Province, BC Hydro Launch Pilot Program to Cut Energy Costs, Support Housing Density

June 25, 2025

In a Canadian first, the Province and BC Hydro have launched a pioneering pilot project in Vancouver that has the potential to set new standards for supporting growing housing priorities and densification in Canada.

Designed to support the transition from single-family homes to multi-unit residences, the initiative is exploring how full electrification – heating, cooling, EV charging and appliances – can be achieved without the need for more significant electrical service upgrades.

“The potential for this innovative system shows what’s possible when we partner with local technology providers to make clean energy more accessible,” said Adrian Dix, Minister of Energy and Climate Solutions. “We’re proud to support made-in-B.C. solutions that reduce emissions, strengthen our grid and lower energy costs for residents.”

At the core of this project is a smart panel developed by Burnaby-based Evectrix, a key innovation supported through a $600,000 investment from the Province’s Innovative Clean Energy Fund and BC Hydro’s $700-million Energy Efficiency Plan. This device transforms a conventional breaker panel into a “smart hub” that manages real-time energy usage, in this case eliminating the need to upgrade from a 200-amp to a 400-amp service, even in an electrified six-unit development.

This pilot project is Canada’s first to demonstrate:

  • all-suite electrification in a multi-unit residential building without requiring a significant service upgrade;
  • a smart panel integration with advanced thermostats for greater suite-level energy control; and
  • management of multiple non-EV electrical loads, such as hot water, ranges and dryers, through a single smart panel.

Traditionally, densifying from single-family homes to duplexes, fourplexes and sixplexes has required significant electrical upgrades. This project explores a better path: the smart panel dynamically manages load at the suite level, helping avoid over-capacity while unlocking significant savings. The project is a scalable model for retrofitting and densification that could save thousands of dollars in infrastructure costs per project.

Special permission was given from the City of Vancouver in order for the project to be installed at the location. Through the Consortium for Power Efficient Design, BC Hydro continues working with partners to advocate for changes to the Canadian Electrical Code, expanding the use of energy management systems like the one being explored through this project.

“This technology pilot is a potential game-changer for accelerating clean-energy adoption in multi-unit housing,” said Chris O’Riley, president and CEO, BC Hydro. “It not only supports our broader goal of building a more sustainable and efficient electricity system, but it also helps customers avoid the high costs of major electrical upgrades – making densification more accessible, affordable and practical.”

Through its $700-million Energy Efficiency Plan, BC Hydro is significantly increasing investments in energy-saving tools, technologies, programs and rebates. These measures are expected to deliver 2,000 gigawatt hours in electricity savings – enough to power approximately 200,000 homes. The project, located on Vancouver’s Chestnut Street, is one of many innovative pilot programs now underway or in development, designed not only to reduce consumption today but to empower customers to manage their energy use more efficiently in the years ahead and save money.

If this approach proves successful, it could set the stage for more customer-focused energy solutions that help households and businesses lower their bills, reduce emissions and take advantage of smarter, more responsive grid technologies. These efforts are part of BC Hydro’s long-term commitment to delivering value, reliability and sustainability to customers as energy needs evolve.

Souce

Related Articles


Latest Articles

  • Ontario Solar Incentives with Essex Energy

    Ontario Solar Incentives with Essex Energy

    August 20, 2025 Essex Energy is helping municipalities, universities and colleges across Ontario take advantage of incentives under Ontario’s Retrofit DER Program including solar photovoltaic (PV) systems. What’s Available Significant rebates available to eligible businesses and institutional organizations deploying rooftop or parking lot solar PV systems. These incentives are paid upon completion of the project, accelerating project… Read More…

  • Beyond the Bid: How Modern Estimating Solutions Drive Contractor Success

    Beyond the Bid: How Modern Estimating Solutions Drive Contractor Success

    August 18, 2025 By Brooke Stewart In today’s fast-paced construction landscape, electrical contractors are constantly pressured to keep their estimates competitive, often at the expense of healthy profit margins. Compounding this challenge are rising material costs, a shortage of skilled labor and siloed data, all of which make it increasingly difficult to stay competitive and… Read More…

  • Hammond Power Solutions Helps EFC Champion Sustainability as First Carbon Neutral Sponsor at Annual Industry Conference

    Hammond Power Solutions Helps EFC Champion Sustainability as First Carbon Neutral Sponsor at Annual Industry Conference

    August 18, 2025 By Electro-Federation Canada Did you know that carbon emissions from this year’s Annual Industry Conference were offset? With the help of Hammond Power Solutions (HPS), EFC took an important step toward reducing our environmental impact by offsetting the emissions associated with the event. This milestone reflects a growing commitment within the electrical… Read More…

  • FortisBC Detail Impact of their Energy-Efficiency Programs in 2024

    FortisBC Detail Impact of their Energy-Efficiency Programs in 2024

    August 18, 2025 In 2024, FortisBC Energy Inc. and FortisBC Inc.’s (collectively FortisBC) conservation and energy-efficiency programs helped lower gas and electricity use while helping create more comfortable living and working spaces for customers. Building on 2023 reductions, its gas programs cut close to one million tonnes of carbon dioxide equivalent (tCO₂e) 1 in 2024. “Our customers’… Read More…


Changing Scene

  • Blackline Safety Announces Quality Assurance Program Expansion

    August 18, 2025 Blackline Safety Corp. has announced a major expansion of its quality assurance (QA) program. As part of the expansion, the company has increased its QA team, upgraded its inspection equipment, and boosted in-lab testing of its entire product line. Headquartered in Canada with offices in the UK, France, U.S., and UAE, Blackline… Read More…

  • EB Horsman Introcuce New Burnaby Branch Manager

    EB Horsman Introcuce New Burnaby Branch Manager

    August 18, 2025 EB Horsman & Son is pleased to announce the promotion of Sean O’Brien to Branch Manager of their Burnaby location, effective August 6, 2025. Sean brings over 15 years of experience in the electrical and lighting industry, with a strong background in sales, technical leadership, project management, and clean energy initiatives. He… Read More…

  • BCCA Response to “Report on 2026 Budget Consultation”

    BCCA Response to “Report on 2026 Budget Consultation”

    August 18, 2025 BCCA is pleased to receive the Standing Committee on Finance and Government Services’ Report on the 2026 Budget Consultation, and celebrates the emphasis placed on supporting BC’s construction industry and workforce. Chris Atchison, President of the BCCA, spoke to the Committee on the recommendations and priorities of BC’s construction industry. These included:… Read More…

  • NSAA Introduces Mentorship for Women Apprentices Program

    NSAA Introduces Mentorship for Women Apprentices Program

    August 18, 2025 This program is designed to support the retention and progression to certification of women apprentices in the 39 Red Seal Construction or Manufacturing trades. The program pairs women apprentices with experienced tradespeople to provide guidance, career development, and support throughout their apprenticeship journey. The program is for 6 months, with the mentor and… Read More…