The Electric Circuit Introduces New Fast-Charge Stations with Power Sharing

August 31, 2023

The Electric Circuit is introducing new fast-charging stations with dynamic power sharing and making them available for the first time in Canada in the city of Rivière-du-Loup.

The new Satellites based charging stations are manufactured by Kempower of Finland and distributed in Québec by Bornes Québec. Three dual charging outlets share a total of 500 kW of power that is dynamically distributed among connected vehicles based on their respective charging capacities. Each charging cable can deliver up to 300 kW of power.

“These new stations are a welcomed addition to the Electric Circuit, since they’ll simplify the charging experience for our members and maximize the charging power. Our goal remains the same: to make the charging experience as simple and efficient as possible for EV drivers in Québec,”

France Lampron,
head of the Electric Circuit

“The Kempower charging stations are already proven to work in Finnish winter conditions. The tried-and-tested technology is perfectly adapted to our climate and the diversity of electric vehicles on Québec’s roads,”

Guy Lamarche,
General Manager of Bornes Québec

Dynamic power sharing simplifies the charging experience by allocating the maximum power available to each user based on the vehicle’s capacity.

Charging rates

Users won’t have to select the power level, which will be set automatically by the charging station and billed based on the vehicle’s capacity. The rates at these fast-charge stations are determined in the same way as those that apply at the other fast-charging stations in the Electric Circuit: per-second billing based on power tiers.

An innovative configuration

The configuration of the dual charging stations and cable management system also facilitates charging for all types of EVs. Vehicles hauling trailers and even travel trailers will be able to easily drive in and out, just like they do at gas stations. 

The first of these new charging stations will be installed at 80 Boulevard Cartier in Rivière-du-Loup, where St-Hubert restaurant has graciously given up part of its lot to make room for the charging point. St-Hubert is a founding member of the Electric Circuit.

Source

Related Article

The Electric Circuit Celebrates its 10th Anniversary in Quebec

The Electric Circuit, Québec’s largest public charging network for electric vehicles, celebrates the 10th anniversary of the commissioning of its first charging stations. This anniversary comes at a time of intense interest in electric vehicles with exponential growth of the number of EVs on our roads. However, when the Electric Circuit was launched a decade ago, this level of interest was not present. The Electric Circuit was the first to make it possible for Québec’s electric vehicle users to adopt this type of vehicle, which is slowly replacing combustion-engine vehicles.

Related Articles


Latest Articles

  • ESA 2025 Annual Licence Holder Meeting

    ESA 2025 Annual Licence Holder Meeting

    December 8, 2025 This year marked ESA’s 20th Annual Licence Holder Meeting — a milestone celebrating two decades of collaboration, innovation and safety leadership made possible by Ontario’s licence holder community. The meeting was held on Wednesday, November 26, 2025 Agenda Highlights Watch a recording of the 2025 Licence Holder Meeting. Read More…

  • BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    December 8, 2025 Get funding from BC Hydro for businesses upgrading eligible equipment with energy-efficient models. Funding rates vary depending on the equipment being upgraded, with past participants receiving an average of 30% for upfront costs. Incentives are available for: Bonus offer BC Hydro is currently offering a 30% bonus incentive on all business energy-saving incentives projects… Read More…

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…

  • Why Choosing the Right USB Charger Matters

    Why Choosing the Right USB Charger Matters

    December 1, 2025 Not all USB Chargers are Created Equal As the number of devices used daily increases, so does the need for a charger that delivers safe speeds and maximum charging potential. A high-quality USB charger delivers efficient charging without risk of damage, but the sea of USB chargers and outlets available on online… Read More…


Changing Scene

  • BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    December 8, 2025 As the BC Legislature wraps up the final week of the Fall session, BCCA is very pleased to see Bill 20 receive Royal Assent and officially become the Construction Prompt Payment Act, SBC 2025, c 24. This marks a significant milestone for BC’s construction sector. This achievement reflects decades of consistent, principled… Read More…

  • Federal Government Announces New Measures to Support Steel and Lumber

    Federal Government Announces New Measures to Support Steel and Lumber

    December 8, 2025 The world is changing rapidly. The United States, the world’s largest economy, is fundamentally reshaping all its trade relationships, causing major disruption and upheaval for Canadians. It is time to transform our economy from one that is reliant on a single trade partner to one that is stronger, more self-sufficient, and resilient… Read More…

  • Skills Ontario Celebrates the Expansion of Trades & Tech Truck Program

    Skills Ontario Celebrates the Expansion of Trades & Tech Truck Program

    December 1, 2025 Skills Ontario is expanding its fleet of Trades & Tech mobile unit thanks to support from the Ontario Government. The government announced this morning it’s investment in Skills Ontario to expand experiential opportunities for Ontario’s future workforce.    “Ontario’s future relies on a strong, skilled workforce,” said David Piccini, Minister of Labour, Immigration,… Read More…

  • BC’s Canadian Mutual Recognition Agreement aims to Facilitate Interprovincial Trade

    BC’s Canadian Mutual Recognition Agreement aims to Facilitate Interprovincial Trade

    December 1, 2025 A new agreement signed by all provinces, territories, and the federal government will break down interprovincial trade barriers, making it easier for B.C. businesses to sell products across Canada, and for people to buy Canadian-made goods.   “When threats to Canada’s economic security land at our doorstep, we’re at our best when we work together as… Read More…