First Nations Community Building Retrofit Program

FNCBRP

September 27, 2022

The Save on Energy First Nations Community Building Retrofit Program (FNCBRP) provides funding and technical support to on-reserve First Nation communities to undertake energy-efficiency projects. These projects are intended to help communities improve the energy efficiency of their band-owned commercial and institutional facilities, manage their electricity use more effectively, and save on energy costs.

What does the program offer?

The FNCBRP offers, at no cost to eligible participating communities:

Up to $100,000 in funding for the installation of energy-efficiency upgrades in on-reserve band-owned and operated commercial and institutional buildings.

On-site energy assessments and an audit report identifying energy-efficiency projects in up to four facilities chosen by the participant.

A community benchmark report to compare the energy use of these buildings with other similar buildings with the goal of prioritizing buildings for further assessment.

Project support from Save on Energy’s program delivery partner with identifying, engaging and coordinating installation contractors.

This program is delivered through either a direct install or a community install approach to best suit community needs and preferences. More details on each approach is available through the link below.

Eligibility

All on-reserve First Nations communities in Ontario connected to the provincial electricity grid are eligible to participate.

Commercial and institutional facilities must be located on band-owned land and operated for the use and benefit of the community.

An executed Band Council Resolution is required.

The full list of eligibility criteria can be found in the program requirements.

Go HERE for more information

Related Articles


Latest Articles

  • EFC: The Voice of Standards and Code Development

    EFC: The Voice of Standards and Code Development

    July 30, 2025 By Electro-Federation Canada Electro-Federation Canada (EFC) plays a vital role in shaping the regulatory and technical landscape of Canada’s electrical and automation sectors. Through active participation on key strategic and technical committees, EFC represents the collective interests of its members and ensures that the development of standards and codes is informed by… Read More…

  • Bold, Programmable Lighting Upgrade Helps Draw Visitors to Chinook Centre in Calgary

    Bold, Programmable Lighting Upgrade Helps Draw Visitors to Chinook Centre in Calgary

    July 30, 2025 Chinook Centre Can Now Brightly Celebrate Local Events, Holidays & Causes with New Thematic Exterior LED Lighting  The CF Chinook Centre (more commonly known as Chinook Centre) was always destined to be a major destination point for Calgary. Opened in 1965, it is conveniently located near the city center and is only 20 minutes from… Read More…

  • Electrical Devices GFCI Safety Outlet Sold at Home Hardware Recalled due to Fire Hazard

    Electrical Devices GFCI Safety Outlet Sold at Home Hardware Recalled due to Fire Hazard

    July 25, 2025 Product: Electrical Devices GFCI Safety Outlet sold at Home Hardware Issue: Consumer products – Fire hazard What to do: Immediately stop using the recalled products, contact Unison Ridge for instructions on how to uninstall and return them to any Home Hardware store for a refund. This recall involves three white coloured models… Read More…

  • Grounded in Ontario: Episode 18 – Meter Bases – Bonding, Safety, and Section 10 Changes

    Grounded in Ontario: Episode 18 – Meter Bases – Bonding, Safety, and Section 10 Changes

    July 24, 2025 ESA Technical Advisor, Trevor Tremblay, reveals how meter bases can go from  simple to seriously risky if installed incorrectly. As code enforcement around meter bases ramps up, contractors must stay sharp, read all rules carefully (especially those “notwithstanding” clauses), and double-check labeling. With the right education and planning, the transition can be… Read More…


Changing Scene

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…

  • Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    July 22, 2025 Building-Integrated Photovoltaics (BIPV) manufacturer, Mitrex proudly announces that its transformative SunRise Residential project in Edmonton, Alberta, has earned the Guinness World Record for the largest solar panel mural globally. This landmark project showcases Mitrex’s innovative BIPV solar panels, blending cutting-edge solar technology with vibrant cultural artistry to redefine sustainable architecture. Sustainable Architecture with BIPV Spanning over 30,000 square feet, the Mitrex eFacade PRO plus… Read More…

  • Nexans Unveils a Cable Made with 100% Recycled Materials

    Nexans Unveils a Cable Made with 100% Recycled Materials

    July 24, 2025 Nexans has reached a major milestone in its sustainability journey by developing a prototype cable made entirely from recycled materials — a first in the company’s history. This innovation combines technical performance, industrial feasibility, and a drastically reduced environmental footprint, marking a decisive step forward in circular economy. A cross-continental success story… Read More…

  • EFC Welcomes New Manufacturer Member: MGM Transformers

    EFC Welcomes New Manufacturer Member: MGM Transformers

    July 24, 2025 Since 1974, MGM Transformers has produced tough and trusted transformers designed to get the job done right. As a leading manufacturer, the company employs a highly experienced and dedicated engineering team that excels in custom designs. MGM Transformers is committed to excellent quality and service, offering industry-leading lead times and exceptional customer service. MGM Transformers specializes… Read More…