What Contractors Don’t Know About Lighting

Amerlux

Feb 3, 2020

Electrical contracting, like the rest of the construction industry, is in a state of rapid change. Electrical contractors must deal with a variety of forces that are impacting installers.

For instance, contractors are dealing with 1) an increased demand for skilled labour, 2) the evolution of building delivery systems, 3) more complex building controls, 4) the proliferation of preconstruction and prefabrication, new technology entering the jobsite, and 5) increasingly stringent codes and standards.

Phew!

But that isn’t everything.

Electrical contractors are currently managing a skilled labour shortage, which is the biggest issue. Skilled baby boomers are hanging up their hard hats for retirement and contractors are left scrambling to find replacements. They are also struggling to bring younger, up-and-coming contractors up to speed on the jobsite, while trying to keep projects on time and on budget.

Contractors must confront all of these challenges while continuing to meet deadlines for clients, working with subcontractors and providing safe work environments.

So, when it comes to procuring lighting products amid all the stress, it’s no surprise that there may be a few misconceptions.

High-quality, low cost products exist

Since they rarely want or have the time to sort through all of the lighting product options for their specific job, electrical contractors may not know about recently launched LED products. Today, there are more effective and less expensive lighting products in the marketplace that can help improve efficiency, reduce downtime and heighten safety to get jobs done faster and more profitably. Most of the time, the media portrays lighting companies in a fierce price competition, implying product quality is suffering, which could result in a more difficult, costly and time-consuming installation process.

Easy-to-install solutions are available

As contractors focus on the shifting demographics in the construction business, which is resulting in a great loss of electrical industry know-how, they may have missed new lighting choices in the marketplace. Don’t think your only choices are low-quality, high-cost lighting products that fail to arrive on site when needed — because there are products that balance time, speed and quality. These products can shorten the time spent on a job and can be procured at a cost within the project budget.

Lighting solutions are also available that are easy for younger, inexperienced contractors to install right out of the box. These products come pre-wired and can be installed with less tools.

Not all supply chain partners are equal

Behind every successful contractor is a smart distributor who understands durable, high-quality products that don’t cost extra on the back end with late shipping problems. The lack of good lighting supply chain partners can lead to wasted money and lower quality work.

Electrical contractors need quality, trustworthy partners who can provide them with the ability to connect and access information at any time. Supply chain partners should be educated about the contemporary lighting options in today’s marketplace so they can suggest the best product selections for projects.

This article was first published online by Amerlux: https://blog.amerlux.com/what-contractors-dont-know-about-lighting/

Related Articles


Latest Articles

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…

  • BCCA Official Statement on Construction Projects Procurement Act

    BCCA Official Statement on Construction Projects Procurement Act

    March 13, 2026 On March 5, 2026, Kiel Giddens, MLA for Prince George – Mackenzie and Critic for Labour, introduced the Construction Projects Procurement Act, a Private Member’s Bill aimed at restoring fair and open procurement on public construction projects in British Columbia. BCCA has a long history of advocating for fair and open public procurement. Read More…


Changing Scene

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • Sonepar Company Opens a New Automated Distribution Center in Las Vegas

    Sonepar Company Opens a New Automated Distribution Center in Las Vegas

    March 13, 2026 Codale Electric Supply, a Sonepar company, is transforming electrical distribution with the launch of its central distribution center located just off the Las Vegas Strip, in October 2025. The site features a highly automated setup designed to improve speed, accuracy, and customer convenience. At the heart of the facility is an advanced Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…

  • KPMG Establishes Major Products Delivery Office

    KPMG Establishes Major Products Delivery Office

    March 13, 2026 KMPG: Complex projects require well-structured teams, appropriate delivery models tailored to the project’s needs, robust governance frameworks, and stable execution environments: KPMG Canada Canada is entering a defining era of major project development that has significant implications for the nation’s economic future, as the country works to establish new trade partnerships, develop its resources, reinforce Read More…