Electrical Industry Take Note: 27th Edition of the Ontario Electrical Safety Code Effective May 16, 2019

ESA logo 400

May 16, 2019

The latest edition of the Ontario Electrical Safety Code (OESC) – the legal standard with which all electrical work in Ontario must comply – comes into effect May 16, and includes important new safety requirements. Electrical work conducted on notifications (or plan review submittals) taken out after today must meet the updated requirements.

The new edition of the OESC includes the Canadian Electrical Code, Part I plus several Ontario-specific amendments.  This new edition includes changes designed to enhance electrical safety and protect workers and the public including:

  • Re-write of Section 10 requirements for bonding and grounding have been reorganized and reduced in size with some changes that will improve safety and simplify the installations;
  • Expanding the use of Tamper-resistant receptacles in educational facilities and hotels/motels;
  • Requirements for installing an identified (neutral) conductor at each control (switch) location of permanently installed luminaire;
  • Alignment with the Ontario Building Code to prevent the installation of high-voltage conductors over buildings;
  • Providing of adequate working space for electrical workers to undertake necessary repairs, maintenance and installation of transformers greater than 50kVA;
  • Prohibiting of installation of cables in concealed locations in corrugated roof decking
  • Adding requirements for Energy Storage systems; and
  • Facilitating the use of Power over Ethernet to provide a pathway for sources of electricity.

“Revisions to the Ontario Electrical Safety Code are made through a broad consultative process at both the provincial and national levels, and through the collaboration of ESA and its safety partners. The updated Code harmonizes the Ontario requirements with the rest of Canada,” says Nansy Hanna, Director of Engineering and Program Development, Regulatory and Safety Programs, Electrical Safety Authority.

In addition to prescriptive amendments and rules regarding instructions for safe electrical installations, the OESC also contains requirements regarding notifications. Specifically, almost all electrical work requires a notification. In Ontario, only a Licensed Electrical Contractor is legally allowed to be hired for electrical work, and only homeowners or occupants are able to conduct electrical work in their own home.

And although homeowners and occupants are legally allowed to do electrical work in their own home, ESA strongly encourages hiring a Licensed Electrical Contractor – and it’s important to ensure the required electrical notification are being taken out. A notification creates a permanent record of the electrical work and triggers a review of the work by ESA. Once the electrical work is complete, it is imperative to ask for an ESA Certificate of Inspection for resale and insurance purposes, as well as peace of mind.

To learn more about Ontario’s legal requirements for electrical installations, for frequently asked questions about the Ontario Electrical Safety Code, or to purchase a copy, visit www.esasafe.com/2018oesc.

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…