The Circular Built Environment in Canada: A Review of the Current State, Gaps and Opportunities

CSA Group Logo

May 10, 2024

Citation: Goodland, H., and Walsh, K. (2024). The circular built environment in Canada: A review of the current state, gaps and opportunities. Canadian Standards Association, Toronto, ON.

    Executive Summary

    Circular

    The construction industry is a major consumer of natural resources and imposes significant impacts on the environment. A circular built environment (CBE) is necessary to manage the increasingly limited supply of natural resources, minimize waste and achieve carbon-emission reductions, while providing the housing and infrastructure society needs.

    CBE proposes an alternative to the current linear economy of “take-make-use-dispose.” It is a restorative and regenerative system in which the goal is to recapture the value of existing buildings, increase their durability, and create new buildings whose materials can be used, and reused, long into the future.

    CBE is at an early stage of adoption in Canada. Barriers to CBE include transitional costs, lack of awareness, industry fragmentation, supply chain complexities and inconsistent regulations. Bringing CBE into the mainstream will require collaboration across government, business and academia. Standards can play an important role in the adoption of circularity by providing the language we use to identify it, guidance for policies and regulations, and examples to ease adoption.

    Through a literature review, interviews with industry leaders and two roundtable workshops, this study sought to explore the current state of CBE in Canada, identify gaps and recommend a path forward.

    The following are actions that can be taken across the construction sector:
    • Create a national waste management framework with aligned metrics, definitions and targets across regions and provinces.
    • Include embodied carbon requirements and references in codes and policies.
    • Incorporate CBE criteria and how to use reclaimed materials in design standards for the key structural materials referenced in the National Building Code of Canada (NBC). These include steel, concrete, wood and masonry.
    • Simplify certification of salvaged materials for reuse (not downcycling).
    • Create a pan-national network of markets for reused materials through increased disposal fees.
    • Commit to a national building information modelling (BIM) mandate to facilitate project data management and reporting.
    • Extend net-zero policy roadmaps to cover waste/resource efficiency and other benefits circular practices offer.
    Gaps were identified and recommendations were made in the following six categories:
    1. Definitions: Standardized definitions can alleviate an inconsistent use of terminology for circularity in Canada. These definitions are needed to provide aligned perceptions. Additional education and outreach can inform the industry on the value of circularity.
    2. Standards: Metrics and guidance can be incorporated into standards to assist in setting goals and establish a pathway to achieve them. Research for standards provides the technical legitimacy to encourage their adoption and the specifications for implementation. Research into reuse of structural materials was specifically identified as a need to encourage a CBE.
    3. Data, metrics and indicators: Data is needed to understand where the greatest need lies and where gains can be made quickly. Material specifications in environmental product declarations (EPDs) can be more consistent and accessible, and life cycle assessments (LCAs) can be created in a more consistent manner for comparison. Waste diversion and recycling rates can be analyzed across regions to identify where more resources can be allocated for reuse or material diversion activities. A circularity index could be developed from this data to identify excellence and best practices in CBE.
    4. Governance: National codes should add guidance on the alteration, change of use and deconstruction of existing buildings, as well as on the use of salvaged materials. Governance can also provide guidance on use of prefabricated components designed for disassembly, to remove the burden of alternative compliance pathways in project approval.
    5. Technical issues: Technical issues such as choice of material, design of a structure, and how components are connected are key to adoption of CBE. There is a gap in accessibility of this information and guidance on how to use it.
    6. Market barriers: Market barriers exist for circular practices. The extra effort required impedes action to find materials for reuse, design for deconstruction, or consider the full life-cycle cost instead of the immediate construction or repair costs. Procurement and contracts need updated models and templates.

    CBE will play a crucial role in mitigating embodied emissions as Canada collaborates with other nations to minimize the carbon footprint of buildings and address the impacts of climate change. Establishing a CBE necessitates a paradigm shift in approach to material usage, encompassing considerations such as extraction, design, reuse and diversion from landfills. Although this transformation will require time, the process can be expedited by leveraging existing examples of techniques from within Canada and internationally, and by embracing innovative methods that may emerge as momentum for CBE gains traction.

    Go HERE for more information

    Related Articles


    Latest Articles

    • Take the Lesson

      Take the Lesson

      September 2, 2024 By Keith Sones, seasoned utility industry executive “I really don’t want to do this.” “You have to Keith. You have no choice. You can’t leave him hanging” replied my wife. I stared at the phone like a child looks at liver on their plate. They know you have to eat it but also… Read More…

    • Quebec Drives the Growth in Residential Building Construction in June, 2024

      Quebec Drives the Growth in Residential Building Construction in June, 2024

      Investment in building construction grew 2.8% to $21.4 billion in June, after a slight increase of 0.8% in May. These increases partly reflect April’s record high of $13.4 billion in total building permits value, since investment levels for a given period are driven by permits issued in prior months. The June increase in investment in building construction was primarily… Read More…

    • Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

      Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

      August 16, 2024 The new Western Memorial Regional Hospital in Corner Brook is home to Canada’s largest geothermal system, which has set a precedent for modern infrastructure for both Newfoundland and Labrador and North America. The geothermal field is approximately 600 feet below the hospital’s parking lot, and provides 100 per cent of the ground… Read More…

    • Brightening Communities: LED Technology in Action

      Brightening Communities: LED Technology in Action

      August 15, 2024 By Alex Price, Brand & Planning Manager, Current LightingTechnical Contributor: Gary Steinberg, Senior System Manager (Outdoor LED Fixtures), Current Lighting As the landscape of Canadian cities continues to evolve, the importance of outdoor lighting cannot be overstated. From enhancing public safety to promoting economic activity and fostering a sense of community, well-planned… Read More…


    Changing Scene

    • Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

      Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

      Schneider Electric is transforming its Digital Buildings business in Canada with the launch of the SMART Buildings Division. This evolution marks a strategic move to deliver comprehensive solutions and services that support building owners and operators in achieving their decarbonization and sustainability goals. The demand for smart buildings is surging, driven by a global shift… Read More…

    • Introducing Alan Bearden as Interim President of Southwire Canada

      Introducing Alan Bearden as Interim President of Southwire Canada

      September 4, 2024 Southwire Canada is pleased to announce that Alan Bearden has been appointed Interim President. In this role, Alan will provide leadership and guidance for Southwire’s Canada-based organization, ensuring continuity and driving growth during this transitional period. Alan Bearden brings a wealth of experience to the position, having joined Southwire in 2008. Over… Read More…

    • A Partnership Between Electromag Graybar Canada and Phoenix Contact

      A Partnership Between Electromag Graybar Canada and Phoenix Contact

      September 3, 2024 Electromag Graybar Canada, a pioneer in industrial automation solutions and pneumatic products, is excited to announce a partnership with Phoenix Contact, a global leader in electrification, networking, and industrial automation. This collaboration, which initially began in the Langley and Ontario branches, is now expanding to Quebec. The alliance aims to provide cutting-edge… Read More…

    • Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

      Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

      September 2, 2024 William (Bill) C. Smith, Director, Transitional Business of Electrozad Supply Company Limited announced his retirement as of August 30th, 2024 after 49 years of leadership. Bill began his electrical career working part-time at Electrozad Supply while completing a Sales & Marketing Program at St. Clair College.  After his first full-time position in… Read More…