Powerguard® Conduit by Dura-Line

EIN Duraline Conduit

February 18, 2022

PowerGuard® is Dura-Line’s newest line of conduit products complete with a smooth outer wall, longitudinal inner ribs, and SILICORE® ULF inner lining for reduced coefficient of friction. Listed to the CSA C22.2 #327-18 electrical standard as well as the Canadian Electrical Code this product is ideal for all buried cables up to and including 69kv.

FEATURES

  • Available in 16mm (1⁄2″) to 129mm (5″). Comes standard in long continuous lengths on reels or coils, 155mm (6″) is available in trade lengths 3.048m (10’), 6.096m (20’), 12.192m (40’), & 15.24m (50’)
  • Manufactured from flexible CSA listed HDPE resin, makes gradual bends without special equipment or added accessories
  • Internal longitudinal ribbing reduces friction during cable placement
  • SILICORE® ULF inner wall eliminates the need for wet lubricants during cable pulling
  • Excellent low temperature properties allow installation in cold climates
  • Outstanding long term power cable protection from shifting ground, rock, and root impingement
  • Provides a permanent pathway, simplifies future cable repairs or replacement
  • Greatly reduces the number of coupled joints in a continuous installation, reducing the possibility of infiltration of native soil, backfill and water
  • Available with pre-installed pull tape from 500# to 6000# strength
  • Standard configuration – Red, 4 black stripes, longitudinal ribbing and SILICORE® ULF

DETAILS

  • Footage/Meter Markings
  • Internal Ribs
  • Silicore® ULF

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…