Doubling Pace of Construction over Next Decade Would Restore Housing Affordability to 2019 levels

June 30, 2025

Canada Mortgage and Housing Corporation (CMHC) released new estimates on Canada’s housing supply gaps showing that a return to housing affordability levels last seen in 2019 will require between 430k and 480k new housing units be built annually over the next decade. This is an approximate doubling of the current pace of home construction in Canada. 

New this year, the report provides specific housing supply gaps for the country’s largest Census Metropolitan Areas (CMAs), outlining how many housing starts are needed above what is projected to be built in a ”business-as-usual” scenario in both the homeownership and rental markets. These estimates follow previous CMHC research on productivity showing the homebuilding industry in Canada currently has the potential capacity to build more than 400k new homes per year.   

Supply gaps in largest CMAs:

  • It is estimated Montréal faces the largest housing supply gap of the large CMAs. Current trends show housing affordability challenges will become much more acute if housing supply is not significantly increased. Since the pandemic, and when compared to local incomes, homeownership costs in Montréal have risen faster than any of the large CMAs. Strong rental construction in recent years must be expanded and matched by a significant increase in new units intended for the homeownership market.
  • In Toronto, it’s estimated a 70% increase in homebuilding over the next decade would help to improve affordability issues. Despite increased rental construction in recent years, the region is lacking homeownership options that match local incomes.
  • In Vancouver, it is estimated 7.2k additional homes are needed annually above the “business-as-usual” scenario, an increase of 29%. In 2023, more than 33k housing starts were recorded in this CMA. This continued level of construction would help the region’s longstanding affordability issues for both homeowners and renters.
  • Calgary, which has seen record levels of home construction for three consecutive years, is estimated to need 45% more new homes annually above the “business-as-usual” scenario. This would help counter post-pandemic affordability challenges, for both the homeownership and rental markets.
  • Ottawa-Gatineau is estimated to have the second largest housing supply gap of Canada’s large CMAs. The region saw increased homebuilding from 2021 through 2023, but since the pandemic, new supply has not kept pace with increased housing demand.
  • In Edmonton, no additional supply is required beyond what is currently projected, as sufficient market housing is expected to be built in the region to maintain affordability by 2035. As the focus of the report is on average affordability for market housing, this result does not reflect continuing challenges in Edmonton, such as homelessness.
  • By province, the most significant housing supply gaps are in Ontario and Nova Scotia, which saw some of the fastest rising housing costs due to the pandemic, and British Columbia.

Read the full Supply Gaps Estimate on the CMHC website.

Watch CMHC’s podcast on the report here

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric has announced the company has rebranded as Bernie’s Electric Supplies Ltd, a nod to their founder. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values that have guided the company for nearly 50 years. As we grow and evolve, this name Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…