Public Comment Period Open on Massey Tunnel Replacement

EIN British Columbia Logo

May 4, 2022

The early engagement phase of the environmental assessment process is underway for the proposed toll-free eight-lane tunnel to replace the aging George Massey Tunnel.

The proposed project, called the Fraser River Tunnel Project, would also include a multi-use pathway, providing an active transportation connection for the first time at this location. The existing tunnel would be removed once the new immersed tube tunnel is complete.

This first public comment period held by the Environmental Assessment Office runs from April 25 until June 9, 2022. People are invited to provide feedback about how they want to be engaged throughout the environmental assessment process and to identify key interests and issues with project design or location.

Feedback provided during this early engagement will be used to inform the planning and development of the project throughout all stages of the environmental assessment.

The Environmental Assessment Office will hold additional public consultation periods in future phases of the environmental assessment to seek input on more detailed information about the proposed project as it is developed.

The Fraser River Tunnel Project is subject to review under B.C.’s Environmental Assessment Act, and an environmental assessment certificate is required for the project to move forward.

People can learn more about the project and the environmental assessment process by attending a public open house or virtual information session:

In-person public open houses:

Tuesday, May 10, 2022
Coast Tsawwassen Inn
1665 56 St.
Delta
5-8 p.m.

Wednesday, May 11, 2022
Hilton Vancouver Airport Hotel
5911 Minoru Blvd.
Richmond
5-8 p.m.

Virtual information sessions:

Tuesday, May 17, 2022, 12-1:30 p.m.
Thursday, May 19, 2022, 5:30-7 p.m.

Information on how to join the virtual information sessions is available at: www.gov.bc.ca/EAOPublicComments

Project team members and Environmental Assessment Office staff will be available at the sessions to provide information and answer questions about the project and the environmental assessment process. Feedback can also be provided online. The deadline to submit comments during this first public comment period is June 9, 2022. To access the project page, visit: www.gov.bc.ca/EAOPublicComments

The Environmental Assessment Office evaluates major projects in B.C. for potential environmental, economic, health and cultural impacts. An important part of the environmental assessment process is public feedback, and this early engagement is the first of four opportunities when people will be able to provide input.

Source

Related Articles


Latest Articles

  • Virtual Training for Electricians Available at Many IBEW Canada Training Centres Across the Country

    Virtual Training for Electricians Available at Many IBEW Canada Training Centres Across the Country

    June 23, 2025 Virtual Training for Electricians (VET) is now available at many IBEW Canada Training Centres nationwide — and more are coming online soon! Whether your centre is already equipped or in the process of setting up, this is a game-changing opportunity you won’t want to miss. Need assistance? Contact the NETCO team. What… Read More…

  • Designing for Demand: The Role of Transformers in a Resilient EV Future

    Designing for Demand: The Role of Transformers in a Resilient EV Future

    June 23, 2025 Transformers in the EV Charging Boom: Are We Ready for the Load? As electric vehicles (EVs) continue their rapid rise, one question looms over the energy sector, municipalities, and developers alike: Is our infrastructure truly ready for the surge in demand? From city streets to highway rest stops, new EV chargers are… Read More…

  • The Time is Now: An Industrial Energy Efficiency Action Plan

    The Time is Now: An Industrial Energy Efficiency Action Plan

    June 23, 2025 In a whitepaper released on June third, ABB has set out the scale of the challenge facing the global industrial sector and emphasizes the critical role of industrial energy efficiency in meeting rising energy demand while strengthening energy security & affordability and driving industrial competitiveness. With 45% of the world’s electricity converted… Read More…

  • Multi-Family Construction Intentions Weigh Down Residential Sector

    Multi-Family Construction Intentions Weigh Down Residential Sector

    June 23, 2025 In April, the total value of building permits issued in Canada decreased by $829.6 million (-6.6%) to $11.7 billion. British Columbia (-$1.2 billion) led this decrease in construction intentions, which was mitigated by Ontario (+$299.3 million). On a constant dollar basis (2023=100), the total value of building permits issued in April fell by 6.6% from the previous… Read More…


Changing Scene

  • Stanpro Makes Significant Donation to Help Haven on the Queensway Move to a Larger Facility

    Stanpro Makes Significant Donation to Help Haven on the Queensway Move to a Larger Facility

    June 23, 2025 In an effort to provide essential resources to individuals and families in need in the GTA, EFC members once again stepped up to support Haven on the Queensway, a community resource centre in Etobicoke, ON. Earlier this year, Haven secured a new, larger location nearby its existing facility to meet growing demand… Read More…

  • Metalumen Manufacturing, Inc. Announces NRG INTENSI-T as New Sales Agency in Quebec

    Metalumen Manufacturing, Inc. Announces NRG INTENSI-T as New Sales Agency in Quebec

    June 23, 2025 Metalumen Manufacturing, Inc. is pleased to welcome NRG INTENSI-T as its new sales agency for the Quebec region. This partnership strengthens regional support and reflects a shared commitment to innovation and excellence. Since 1977, Metalumen has been designing, engineering, and manufacturing lighting products that blend functionality with design, offering luminaires tailored to… Read More…

  • IDEAL Electrical™ and BILT® Make it Easier to Learn Conduit Bending

    IDEAL Electrical™ and BILT® Make it Easier to Learn Conduit Bending

    June 23, 2025 Conduit bending – one of the hardest skills for professional electricians to master – is now easier than ever to learn, thanks to a first-of-its kind partnership between BILT, an app that has revolutionized step-by-step interactive instructions for DIYers and IDEAL Electrical, a 108-year old manufacturer of electrical tools and supplies for professional electricians…. Read More…

  • Introducing the New WAGO App: Your Jobsite Sidekick

    Introducing the New WAGO App: Your Jobsite Sidekick

    WAGO at your fingertips — scan the QR to get the app now. Stay connected with WAGO wherever you go. Download the WAGO App to access product details, documentation, configuration tools, as well as local distributors — all from your mobile device. Scan the QR code to get started on the App Store or Google… Read More…