University of Guelph Receives $25 Million for Energy, Water Conservation

U of G

 

Mar 26, 2018

The University of Guelph has received $25 million from the Ontario government to support its ongoing energy and water conservation efforts. The funds — $9.5 million in grants and $16.8 million in interest-free loans — come from the province’s greenhouse gas campus retrofits program within its larger climate change action plan. (Shown in photo: Engineering professor Andrea Bradford discussing the experiential learning opportunities provided by water and energy conservation projects.)

“We are committed to a future as an energy-reliable campus, and this new funding will allow us to expand and enhance initiatives aimed at placing fewer demands on the planet,” says Don O’Leary, vice president (finance, administration and risk).

The university will use the funding to upgrade and expand its heat recovery system, install real-time energy monitoring meters and a new electric boiler, and pursue other projects to reduce greenhouse gas emissions.

“Our goal is preserving natural resources, cutting down on greenhouse gas emissions and energy costs, and helping protect the environment,” O’Leary says. “Increasing the efficiency of our heating system and introducing electric-based heating is another step toward a long-term strategy of reducing reliance on carbon-based fuel for heating.”
The retrofit projects will reduce CO2 emissions by more than 3,200 tonnes per year, the combined equivalent of removing nearly 700 cars from the road, powering and heating about 350 homes, and the benefit of planting more than 83,000 trees.

Students will have access to course-based and hands-on learning opportunities involving the heat recovery system. Students — largely in engineering, environmental sciences, business and environmental governance programs — work in U of G’s Department of Physical Resources each term, and this project will provide more learning opportunities.
O’Leary said U of G has found innovative ways to use and manage energy and water for many years. The university has invested millions of dollars in energy and water conservation efforts as part of its long-term plan to be a carbon-neutral campus, he said.

This includes the Green Gryphon initiative, a $26.2-million, campus-wide energy retrofit that led to a new thermal energy storage system. Overall, the project has reduced the university’s electrical consumption by eight per cent and electrical demand by 14 per cent annually.

U of G has also invested more than $10 million in other retrofit programs, including energy-efficient lights and windows, heating systems and water conservation. Campus-wide water use has decreased by nearly 8% and total energy consumption by 11%, saving the university some $2.2 million a year.

In 2016, U of G’s conservation efforts were rewarded with a $5.8-million energy-saving initiative from the province, part of a funding rewards program overseen by the Ministry of Energy.

Photo: University of Guelph

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…