, inviting light. Featuring Cree WaveMax Technology, the IG Series delivers low-glare comfort and defeats shadows for enhanced safety and visibility while delivering exceptional energy efficiency and fast payback.

“Parking structure operators are under constant pressure to lower operating costs while providing safe and visually appealing lighting,” says David Elien, Cree Senior Vice President and GM, commercial lighting. “With these new standard features, the high-performance IG LED parking structure luminaires not only outperform existing LED and metal halide solutions, but also offer a lower total cost of ownership while making a great first impression.”

The series offers enhanced performance and flexibility to meet code requirements with new, standard 0-10V dimming for Cree IG parking structure luminaires that do not include a factory installed sensor, enabling easy integration with advanced control systems to maximize energy savings. The increased functionality allows parking structure owners to integrate wireless or wired control systems for daylight harvesting, remote monitoring and occupancy sensor capabilities further reducing energy usage for an even lower total cost of ownership.

Available in 3000K, 4000K and 5700K colour temperatures, the highly efficient parking garage luminaires can deliver more than 80% energy savings and quick payback of less than two years compared to outdated metal halide lighting. Programmable motion controls further increase these savings and enable a simple way to customize settings for high or low occupancy applications.

The IG Series is backed by Cree’s 10-year warranty and available through Cree lighting sales channels throughout Canada and the U.S.

Find out more: http://creecanada.com/products/exterior/parking-structure/ig-series-parking-structure/.

 

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…