Quebec’s Electric Circuit Rolls into Ontario

Fast charging stations in the Quebec-Ottawa corridor

The Ontario Government has accepted a proposal from Electric Circuit to set up a fast-charge corridor between Quebec and the Ottawa area.This project was submitted further to a request for proposals for public and private partners to set up a public charging infrastructure for electric vehicles (EVs) throughout Ontario.

The rollout of this corridor calls for the commissioning of 14 fast-charge stations along Highways 401, 416, 417 and 17 by 2017. An additional eight 240-V (Level-2) charging stations are also planned at strategic locations in Ottawa.

The Electric Circuit, a subsidiary of Hydro-Québec, submitted a joint bid with Metro, St-Hubert restaurants and the City of Ottawa, which will install charging stations on its property. The charging stations will be manufactured by the Electric Circuit’s supplier, Quebec-based AddÉnergie.

“This initiative reflects the ambitious objective set out in our Transportation Electrification Action Plan 2015-2020, which aims to have 100,000 electric and plug-in hybrid vehicles on our roads by 2020,” says Jacques Daoust, Quebec’s Minister of Transportation, Sustainable Mobility and Transportation Electrification. “The installation of charging stations along highways is another argument to convince future car buyers to make the switch to electric vehicles.”

The Electric Circuit is the largest public charging network in Quebec. It comprises 620 public charging stations, including 31 fast-charge stations, across 16 Quebec regions. Since its launch in March 2012, 136 private and institutional partners have joined the Electric Circuit, and the network now has over 7,000 members.

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene