New Electrical STANDATA Variances Released

EIN Alberta standata 400

February 15, 2022

The following Electrical STANDATA Variances are now available on the Alberta.ca website. Follow the links below to view or print copies.

21-ECV-002-2-024 MMTE  

Rule 2-024 – Use of approved equipment – Meter mounted transfer equipment

21-ECV-006-112

Rule 6-112 –  Support for the attachment of overhead supply or consumer’s service conductors or cables

21-ECV-018-150

Rules 18-150 and J18-150 – Equipment in classified areas

21-ECV-064-216

Rule 64-216 – Arc-fault protection requirements for ground-mounted solar

21-ECV-064-218

Rule 64-218 – Photovoltaic rapid shutdown

 

The following Electrical STANDATA Interpretations are now available on the Alberta.ca website. Follow the links below to view or print copies.

21-ECI-046

Section 46 – Emergency power supply, unit equipment, exit signs, and life safety systems

21-ECI-064

Section 64 – Renewable energy systems

21-ECI-084

Section 84 – Interconnection of electric power production sources

21-ECI-086

Section 86 – Electric vehicle charging systems

 

The following Electrical STANDATA Bulletins are now available on the Alberta.ca website. Follow the links below to view or print copies.

   

21-ECB-000

Section 0 – Objects scope and definitions

21-ECB-002

Section 2 – General rules

21-ECB-004

Section 4 – Conductors

21-ECB-006

Section 6 – Services and service equipment              

21-ECB-008

Section 8 – Circuit loading and demand factors

21-ECB-010

Section 10 – Grounding and bonding

21-ECB-012

Section 12 – Wiring methods

21-ECB-016

Section 16 – Class 1 and  Class 2 circuits

21-ECB-018

Section 18 – hazardous locations

21-ECB-020

Section 20 – Flammable liquid and gasoline dispensing, service stations, garages, bulk         storage plants, finishing processes, and aircraft hangars

21-ECB-024

Section 24 – Patient care areas

21-ECB-026

Section 26 – Installation of electrical equipment

21-ECB-028

Section 28 – Motors and generators

21-ECB-030

Section 30 – Installation of lighting equipment

21-ECB-032

Section 32 – Fire alarm systems, smoke alarms, carbon monoxide alarms, and fire pumps

21-ECB-036

Section 36 – High voltage installations

21-ECB-060

Section 60 – Electrical communications systems

21-ECB-062

Section 62 – Fixed electric heating  systems

21-ECB-068

Section 68 – Pools, tubs, and spas

21-ECB-076

Section 76 – temporary wiring

 

Go HERE for all Electrical STANDATA

Related Articles


Latest Articles


Changing Scene

  • SurgePure Corporation Expands into the Mid-West with New Representation Partner, Advance Electrical Agency

    SurgePure Corporation Expands into the Mid-West with New Representation Partner, Advance Electrical Agency

    August 1, 2025 SurgePure Corporation is proud to announce its new partnership with Advance Electrical Agency, who will represent the company across Saskatchewan, Manitoba, and Western Ontario. Led by principals Darren Churchwell and Bob Fiesel , the Advance team is part of a well-established agency known for representing some of the most respected manufacturers in… Read More…

  • Munden Partners with Valid Manufacturing in Atlantic Canada

    Munden Partners with Valid Manufacturing in Atlantic Canada

    August 1, 2025 Munden Enterprises has announced that they are back in the custom enclosure business through a new partnership with Valid Manufacturing Ltd. Expect Canadian-made, engineered solutions for industrial, utility, transportation, wastewater, renewables, and beyond. Whether you need a bare enclosure or a fully assembled panel, Munden is here to help. Reach out to… Read More…

  • JEHS Joins Forces with NOARK to Deliver Smarter Electrical Solutions in Ontario

    JEHS Joins Forces with NOARK to Deliver Smarter Electrical Solutions in Ontario

    August 1, 2025 NOARK Electric is pleased to announce a new partnership with Cambridge, Ontario based manufacturing representitive, JEHS. This strategic collaboration will expand NOARK’s reach and customer support across Ontario and beyond, bringing reliable and innovative electrical solutions to a wider audience. With over 50 years of combined sales experience, JEHS brings a strong… Read More…

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…