Government of Canada Introduces New Canada Green Buildings Strategy

July 18, 2024

The first-ever Canada Green Buildings Strategy introduces the Government of Canada’s plan to make life cost less for Canadians, fight climate change, and support good jobs across the country. By improving energy efficiency in Canada’s homes and buildings through retrofitting, we can save Canadians money on their energy bills and reduce building emissions. 

Today, the Minister of Transport and Quebec Lieutenant, the Honourable Pablo Rodriguez, and Joël Lightbound, Member of Parliament for Louis-Hébert, on behalf of the Honourable Jonathan Wilkinson, Canada’s Minister of Energy and Natural Resources, announced a federal investment of $12.6 million in the Société de financement et d’accompagnement en performance énergétique Canada (SOFIAC). This funding will help them accelerate their expansion into energy efficiency for commercial buildings and multi-unit residential buildings, helping building owners and tenants save on their energy bills and reduce emissions.

Through the Green Buildings Strategy, the Government of Canada will invest $177 million for Deep Retrofit Accelerator Initiative projects like this, which support upgrades to multiple building systems and equipment in commercial, institutional, or mid- or high-rise multi-unit residential buildings across Canada. These projects will replace roofs, upgrade windows, insulation, or building cladding, to save money and cut pollution. 

At a time when Canadians are feeling the impacts of the high cost of living, another key part of the Green Buildings Strategy will help low-to-median-income Canadians, including renters, upgrade their homes to save money on their energy bills and cut pollution. This new program, the Canada Greener Homes Affordability Program, will provide retrofits at no cost to the household and save them hundreds of dollars on their energy bills per year.

Canadians want to live in sustainable communities: places with clean air, affordable homes and good jobs. The Government of Canada’s investments in greening buildings and switching from fossil fuels to clean electricity are key to lowering GHG emissions while supporting a strong economy and making life cost less. 

Quick Facts 

  • Buildings are Canada’s third-largest emitter of GHG emissions. Nearly all building emissions – over 96 percent – come from space and water heating. To tackle this, major changes in the building sector are underway, with the potential to create hundreds of thousands of jobs and help Canadians save money on their energy bills.
  • Retrofitting existing buildings, building green from the start, and choosing alternatives to fossil fuel heating equipment, such as electric heat pumps, will help Canada achieve its net-zero commitments by 2050. There is also a need to build stronger to better equip communities to withstand the effects of climate change.
  • To reach Canada’s climate goals, reduce energy bills and build up Canada’s supply of energy-efficient and resilient building stock, there is a need to accelerate the retrofit of approximately 10 million buildings and construct millions of new net-zero buildings in the coming decades.
  • Canadian households spend an average of $2,200 a year on home energy costs and these costs are significantly higher in homes that heat with oil and in older homes with poor insulation, ventilation and heating/cooling systems.
  • The Canada Green Buildings Strategy is a commitment in the 2030 Emissions Reduction Plan: a sector-by-sector approach to reach Canada’s climate target of cutting emissions by at least 40 percent below 2005 levels by 2030, laying the foundation to achieve net-zero emissions by 2050.
  • Retrofits under the Canada Greener Homes Grants have been issued to 240,000 Canadian households, with an average grant of $4,400 per household. These retrofits are removing over 306,540 metric tonnes of GHG emissions, equivalent to taking nearly 94,000 fossil fueled powered vehicles off the road.
  • The Canada Green Buildings Strategy is funded as a part of Budget 2024 and is mentioned in Solving the Housing Crisis – Canada’s Housing Plan. It complements Canada’s National Adaptation Strategy, which lays out a framework to reduce the risk of climate-related disasters, improve health outcomes, protect nature and biodiversity, build and maintain climate resilient infrastructure, and support a strong economy and workers. New and ongoing federal initiatives are already starting to put the Strategy’s vision in practice.

Related Information 

Source

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…