$1.4 Million to Make New Brunswick First Fully Connected Province

NB Power

January 19, 2018

New Brunswickers will benefit from the installation of nine additional e-charging sites in the province. The 1.4 million dollars investments will double the fast-charge eCharge Network and will make New Brunswick the first fully connected province in Canada with a DC Fast charging network for electric vehicles.

The investments include $774, 500 from the Province of New Brunswick, which includes $577,000 from NB Power and $197,500 from the Regional Development Corporation as well as $647, 500 from the Government of Canada, which includes $ 450,000 from Natural Resources Canada and $ 197,500 from the federal Gas Tax Fund.

“The climate change action plan calls for a collaborative approach to creating the strategic infrastructure to support electric vehicles, and we’re proud to be a partner in such a progressive plan to build greener infrastructure and support the low-carbon economy,” said Environment and Local Government Minister Serge Rousselle. “Today’s announcement is exciting news and shows that by working together we’ve positioned New Brunswick as a leader in supporting electric transportation.”

The new fast chargers will be accompanied by Level 2 charger at each location.

Since this past summer, ten fast charge sites have been installed in New Brunswick. The new sites announced today almost double the capacity and include many rural communities throughout the province.

“Expanding the network of electric vehicle charging stations, in New Brunswick and across the country, will give Canadians more transportation options and help put more clean vehicles on our roads and highways”, said Member of Parliament for Acadie-Bathurst and Parliamentary Secretary to the Minister of Immigration, Refugees and Citizenship, Serge Cormier. “Congratulations to NB Power and its partners for helping to advance our federal and provincial efforts to build a clean economy, create well-paying jobs, and realize our climate change goals.”

Electric vehicle owners can reduce their fuel-related costs by about 80% while reducing their carbon footprint by 80%.

“We are very proud to spearhead this first in Canada,” said NB Power president and CEO, Gaëtan Thomas. “By having a network of fast chargers throughout our province, it will give electric vehicles owners the peace of mind they need when they are travelling from one point to another. It will reduce range anxiety.”

The new chargers will be in the following locations:

  • Saint Quentin
  • Eel River Bar
  • Bathurst 
  • Tracadie
  • Miramichi
  • Doaktown
  • Richibucto
  • Rothesay
  • South Western New Brunswick

The new chargers will join existing chargers that were installed since last summer in the following locations:

  • Edmundston
  • St. André (Grand Falls)
  • Perth-Andover
  • Beardsley (Woodstock)
  • Prince William
  • Waasis (Lincoln)
  • Youngs Cove
  • Salisbury
  • Magnetic Hill
  • Aulac

About the eCharge Network:

The eCharge Network is NB Power’s public charging program for electric vehicles. The eCharge Network is made up of standard level-2 (240 volt) charging stations located throughout the province and will result in 19 fast-charging stations (400 volt) not only along the TransCanada Highway from Edmundston to Aulac, but throughout the entire province.

https://www.nbpower.com/en/about-us/news-media-centre/news/2018/investments-of-14-million-to-make-new-brunswick-first-fully-connected-province/

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…