PowerStream Goes Public with High-Speed EV Charging

Power Stream

 

Electric vehicle (EV) owners, who reside in or travel through Vaughan, ON can now take advantage of a high-speed charging station that can power up their cars in less than 30 minutes and at no cost.

PowerStream’s head office unveiled a level 3 charger unit that is being made available for public use. The unit, which charges 10 times faster than the more common-place level 2 chargers, is equipped to handle both CHAdeMO and Society of Automotive Engineers (SAE) compatible electric vehicles.

The level 3 charging station’s power is being supplied by PowerStream but paid for courtesy of G&W Canada and Survalent Technology.

PowerStream has also introduced the first commercial Vehicle-to-Grid (V2G) power supply system in North America, with two high-capacity level 2 chargers connected to a solar carport located in the back parking lot of the company’s head office building. PowerStream worked with Nissan to better understand how the all-electric LEAF can be connected to power systems to potentially benefit utility companies and drivers alike.

There are currently more than 2,000 electric vehicles in Ontario and approximately 300 in PowerStream’s service territory. PowerStream’s unveiling of level 3 and V2G charging systems today is consistent with the company’s ongoing commitment to facilitate the connection of electric vehicles to the power grid.

 

Related Articles


Latest Articles

  • STANDATA Bulletin Section 6 – Services and Service Equipment

    STANDATA Bulletin Section 6 – Services and Service Equipment

    July 27, 2026 The purpose of this STANDATA bulletin is to clarify Section 6 of the 2024 Canadian Electrical Code (CE Code), Part 1, which outlines the installation requirements for services, service equipment, and metering equipment. View the Bulletin: Read More…

  • Behind the Glow: How Neonview Helped Shape Vancouver’s Newest Landmark Roof

    Behind the Glow: How Neonview Helped Shape Vancouver’s Newest Landmark Roof

    July 27, 2026 Some projects are exciting because they’re new. Others are exciting because you can feel how many people had to be exceptionally good at their craft to make them look effortless. The PNE Amphitheatre (Freedom Mobile Arch) is the latter. The notable largest free-span wood roof in North American is the headline, but the lighting is the… Read More…

  • Canada Light Expo: Energy Efficient Lighting Solutions for Modern Businesses

    Canada Light Expo: Energy Efficient Lighting Solutions for Modern Businesses

    July 27, 2026 How Energy Efficient Lighting Can Help Modern Businesses Balance Profitability with Environmental Responsibility In today’s competitive business landscape, organizations are constantly seeking ways to reduce operational costs, improve sustainability, and foster productive work environments. Among the most impactful yet often overlooked areas of optimization is lighting. As businesses strive to balance profitability… Read More…

  • Stelpro Baseboard Heating: Reliable Comfort for Commercial & Residential Spaces

    Stelpro Baseboard Heating: Reliable Comfort for Commercial & Residential Spaces

    July 27, 2026 By EB Horsman & Son As temperatures rise and winter fades into the background, heating systems might not be top of mind. However, spring and summer are actually the ideal time to plan ahead. Installing or upgrading your heating system now can save time, reduce stress, and ensure you are fully prepared… Read More…


Changing Scene