Samsung and Pattern Development Complete 100 MW Belle River Wind Power Facility

Belle River Wind

Samsung Renewable Energy, Inc. (Samsung) and Pattern Energy Group LP (“Pattern Development”) have announced their 100 megawatt (MW) Belle River Wind power facility has completed construction and is fully operational. Belle River Wind is expected to generate enough clean energy to power approximately 35,000 Ontario homes each year, based on average annual residential energy use in Ontario.

“Samsung is proud to complete our fifth wind project under our Green Energy Investment Agreement with the government of Ontario,” said Eskay Lee, Vice President, Samsung C&T. “Belle River Wind created more than 235 jobs during peak construction. Samsung and its partner are creating jobs and investing in the community which are benefiting real people in Lakeshore and across the province.” 

“Pattern Development continues to grow in Canada. This is the fifth wind power facility we have completed in Ontario – and seventh across Canada – totaling nearly 1.3 gigawatts of operational capacity in the country, and we expect another project to reach completion this year in Quebec,” said Mike Garland, CEO of Pattern Development. “Belle River Wind is making a significant positive impact locally by generating millions of dollars in landowner payments, community benefits and tax revenue for the community around Lakeshore and for the local schools.”

Built with Ontario-made products, Belle River Wind provided jobs for more than 235 Ontario workers during construction and 12 permanent positions during operations. Towers for the 40 Siemens 3.2 MW wind turbines were made at CS Wind’s manufacturing facility in Windsor using Ontario steel. The 120 turbine blades were manufactured in Tillsonburg.

Belle River Wind is bringing strong economic benefits to the local community, including more than $2.5 million in direct spending over 20 years in property taxes and landowner lease royalties. In addition, Belle River Wind committed $6 million to the community of Lakeshore as part of a long-term Community Benefit Program, which supports education and other initiatives. This includes an initial contribution of $2 million and an annual contribution of $200,000 for the next 20 years.

Compared to coal-fired generation, the Belle River Wind facility will conserve enough water to meet the annual freshwater needs of nearly 9,000 Ontarians and avoid more than 300,000 tonnes of CO2 each year – the equivalent of taking more than 60,000 cars off the roads, according to emission rates from the Ontario Ministry of Environment and southwestern Ontario per capita water consumption from Environment Canada.

The Belle River Wind power facility operates under a 20-year power purchase agreement with the Independent Electricity System Operator (IESO).

http://www.newswire.ca/news-releases/samsung-and-pattern-development-complete-100-mw-belle-river-wind-power-facility-in-ontario-650058053.html

Related Articles


Latest Articles

  • Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    Resilient but Not Ready: Affordability, Trade and Workforce Barriers Limit Alberta’s Retrofit Supply Chain

    July 30, 2026 Alberta’s building retrofit sector is ready to scale and could generate $5.8 billion in GDP and support 24,000 jobs with $2.5 billion in annual investment — but only if governments, utilities, and industry align on a clear, coordinated strategy. Resilient but Not Ready shows that while Alberta’s retrofit supply chain is adaptable and… Read More…

  • Lighting 101: How to Choose the Right LED Replacement

    Lighting 101: How to Choose the Right LED Replacement

    July 30, 2026 By EB Horsman & Son Not all LED replacements are created equal. Whether you’re replacing a single light fixture in your home or upgrading lighting throughout your building, choosing an equivalent LED replacement isn’t always as simple as matching the wattage or colour temperature. Many homeowners, contractors, facility managers, and property managers… Read More…

  • Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    Lighting an Industrial Facility: Designing for Safety, Productivity & Performance

    July 30, 2026 By CSC LED When planning an industrial facility, lighting is often discussed by fixture type—high bays, wall packs, flood lights, emergency lighting, and so on. In reality, successful lighting design starts by understanding how each space is used. Every area of an industrial property has different visual requirements. A parking lot prioritizes… Read More…

  • Gescan Milwaukee Tent Events

    Gescan Milwaukee Tent Events

    July 30, 2026 Take advantage of exclusive event‑day pricing, live hands‑on demos with Milwaukee Specialists, and explore new and featured solutions across power tools, lighting, safety, batteries, and accessories. Enjoy food, giveaways, and prize draws happening at the branch for ONE DAY ONLY! BONUS ITEMS: Visit one of Gescan’s participating locations starting at 7:00 am, don’t… Read More…


Changing Scene

  • Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    Copper Thefts on Bell’s Network Surge 78% at the Mid-Year Mark

    July 30, 2026 Copper theft continues to rise across Canada, with serious consequences for communities and the critical services they rely on. In the first half of 2026, Bell has seen a surge in theft and vandalism targeting telecommunications infrastructure, causing service outages that can disrupt Internet, TV and phone services — and, most importantly,… Read More…

  • Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    Electrozad Launches Enhanced Digital Solutions with Improved eCommerce Website and New Mobile App

    July 30, 2026 Electrozad, a Sonepar company, is proud to announce the launch of its newly enhanced eCommerce website and new mobile app, marking a significant milestone in the Electrozad’s digital evolution and commitment to delivering the best customer experience. The digital platforms are now available to customers across Southwestern Ontario, making it easier and… Read More…

  • Seacliff Electric Introduce New Regional Manager for Calgary Operations

    Seacliff Electric Introduce New Regional Manager for Calgary Operations

    July 20, 2026 Seacliff Electric are pleased to announce that Joe Niosi has accepted the position of Regional Manager for their Calgary operations. “Joe has been an important member of our team and brings extensive experience in the electrical construction industry, project execution, leadership, and team development. Through his time as our Service & Special… Read More…

  • Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    Electrical Safety Authority Welcomes Federal Action on Copper Theft, Citing Deadly Risks to Public and Workers

    July 20, 2026 New sentencing provisions recognize serious public safety consequences of crimes targeting electrical infrastructure. The Electrical Safety Authority (ESA) welcomes the federal government’s implementation of provisions within the Bail and Sentencing Reform Act (Bill C-14) that strengthen consequences for crimes that damage or interfere with essential infrastructure, including copper theft. Copper theft is a growing challenge… Read More…