Eaton Launches First-of-Its-Kind Capacitor Recycling Program as Part of Effort to Drive a More Circular Economy

Eaton logo2 400

Sept 25, 2020

Power management company Eaton recently announced it has launched a new recycling program based out of its Emerald Road facility in Greenwood, South Carolina, that allows customers to responsibly dispose of aged, obsolete or damaged power capacitor units. The program includes onsite material pickup and supports any unit, regardless of age, original manufacturer or condition.

“At our site, we concentrate our efforts on several environmental variables within our direct control such as the materials we use, the efficiency of our equipment and the water and energy consumption at our plants,” said Gordon Pettersen, product manager, capacitors, Eaton. “Now we’re expanding our focus to include end-of-life management of equipment.”

The program was initiated after the team received customer interest in a recycling program, which aligns with Eaton’s broader effort to help its customers reach their sustainability goals. “It became very clear that this was something our customers were hungry for,” said Pettersen. “We started drilling down into what exactly customers wanted in a recycling service and received plenty of feedback around site pickup and the ability to recycle any unit. That’s how we designed our program.”

The capacitor unit recycling process will vary depending on the material, construction and age of the unit. Where applicable, recovery of capacitor dielectric fluid will be collected and introduced into re-refining operations to become an ingredient in oil-based products. Metals such as steel, stainless-steel, aluminum and internal wires will be sorted, shredded and melted and will undergo purification processes for future use in steel and non-ferrous goods manufacturing. And although some materials will be incinerated, this will only be used if the heat generated by incineration is collected and used to create more energy than was required for the incineration process.

This program is an example of how Eaton is driving the movement to a circular economy— one that is aimed at eliminating waste and making the best use of natural resources. It is also in alignment with Eaton’s recently announced sustainability goals, which include the company’s commitment to science-based targets and its intention to become carbon neutral in its operations by 2030. Over the same time period, Eaton also aims to certify 100 percent of its manufacturing facilities as zero waste-to-landfill—a designation Eaton sites earn when they achieve a landfill waste diversion rate of 98 percent or more through reuse, composting, recycling or other means. The Emerald Road facility in Greenwood reached zero waste-to-landfill status in 2018.

“We are excited to provide this recycling program as it truly fills a critical need within the industry,” said Randy Gazdecki, product line manager, capacitors, Eaton. “By leveraging our facility’s successes, we are able to offer a comprehensive program that completes the life cycle of our product.”

The Emerald Road facility in Greenwood produces capacitor units, switches, assembled equipment and network protector products for utilities and other industrial companies. It has 215 employees.

Source

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…