Lumenpulse Lights Up Iconic Montreal Monuments for City’s 375th Anniversary

Jacques Cartier Bridge, illuminated

 

May 19, 2017

Lumenpulse luminaires are lighting the Jacques Cartier Bridge and a series of iconic Montreal buildings as part of Montreal’s 375th and Canada’s 150th anniversary festivities.

On May 17, the Jacques-Cartier Bridge, a Montreal architectural landmark, came to life with a new lighting design, named Living Connections. This design adapts to the city’s changing seasons and the ever-evolving, data-responsive programming creates a unifying and dynamic symbol of Montreal’s unique history and creativity.

“We are very proud to have helped illuminate these iconic symbols that grace Montreal’s skyline,” says François-Xavier Souvay, Chairman, President and CEO of the Lumenpulse Group. “As proud Montrealers, we felt a great responsibility to make sure we provided an effective, sensible lighting solution that revealed Montreal’s splendour bringing forth a new beacon of inspiration to Montreal’s sky for years to come.”

The Jacques-Cartier Bridge’s new lighting design was led by Moment Factory, and included the efforts of six more Montreal-based multimedia and lighting studios: Ambiances Design Productions, ATOMIC3, Éclairage Public/Ombrages, Lucion Média, Réalisations, and Udo Design.

The lighting design used approximately 95 high-performance Lumenfaçade luminaires to light the bridge pillars, while approximately 480 durable, high-output Lumenbeam XLarge luminaires, concealed from view within the structure, bathe the interior structure with a uniform wash of colour. The project is part of a series of new lighting schemes to celebrate multiple sites across the city, including the Ile Sainte-Helene Biosphere.

Created by the firm 4U2C, under the artistic supervision of lighting designer Yves Aucoin, the design enhances the existing lighting system and highlights the structure’s strong architectural qualities. The sphere’s appearance is constantly changing; various colour and intensity schemes are applied to the metallic structure throughout the night.

The Jacques-Cartier Bridges now joins the growing constellation of illuminated Montreal landmarks, which include such places as Place Ville-Marie, the Mount Royal Cross, the Biosphere and the Montreal Olympic Tower.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…