Hammond Power Solutions Inc. Q1 2015 Results up 5.3% from Q1 2014

Hammond Power

 

Hammond Power Solutions Inc. announced its financial results for the first quarter of 2015. Sales for the quarter-ended March 28, 2015 were $63,137,000, an increase of $3,184 or 5.3% from Q1, 2014 sales of $59,953,000. The company has been lifted by a modestly improved, construction, alternative energy, and project market segments. International sales for Q1, 2015 finished at $7,336,000 versus $8,276,000 in Q1, 2014, a decrease of $940 or 11.4%.

The company increased bookings 14.8% over Quarter 1, 2014 due to stronger bookings in both the distributor and direct channels in North American and International markets. Booking rates in the distributor channel increased 11.4% over Q1, 2014. On a direct channel basis, bookings exceeded

Q1, 2014 by 17.8%. Backlog increased 16.6% over Q 4, 2014 and finished higher by 15.8% when compared to Quarter 1, 2014 due to higher booking rates in several markets including the Canadian and U.S. OEM markets.

HPS CEO Bill Hammond commented, “We are enjoying the largest growth in bookings and backlog across all of our global operations since 2012.”

Q1 2015 earnings from operations was $1,446,000, an increase of $143,000 or 11.0% from $1,303,000 for the same quarter last year. The improvement in the quarter is a result of higher sales, increased gross margin dollar contribution and a higher foreign exchange gain.

In Q1, 2015, the company announced that it had completed the formation of a new joint venture company, Corefficient S. de R.L. de C.V. (“Corefficient”). Corefficient will design, manufacture and market energy efficient electrical cores, a major component used in the manufacture of dry type and liquid filled transformers. Corefficient will be based out of Monterrey, Mexico, where a state of the art manufacturing facility is currently under construction and will be fully operational by Q4 2015.

Hammond commented, “Corefficient is an exciting venture and is reflective of the strong, long-term relationship between Hammond Power Solutions Inc. and National Material LP. Both partners bring the value of people, technology and financial strength to Corefficient. The manufacturing operation will be world class.”

Hammond concluded, “We are cautiously optimistic about our growth going forward. This is supported by our growing bookings and backlog and we continue to expand our penetration of the geographies we serve. We are confident that our financial strength, core competencies and long term strategies will accelerate our growth as markets start to improve.”

 

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene