OPG Announces John Wesley Beaver Award Winners

OPG

Brittnee Sheridan and Jamie Monague are the 2015 recipients of the Ontario Power Generation (OPG) John Wesley Beaver Memorial Student Awards. The awards help foster Aboriginal students’ post-secondary studies at Ontario colleges and universities in targeted fields of study.

Sheridan belongs to the QalipuMi’kmaq First Nations group. She has just finished an undergraduate degree in Law and Justice/Indigenous Studies at Laurentian University, and will be starting law school at the University of Ottawa this fall. Monague is from the Kettle and Stony Point First Nation in Southwest Ontario. He has just completed his first year at Lambton College in the Mechanical Technician – Industrial Maintenance program.

The JWB awards reflect OPG’s commitment to educating youth and increasing the representation of Aboriginal employees in the electricity sector. John Wesley Beaver was one of Ontario Hydro’s most notable Aboriginal engineers.

“Brittnee Sheridan and Jamie Monague exemplify the values of Jack Beaver in their commitment to education, family and their communities,” says Tom Mitchell, OPG President and CEO. “Like Mr. Beaver, Britnee and Jamie are important role models for Aboriginal youth.”

OPG works with more than 50 Aboriginal communities from across the province, helping create opportunities, training and jobs.

Established in 1997, the awards pay tribute to the contributions of John Wesley (Jack) Beaver, who was one of Ontario Hydro’s (OPG predecessor) most notable Aboriginal engineers and Chief of Alderville First Nation in the 1950s. Jack Beaver exemplified leadership, with concern for his family, his people, his colleagues and his community. To date there have been 32 JWB Award recipients. Up to two awards are available annually to qualified students and include a financial award along with the potential for a work placement at OPG.

 

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…