Ontario Electrical Code Training in April from OEL

EIN OEL 400

April 1, 2022

This training program will be hosted by OEL member Donald R. McNichol Consulting Inc.

The estimated duration of the course is 3 to 3.5 hours.

The course covers all the significant changes in the 2021 Ontario Electrical Safety Code. Editorial and minor changes are not discussed.

Donald R. McNichol Consulting Inc. is willing to accommodate the needs of participants who require learning accommodations. Should you require any accommodations, please email Bao at least one week in advance of the course start date.

The maximum amount of registrations for each course date is 30. Register early to avoid being held on the waiting list.

Materials

  • *A hardcopy of the course participant handout will provided to you at the training course. You will no longer need to print this material yourself*
  • Participants may bring their own copy of the 2021 Canadian Electrical Code or the 2021 Ontario Electrical Safety Code

About Donald R. McNichol Consulting Inc.

Based in Waterloo, Donald R. McNichol Consulting Inc. provides expert electrical training and consulting services based on electrical installation requirements in Canada. Our team is made up of highly skilled electrical professionals. Each of our trainers and consultants is a Red Seal certified electrician and former electrical inspector in Ontario.

Go HERE for more information

Related Articles


Latest Articles

  • Intermatic Acquired by MPE Partners

    Intermatic Acquired by MPE Partners

    May 19, 2025 By David Gordon, Channel Marketing Group, President The Intermatic deal is done. It has been rumored for months that Intermatic was being sold. Strategic buyers and private equity firms were mentioned as expressing interest and reviewing “the book” throughout the fall (and some mentioned even last summer.) According to sources, it was a “challenge” for… Read More…

  • 6 Things Contractors Need To Know About the Security Kit for Wire Mesh Tray

    6 Things Contractors Need To Know About the Security Kit for Wire Mesh Tray

    May 19, 2025 The rapid expansion of data centers has brought about significant challenges in maintaining data security standards. According to Statistics Canada, recovery costs from cyber security incidents in 2023 were $2.1 billion, up from $600 million in 2021. This critical situation requires a more robust cable management design to protect data from being… Read More…

  • NSAA Information on Potential Canada Post Strike

    NSAA Information on Potential Canada Post Strike

    May 19, 2025 In case of a possible Canada Post mail disruption: Source Read More…

  • How to do Business with ESA During a Canada Post Disruption

    How to do Business with ESA During a Canada Post Disruption

    May 19, 2025 The Electrical Safety Authority (ESA) is reminding stakeholders that they can continue to do business during a postal strike and ensure they meet their compliance obligations. This includes applications for inspection, LEC and ME licence renewals and payments.  Online Is Your Best Option  ESA has several options for LECs and MEs to… Read More…


Changing Scene

  • Catalyst Sales and Marketing Announces New Partnership with MGM Transformers

    Catalyst Sales and Marketing Announces New Partnership with MGM Transformers

    May 19, 2025 Catalyst Sales and Marketing is proud to announce a new line partnership with MGM Transformer Company, a recognized provider of dry-type and liquid-filled transformers for commercial, industrial, and infrastructure applications. With over 50 years of expertise, MGM delivers custom-engineered, reliable, and energy-efficient solutions designed to meet the demands of data centers, renewable… Read More…

  • Intermatic Acquired by MPE Partners

    Intermatic Acquired by MPE Partners

    May 19, 2025 By David Gordon, Channel Marketing Group, President The Intermatic deal is done. It has been rumored for months that Intermatic was being sold. Strategic buyers and private equity firms were mentioned as expressing interest and reviewing “the book” throughout the fall (and some mentioned even last summer.) According to sources, it was a “challenge” for… Read More…

  • Production Underway at Shawflex’s New Vaughan Manufacturing Facility

    Production Underway at Shawflex’s New Vaughan Manufacturing Facility

    May 19, 2025 Shawflex Facility Update! Shawflex announced via LinkedIn that production is officially underway at their new manufacturing facility in Vaughan. “While final steps are in progress and on track, our start to production is a testament to the seamless planning, coordination, and dedication of our incredible team. This milestone marks a major step forward… Read More…

  • EFC Welcomes New Manufacturer Member: Valid Manufacturing Ltd.

    EFC Welcomes New Manufacturer Member: Valid Manufacturing Ltd.

    May 19, 2025 Since 1992, Valid Manufacturing Ltd. has built their reputation as a world class innovator. By focusing on exceptional quality and service, they have developed strong relationships with renowned industry leaders. With four modern production facilities spanning over 100,000 sq. feet, Valid has the capacity and proven track record to tackle any project… Read More…