Hydro-Québec is North America’s largest generator of low-carbon electricity, and as the world moves toward a low-carbon future, energy is an asset that can secure both environmental and economic gains. Québec’s hydropower – with its low greenhouse gas emissions, flexibility and reliability— can be the foundation on which the northeast can stabilize and even reduce overall electricity prices for consumers and integrate more renewable sources onto its electricity grids.

The US Northeast needs clean energy. Our hydropower is available now

The region is faced with the retirement of several sources of baseload energy. With this in mind, Massachusetts and New York are currently considering options to bring more firm renewable power into their energy mix. The attributes of Québec hydropower as a low-carbon, flexible baseload electricity source are well suited to contribute to all of Massachusetts’ and New York’s objectives. What’s more, Hydro-Québec’s high-performance fleet of existing hydropower generating stations produces energy that is available today, in significant quantities.

Hydropower infrastructure can’t be built in a day; it takes 10-15 years to develop from start to finish. Energy leaders in Québec have had the foresight to develop our water resources. Since 2003, we’ve brought close to 5,000 megawatts of new hydropower on line in anticipation of increased clean energy needs throughout the northeast. 

That “early mover” approach means we’re now in a position to help the northeast move towards a low-carbon future. And northeast markets have the unique opportunity now to plug into this major electricity supply source and fully benefit from the full environmental value of hydropower: clean, reliable, renewable, dispatchable energy, available in large quantities and ready when consumers need it.

Large-scale supply options over new, lasting infrastructure

Existing interconnections to northeastern states are already being used to full capacity at peak demand periods. Therefore, to provide the incremental energy these markets are calling for and to fully play our role as an enormous battery for our surrounding markets, new transmission facilities must be built. This new infrastructure will improve reliability and cost-effectiveness in both New England and New York for decades to come. Interconnected electricity markets are more efficient, using power generated from a range of resources over a much wider geographic area. That lowers the cost of producing and managing electricity for everyone. Enhanced grid integration is the way forward in bringing about a true energy transition in our region.

Foreseeable long-range operating costs

Québec hydropower has affordable, predictable costs over the long term, an important factor to keep in mind since hydropower generating stations can operate for more than 100 years. This stability can play a key role in mitigating price volatility in neighboring markets and contributing to energy security in the Northeast.

Working better, Setting new sights, Building tomorrow

This is the theme of our strategic plan, and growth is a key component. We want to increase our electricity exports to all of our markets. Thanks to our buildout over the last 15 years, we have the generation capacity to significantly increase those exports; and increased exports of clean energy means reduced greenhouse gas emissions in the northeast. With that in mind, we remain on the lookout for win-win opportunities to sell our hydropower, especially in the Northeast and Ontario. 

Going forward, as northeast markets move to integrate more intermittent renewable energy sources, energy storage solutions will become indispensable. In addition to being a major source of low-emitting energy, Hydro-Québec’s vast reservoir system enables it to firm up intermittent renewables, absorb excess generation from surrounding markets and flow that power back onto those grids when it’s most needed. We can be the battery for America’s northeast.

Hydro-Québec is also looking to acquire assets or equity stakes in power companies outside the province. We also will step up our efforts to commercialize our many promising innovations, such as large-scale battery storage systems for energy grids and robotic maintenance and inspection of energy grids.

As a recognized leader in hydropower and large transmission systems, and a long-standing partner in the northeast, we can be part of the solution in the region’s energy transition. And as a large-scale energy supplier, Hydro-Québec can provide a direct path to clean, reliable, affordable electricity. That is our vision for the region: a clean, renewable energy future.

– Eric Martel is president and CEO of Hydro-Québec.

http://news.hydroquebec.com/en/news/192/the-global-energy-transition-quebec-hydropower-provides-clean-firm-and-reliable-solutions/

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…