Rittal Blue e+ Cooling Units

Rittal

As well as providing far higher energy efficiency than existing cooling solutions, the units also offer a range of powerful new features that provide longer component life, flexibility and ease of use.

The Blue e+ uses an innovative hybrid process that relies upon two parallel cooling circuits working together, depending on temperature difference. The integral heat pipe dissipates heat from the enclosure as soon as the ambient temperature falls below the setpoint, providing passive climatization. Active climatization is achieved via the compressor’s cooling circuit with speed-controlled components for demand-based cooling. This unique inverter technology provides cooling output that is always exactly the amount needed at the time. Not only is energy consumption far less than with conventional technology, but the improved cooling leads to longer service life of the components inside the enclosure and the cooling unit itself.

For customers seeking to deploy the new technology to facilities around the world, all Blue e+ units provide multi-voltage capability to connect to all standard power grids worldwide. Possible input voltages range from 110 V (single phase) to 480 V (three-phase) at grid frequencies of 50 or 60 Hz. The cooling unit is always the same, no matter whether the machine is being connected to power in North America, Europe or Asia. This not only means a considerable reduction in the number of device variants, but also to a greater simplification of spare parts logistics for single-part number ordering as well as much easier supply chain logistics for Rittal customers.

Other innovations within the Blue e+ series include a touch-screen display on the front of all units which provides all relevant information at a glance. System messages appear as plain text and are multi-lingual. Standardized communication interfaces also ensure easy integration in a production plant’s control systems.

Blue e+ units offer password-protected Near-Field Communications (NFC) which allows operations personnel to communicate with the cooling unit via mobile devices such as a smartphone. The NFC interface provides real-time performance data and, if needed, permits quick modification of the unit’s settings. The Blue e+ cooling units offer cooling capacities up to 6,000 watts (previously up to 4,000 watts) and can be used in environments ranging from -30°C to +60°C.

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…