Guide to the Canadian Electrical Code, Part I — Instalment 40

Bill Burr

 

Aug 13, 2018

By William (Bill) Burr

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook** but will hopefully provide some help in navigating, while reading the code.

The 24th Edition of the CE-C, Part I, (C22.1-18)* is now available from CSA Group. This discussion of Section 78 — Marine Wharves, Docking Facilities, Fixed and Floating Piers, and Boathouses is based on the new edition.

Rule 80-000 notes that this is a supplementary or amendatory section of the code and applies only to the installation of impressed current cathodic protection systems. Appendix B and the CEC Handbook have additional information and descriptions of cathodic protection.

Rule 80-002 provides wiring methods for DC wiring and includes:

  • conformance to Section 12, except for below ground burial of not less than 450mm or 200mm in raceway or with mechanical protection
  • conformance to Section 18 and Section 20 in hazardous areas

Where DC wiring is installed underground below a Section 20 (Annex J20) Class I hazardous area, it may be buried to a depth not less than 450 mm or 200mm in raceway, providing the wiring is in threaded rigid conduit and sealed in accordance with rules 18-104 or 18-154, where it emerges from the ground.

Rule 80-004 requires that DC cathodic protection wiring be a minimum No. 12 AWG, except for instrumentation and reference electrode leads, and be selected in accordance with rule 12-102 (3) with regard to location and conditions of use.

Rule 80-006 specifies that splices, taps and connections made in conductors underground or exposed to the weather must be

  • made by welding, by a positive compression tool, by crimping and soldering, or by means of a copper, bronze, or brass cable connector
  • sealed against moisture by taping or other method as effective as the original insulation
  • connected to piping by thermit welding, or by a clamp of the same material as the piping or anodic to it
  • connected to a tank or other structure with a welded stud, thermit welding or other permanent means
  • sealed against moisture by the application of a material resistant to any corrosive environment

Rule 80-008 requires that the cathodic protection system rectifier be provided with a dedicated circuit in accordance with the requirements of Section 12.

Rule 80-010 outlines that each rectifier unit of a cathodic protection system have a separate disconnecting means installed

  • readily accessible
  • within sight of, and
  • within 15 m of the unit, or
  • integral to the rectifier and equipped with barriers or other suitable means to protect service personnel from live parts on the line side
  • rendered inaccessible to unauthorized persons by a lockable cover
  • labelled in a conspicuous, legible, and permanent manner identifying it as the disconnecting means for a cathodic protection system

Rule 80-012 requires that where the available operating voltage is more than 50V

  • the voltage difference between exposed points of the protected system, or
  • any point in the vicinity of the anodes, and any point 1m away on the earth’s surface, not exceed 10V.

Rule 80-014 requires that the following warning signs and drawings be provided:

  • a marking warning on tanks, pipes and structures that the cathodic protection system not be disconnected unless the power source is turned off
  • a sign, in a conspicuous location adjacent to the disconnecting means of electrical apparatus connected to the cathodically protected structures, advising that the cathodic protection be turned off and a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, be installed before equipment or piping is replaced or modified
  • in a non-hazardous location, a sign advising that the use of a temporary cathodic protection bypass conductor, appropriately sized for maximum available current, may be used as an alternative to turning off the cathodic protection when replacing or modifying the protected equipment
  • a drawing, placed inside or near the rectifier cabinet, showing the location, polarity and anodes of underground cathodic protection wiring
  • a notice, placed in a conspicuous location adjacent to the entranceway of a storage or process container, advising that the cathodic protection system must be turned off before entering the container

In the next instalment, we will be discussing Section 84 – Interconnection of Electric Power Production Sources.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting; billburr@gmail.com

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA.

**Note the CEC Handbook is also published by CSA.

 

Related Articles


Latest Articles

  • ABB Wins New Product Award at MCEE Show

    ABB Wins New Product Award at MCEE Show

    April 28, 2025 ReliaHome™ Smart Panel won Best New Product Award in the Software, Controls and Related Components category. Iberville® Gangable boxes with low-voltage cables support bracket was recognized as a finalist in the Commercial, Institutional and Industrial Electrical Products category. ABB was honored with a Best New Product Award in the Software, Controls and… Read More…

  • Weidmuller Celebrating a Legacy: 175 Years Globally, 50 Years in Canada

    Weidmuller Celebrating a Legacy: 175 Years Globally, 50 Years in Canada

    April 28, 2025 The year 2025 is truly special for Weidmüller. The company proudly celebrates not just 50 remarkable years in Canada but also its 175th anniversary globally—an extraordinary achievement few companies can claim. This legacy is a testament to the company’s relentless pursuit of innovation and commitment to refining its offerings. But the journey… Read More…

  • Canada Stands Tall at Hannover Messe 2025

    Canada Stands Tall at Hannover Messe 2025

    April 28, 2025 By Owen Hurst At Hannover Messe earlier this month Canada had a strong presence as the host country with a wide variety of companies and programs focusing on the development of advance technology. The presence was accentuated by numerous halls hosting Canada pavilions. Partner Country Canada presented itself impressively at HANNOVER MESSE…. Read More…

  • BC Prompt Payment Legislation Progressing

    BC Prompt Payment Legislation Progressing

    April 28, 2025 Consistent with its mandate of growing the economy, the government wants to ensure that businesses are paid promptly for work performed on (or material provided to) construction projects. British Columbia’s Ministry of Attorney General staff have been tracking the issue of payment delay in the construction industry, including legislative responses in other… Read More…


Changing Scene

  • Schneider Electric Advances in Product Environmental Data Transparency

    Schneider Electric Advances in Product Environmental Data Transparency

    April 28, 2025 Schneider Electric has launched its Environmental Data Program. This initiative, which builds on the legacy Green Premium label, provides customers with unique access to information on the environmental impact of its products, enabling them to make better informed, data-based decisions and meet evolving regulatory requirements with confidence. Schneider Electric has frequently been recognized… Read More…

  • nVent Sustainability Report Highlights Progress and Focus on Electrification

    nVent Sustainability Report Highlights Progress and Focus on Electrification

    April 15, 2025 nVent Electric plc announced the release of its 2024 Sustainability Report. The new report highlights nVent’s achievements in each of its sustainability focus areas: People, Products, Planet and Governance. The report also highlights how nVent solutions support electrification, digitalization and sustainability efforts around the world. “nVent is becoming a more focused electrical… Read More…

  • Ontario Introduces Legistlation to Unlock Trade and Labour Mobility Within Canada

    Ontario Introduces Legistlation to Unlock Trade and Labour Mobility Within Canada

    April 18, 2025 As a next step in its plan to protect Ontario by unleashing the province’s economy, the Ontario government is introducing the Protect Ontario through Free Trade within Canada Act to unlock free trade and labour mobility within Canada. This legislation will, if passed, create new opportunities for job creation and investment attraction, supporting economic… Read More…

  • Ontario, P.E.I. Join Nova Scotia With Legislation to Remove Internal Trade Barriers

    Ontario, P.E.I. Join Nova Scotia With Legislation to Remove Internal Trade Barriers

    April 18, 2025 Prince Edward Island and Ontario have joined the Nova Scotia by introducing reciprocal legislation that will help foster an environment of mutual recognition of goods, services and labour mobility between these provinces. “Leaders across the country are expressing interest in removing trade barriers, and I’m very pleased that P.E.I. and Ontario have… Read More…