Southwire SIMpull Solutions at Texcan

March 2, 2026

Southwire’s SIMpull Solutions® speeds up installation time, creates a safer work environment, and revolutionizes the way you pull cable.

Discover the future of electrical wire installations with Southwire’s cutting-edge SIMpull Solutions®. Designed to simplify and enhance every step of the process, from cable pulling to material handling, these revolutionary solutions are engineered to elevate efficiency, reduce labour, and ensure utmost safety.


SIMpull Stack™ Reels

Parallel and the original, patented SIMpull Stack™reels allow you to combine multiple pulls on one single reel. ONE REEL with up to 5 wires of individually coloured conductors, for up to 4 pulls, depending on the size of the cable and length of the pull.

SIMpull™ REEL

A traditional cable pull typically requires a tremendous amount of labour, equipment, and time to move, set up, and pay off feeder cables safely. The SIMpull™ Reel maneuverable payoff system eliminates the need for additional equipment and makes it possible for one worker to safely and efficiently maneuver a 6,000 lb reel through narrow halls and doorways.

SIMpull Head® pulling grips

Save time, waste, and clean-up with SIMpull Head® pulling grips. The heads’ low profile and staggered design ensure that they can fit through any conduit or bend. Reels can be pre-installed with SIMpull Head® pulling grips for your convenience.

SIMpull™ Cradle

Southwire’s SIMpull™ Cradle allows for easy, one-person operation to load and unload SIMpull™ Reels. A single contractor can payoff directly off the cradle and is forklift/pallet truck maneuverable.

Simple Delivery

Have your colour, paralleled, cut-to-length reels, with SIMpull Heads™ pulling grips installed and delivered on SIMpull® Payoffs, on our SIMpull™ Truck. You can then move the reels on the payoffs to the pull site, or you can back a flatbed truck with SIMpull® Payoffs up to your jobsite, hook the rope to the pulling grips and start your pull.

NoLube® SIMpull RW90™

Experience the next level of convenience and efficiency with NoLube® wire technology. Say goodbye to messy lubricants and hello to a cleaner, faster installation process. NoLube® SIMpull® cables are engineered to reduce friction, making cable pulling smoother and hassle-free.

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…