McMaster University’s New Engineering Lab to Study Energy Use

McMaster Engineering

Canadian Architecture magazine reports that McMaster University in Hamilton, ON has broken ground for the Gerald Hatch Centre for Engineering Experiential Learning. The 2600-square-metre building, designed by Diamond Schmitt Architects, will house the new Research Facility for Integrated Building Energy Harvesting Systems (ReFIBES), the only test facility of its kind in North America.

A $2-million grant from the Canada Foundation for Innovation (CFI) will enable the facility to study green energy and investigate new ways to capture energy supply that is lost during transmission.

“The building itself will be very much a learning laboratory that incorporates means of storing, measuring and analyzing energy use,” said Sarah Low, Associate, Diamond Schmitt Architects. Among the features of this LEED Silver target facility, reports Canadian Architect, will be
•    sensors in the façade to measure and analyze vision glass and exterior façade performance and
•    a geothermal field for research into the storage of energy collected from a variety of sources. The roof will house
•    a Solar Spectrum monitor, a Solar Spectrum Simulator and a Photovoltaic array on the roof to collect and analyze solar energy

The facility will harvest electrical, thermal and fuel energy where it naturally converges—in buildings — and be a testing ground to prove the energy efficiency of developing similar, smaller, community-based facilities.

Read the full article here: https://www.canadianarchitect.com/architecture/mcmaster-university-engineering-lab-to-study-energy-use/1003729501/.

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene