Province Partners with YVR on Pilot Project Linking Clean Energy Companies for Electrificaiton Projects

December 12, 2022

A new government initiative will create jobs and economic opportunities for British Columbians by supporting made-in-B.C. companies to develop and sell clean-tech solutions locally, so they can solve industry challenges.

As part of the StrongerBC Economic Plan, the Integrated Marketplace Initiative kicks off with a pilot project that links Vancouver International Airport (YVR) to B.C. clean-technology companies that can help electrify its operations to meet its net-zero by 2030 commitment and become the world’s greenest airport.

“With the strongest economic recovery in Canada, B.C. is leading the transition to a high-wage, low-carbon economy,” said Ravi Kahlon, Minister of Jobs, Economic Recovery and Innovation. “The Integrated Marketplace Initiative is a part of a comprehensive economic plan that invests in our people, our communities and our environment for a better tomorrow.”

The Government of B.C. is investing up to $11.5 million to develop the new initiative and create a unique marketplace that matches innovators of clean, made-in-B.C. technology with industry buyers looking for clean-tech solutions.

This will provide small B.C. clean-tech companies with a platform to test their innovation on real-world challenges, while B.C. industry gets help solving challenging business problems. This will result in domestic customers for B.C. clean-tech companies and proof of concept to support scale up and export of B.C. innovation.  

The Integrated Marketplace Initiative begins with YVR as its initial testbed, to support its goal to transition airfield vehicles, primarily ground-handling equipment, such as baggage tractors, belt loaders and stair trucks, from diesel to electric power.

“We proudly signed on as the first testbed partner with the Province,” said Tamara Vrooman, president and CEO, Vancouver Airport Authority. “At YVR we have a deep commitment to climate action and continuous innovation. That innovation can be seen with our digital twin and with innovations such as this to electrify our operations and reduce emissions. These activities will continue to propel us towards our goal of becoming net zero by 2030 and the greenest airport in the world.”

At YVR, an alliance of providers and buyers will work together to identify business needs and source and test made-in-B.C. clean-technology solutions that reduce greenhouses gases, increase productivity and improve safety. This will allow for more streamlined innovation for B.C. companies, while driving and exporting more sustainable solutions to benefit all British Columbians. 

The Initiative aims to:

  • increase the resilience and productivity of B.C. industries, including supply chains;
  • grow B.C.’s innovation sector by increasing jobs and global exports through scaling up new B.C. technology products and services; and
  • reduce carbon emissions through the adoption of made-in-B.C. clean tech solutions.

The creation of the Integrated Marketplace Initiative is a key action of the StrongerBC Economic Plan, which moves B.C. forward by tackling the challenges of today, while growing an economy that works for everyone.

Quick Facts:

  • YVR expects to invest $135 million over the next 10 years to achieve net-zero carbon emissions by 2030 and signed the federal government’s Net Zero Challenge.
  • YVR is the first airport in Canada to achieve the highest level of Airport Carbon Accreditation (4+ Transition).
  • YVR recently signed commitments with two Cascadia Corridor airports (Seattle-Tacoma and Portland) to collaborate on decarbonize aviation, including areas of ground support equipment and the development of sustainable aviation fuel. 
  • More than 50% of licensed ground-handling vehicles at YVR are electric, and the airport has installed 94 airside charging stations for aircraft support vehicles. 

Learn More:

For more about the StrongerBC Economic Plan, visit: https://strongerbc.gov.bc.ca/plan/

For more about YVR’s Digital Twin project, visit: https://www.yvr.ca/en/media/news-releases/yvr-digital-twin-launch

Government of Canada’s Net Zero Challenge: https://www.canada.ca/en/environment-climate-change/news/2022/08/net-zero-challenge.html

YVR Reaches Highest level of Airport Carbon Accreditation:  https://www.yvr.ca/en/media/news-releases/2022/yvr-achieves-level-4-aca

Go HERE for more information

Related Articles


Latest Articles

  • Intermatic Acquired by MPE Partners

    Intermatic Acquired by MPE Partners

    May 19, 2025 By David Gordon, Channel Marketing Group, President The Intermatic deal is done. It has been rumored for months that Intermatic was being sold. Strategic buyers and private equity firms were mentioned as expressing interest and reviewing “the book” throughout the fall (and some mentioned even last summer.) According to sources, it was a “challenge” for… Read More…

  • 6 Things Contractors Need To Know About the Security Kit for Wire Mesh Tray

    6 Things Contractors Need To Know About the Security Kit for Wire Mesh Tray

    May 19, 2025 The rapid expansion of data centers has brought about significant challenges in maintaining data security standards. According to Statistics Canada, recovery costs from cyber security incidents in 2023 were $2.1 billion, up from $600 million in 2021. This critical situation requires a more robust cable management design to protect data from being… Read More…

  • NSAA Information on Potential Canada Post Strike

    NSAA Information on Potential Canada Post Strike

    May 19, 2025 In case of a possible Canada Post mail disruption: Source Read More…

  • How to do Business with ESA During a Canada Post Disruption

    How to do Business with ESA During a Canada Post Disruption

    May 19, 2025 The Electrical Safety Authority (ESA) is reminding stakeholders that they can continue to do business during a postal strike and ensure they meet their compliance obligations. This includes applications for inspection, LEC and ME licence renewals and payments.  Online Is Your Best Option  ESA has several options for LECs and MEs to… Read More…


Changing Scene

  • Catalyst Sales and Marketing Announces New Partnership with MGM Transformers

    Catalyst Sales and Marketing Announces New Partnership with MGM Transformers

    May 19, 2025 Catalyst Sales and Marketing is proud to announce a new line partnership with MGM Transformer Company, a recognized provider of dry-type and liquid-filled transformers for commercial, industrial, and infrastructure applications. With over 50 years of expertise, MGM delivers custom-engineered, reliable, and energy-efficient solutions designed to meet the demands of data centers, renewable… Read More…

  • Intermatic Acquired by MPE Partners

    Intermatic Acquired by MPE Partners

    May 19, 2025 By David Gordon, Channel Marketing Group, President The Intermatic deal is done. It has been rumored for months that Intermatic was being sold. Strategic buyers and private equity firms were mentioned as expressing interest and reviewing “the book” throughout the fall (and some mentioned even last summer.) According to sources, it was a “challenge” for… Read More…

  • Production Underway at Shawflex’s New Vaughan Manufacturing Facility

    Production Underway at Shawflex’s New Vaughan Manufacturing Facility

    May 19, 2025 Shawflex Facility Update! Shawflex announced via LinkedIn that production is officially underway at their new manufacturing facility in Vaughan. “While final steps are in progress and on track, our start to production is a testament to the seamless planning, coordination, and dedication of our incredible team. This milestone marks a major step forward… Read More…

  • EFC Welcomes New Manufacturer Member: Valid Manufacturing Ltd.

    EFC Welcomes New Manufacturer Member: Valid Manufacturing Ltd.

    May 19, 2025 Since 1992, Valid Manufacturing Ltd. has built their reputation as a world class innovator. By focusing on exceptional quality and service, they have developed strong relationships with renowned industry leaders. With four modern production facilities spanning over 100,000 sq. feet, Valid has the capacity and proven track record to tackle any project… Read More…