Underhill ICC2 2Wire Decoder Module

2 wire decoder

June 27, 2017

The ICC2 2Wire Decoder Module is a new and easy to use. Installs in minutes providing additional stations above 38 for the wall and metal wall mount models.

For existing ICC controllers that are upgraded to ICC2, there is no need to reprogram existing decoders in the field.

For new or retrofit applications. Solely as 2Wire or as a “hybrid” (multi-wire and 2Wire) at the same time. 48 stations – for plastic / metal wall mount enclosures and metal pedestal enclosures. 2 (includes master valve if connected to a decoder) 3-15/16” long x 2-1/2” wide x 1-9/16” deep .25 lbs. (0.11kg)

  • Fully compatible with Hunter’s re-introduced ICC2 controller
  • Manage up to 48 stations in either a wall mount plastic/metal enclosure or metal pedestal models
  • Operate up to 2 Decoders at the same time
  • Utilize in a new or retrofit application using existing field wire
  • Installs in minutes with all of the advantages of 2Wire technology
  • Uses a single ground rod for the 2Wire Decoder Module and no where else along the 2Wire path

For mroe information:

http://www.underhill.us/products/2wire-products/296-icc2#overview

Related Articles


Latest Articles

  • Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    By Luc Rodier, Chair of the Board of Electro-Federation Canada (EFC) The 2025 EFC Conference in Niagara was a landmark occasion—marking 30 years of innovation, collaboration, and collective progress in the Canadian electrical industry. Set against the symbolic backdrop of the Canadian-U.S. border, this year’s theme, Electrifying Connections, couldn’t have been more fitting. As President and… Read More…

  • Industrial Wiring Devices: A Brief Intro and How to Choose Them

    Industrial Wiring Devices: A Brief Intro and How to Choose Them

    June 9, 2025 Introduction: With the multitude of options on the market, it can be difficult to decide whether you need a pin and sleeve wiring device or a plug and connector in your industrial plant or facility. You might find your head swirling with thoughts about which option is best. Or you may not… Read More…

  • Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    June 9, 2025 By Electro-Federation Canada On June 3 and 4, a high-level delegation from Canada’s electrical and automation sector travelled to Montreal and Quebec City for a series of strategic meetings with Quebec government officials and key stakeholders. Organized by Electro-Federation Canada (EFC), this mission underscores the critical role the industry plays in advancing… Read More…

  • Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    June 9, 2025 By Electro-Federation Canada This year’s Annual Industry Conference, held against the breathtaking backdrop of Niagara Falls, Ontario, was a landmark event with more than 710 Electro-Federation Canada community members. More than just a celebration of our shared history, it was a launchpad for new ideas, future-based dialogue, and deeper connections.   The energy and… Read More…


Changing Scene