CoRe+ Max Charging Station for Commercial and Industrial

EIN CoRe Charging Station

November 15, 2021

The CoRe+ Max charging station is specifically designed for light and medium-duty EV fleets with the complementary capability of serving as a public charger.

Powerful and flexible, the CoRE+ Max charger offers 77% of the speed of a 25kW DC fast charger at 30% of the cost. Meaning for the same cost as installing one 25kW DC fast charger, you can install four or more CoRe+ Max’s.

The CoRe+ Max is 100% compatible with current and next-generation BEV or PHEVs in North America and has flexible charge settings, ranging from 24 to 80 amps.

Features

  • Universally compatible, high-quality J1772 connector designed for 10,000+ charging cycles
  • NEMA 4X aluminum casing for maximum climate resistance and long-term durability
  • Flexible 25’ cable to reach charging port on any vehicle, no matter how it’s parked
  • Certified to operate at temperatures ranging from -40 °C to 50 °C (-40° F to 122° F)
  • Can be set-up in multiple configurations to suit any parking layout
  • Convenient charging session authentication through RFID card or FLO mobile app
  • Built-in energy management features including Power Sharing and Power Limiting
  • Optional cascading kit
  • Remote control of station access and rates for customized user experience
  • CSA certified

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…