Canada Tests a New Prototype Building that was Constructed in Eight Days

February 2, 2025

The Minister of Transport and Internal Trade, the Honourable Anita Anand, announced the successful construction of a new prototype building at the drones and robotics test field on the grounds of the former Killaloe Airport.

The small, 380 square foot building was built in only eight days, which can be seen in a timelapse video. Traditional construction of infrastructure can be costly and time-consuming, particularly in remote areas. A building of comparable size to the prototype test building could take several weeks or months to build using traditional construction methods.

Transport Canada is researching rapid construction technology as a possible way to quickly build structures. Potential use of the technology could include the construction of utility and storage buildings, operation centres, outbuildings, and emergency response structures that can be torn down after use, flat-packed, and shipped elsewhere.

Invest Ottawa, which is Transport Canada’s testing partner on the project, will examine the building’s durability and suitability as a multi-purpose structure. Funding for this project was made possible through Innovative Solutions Canada, a program from Innovation, Science, and Economic Development Canada.

Source

Related Articles


Latest Articles


Changing Scene

  • BC Hydro Making it Easier and More Affordable to Connect New Homes

    BC Hydro Making it Easier and More Affordable to Connect New Homes

    July 24, 2025 BC Hydro is supporting the construction of new housing developments in growing communities by advancing changes to streamline upgrades and reducing the cost of new customer connections to BC Hydro’s electricity grid. “As communities across B.C. grow, so does the need for essential housing. We are committed to ensuring we’re ready to… Read More…

  • Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    Mitrex Sets Record with Largest BIPV Solar Panel Mural at SunRise Residential in Edmonton

    July 22, 2025 Building-Integrated Photovoltaics (BIPV) manufacturer, Mitrex proudly announces that its transformative SunRise Residential project in Edmonton, Alberta, has earned the Guinness World Record for the largest solar panel mural globally. This landmark project showcases Mitrex’s innovative BIPV solar panels, blending cutting-edge solar technology with vibrant cultural artistry to redefine sustainable architecture. Sustainable Architecture with BIPV Spanning over 30,000 square feet, the Mitrex eFacade PRO plus… Read More…

  • Nexans Unveils a Cable Made with 100% Recycled Materials

    Nexans Unveils a Cable Made with 100% Recycled Materials

    July 24, 2025 Nexans has reached a major milestone in its sustainability journey by developing a prototype cable made entirely from recycled materials — a first in the company’s history. This innovation combines technical performance, industrial feasibility, and a drastically reduced environmental footprint, marking a decisive step forward in circular economy. A cross-continental success story… Read More…

  • EFC Welcomes New Manufacturer Member: MGM Transformers

    EFC Welcomes New Manufacturer Member: MGM Transformers

    July 24, 2025 Since 1974, MGM Transformers has produced tough and trusted transformers designed to get the job done right. As a leading manufacturer, the company employs a highly experienced and dedicated engineering team that excels in custom designs. MGM Transformers is committed to excellent quality and service, offering industry-leading lead times and exceptional customer service. MGM Transformers specializes… Read More…