Horizon Utilities – Foodland Partnership Saves Over 53,000 kWh Annually

Horizon Utilities

 

A lighting retrofit of Mount Albion Foodlandin Hamilton, ON —conducted with assistance from Horizon Utilities — will save an estimated 53,121 kWh per year.Horizon Utilities’ conservation and demand management teams worked with Mount Albion Foodland to find greater efficiencies and accessing incentives offered bythe Independent Electricity System Operator (IESO).

Photo: L-R: Mike Donato (Store Manager, Mt. Albion Foodland) Wayne Allen (Energy Manager, Horizon Utilities), Brian Smith (Chief Conservation Officer, Horizon Utilities)

Mount Albion Foodland replaced much of the lighting throughout the store to improve the appearance as well as becoming more energy efficient by replacing outdated incandescent lighting with new LED refrigerator strip lighting and ceiling LED troffers. Beyond the significant energy savings, the local grocery store qualified for a $22,840.00 saveONenergy retrofit incentive for dramatically reducing the facility’s energy consumption.

For more information on conservation and demand management programs available at Horizon Utilities, visit horizonutilities.com/Conservation.

 

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene