More Electric Vehicle Charging Stations Now Available at Parks Canada Places

September 24, 2020

The COVID-19 pandemic reminded Canadians of the importance of connecting with our natural environment. Spending time in nature has proven benefits on human health and well-being. That’s why the Government of Canada is delivering more options for Canadians to experience our natural treasures across the country, while reducing emissions.

Today, the Minister of Environment and Climate Change and Minister responsible for Parks Canada, the Honourable Jonathan Wilkinson, announced that 28 of the most popular Parks Canada places now have Tesla donated electric vehicle charging stations available for visitors to use.

In May 2019, the Government of Canada committed to having charging station infrastructure at or near ‎25 of the most popular Parks Canada places across the country by 2021 and would double the number of destinations offering this service to the 50 most popular places by 2025. Parks Canada has already met its 2021 goal and is well on its way to meeting the 2025 targets, with the help of a Tesla donation of over 350 charging stations in 2019.

The gift from Tesla allows Parks Canada to better serve visitors who have chosen electric vehicles and is part of Parks Canada’s ongoing work in greening operations and fighting climate change.

To date, 172 electric vehicle charging stations have been installed in 14 national parks, 12 national historic sites, one national marine conservation area and in Rouge National Urban Park. For each location where this new electric vehicle charging service is available, half of the charging stations are Tesla and half are J-1772 and are included free of charge with entry fees (where applicable). Several Parks Canada places will have more than one area where visitors can charge their electric vehicles.

The Government of Canada is committed to providing Canadians with practical solutions to reduce emissions when they visit national parks, national historic sites and national marine conservation areas.

Quick facts

  •    –   Transportation accounts for a quarter of Canada’s greenhouse gas emissions, almost half of which comes from cars and light trucks. Electric vehicles offer the potential to significantly reduce greenhouse gas emissions.

  •    –   By autumn 2020, Parks Canada expects charging stations donated by Tesla will be available to visitors at 38 Parks Canada places.

  •    –   This investment builds on commitments from the federal government to achieve net-zero emissions by 2050. It also supports the Government of Canada’s goal to reach its ambitious target of 100 percent of passenger zero-emission vehicle sales by 2040.

  •    –   Tesla donated Level 2 charging stations (half Tesla, half J-1772) for visitor use in Parks Canada places. These destination charging station locations allow vehicles to reach full charge in 4-6 hours.

  •    –   When  planning your trip to a Parks Canada place, visit (https://www.plugshare.com/) to find out if there is an electric vehicle charging station locations at the national park or national historic site you are visiting.

  •    –   The health and safety of visitors, employees and all Canadians is of the utmost importance. To help limit the spread of COVID-19, Parks Canada is following the advice and guidance of public health experts in resuming visitor access and services. Only Parks Canada places where health and safety risks can be managed effectively are open or will re-open.

  •    –   Parks Canada’s network of protected places is large and diverse. Visitor access and services will vary across the country depending on local circumstances.

  •    –   Visitors to Parks Canada places are responsible for following local and provincial or territorial travel restrictions, including requirements for self-isolation. Visitors must follow the applicable travel restrictions or requirements.

  •    –   The Parks Canada website provides detailed information on what locations are open, what visitors can expect, how to prepare for a visit and what services may be available. Visitors are asked to plan ahead by checking the website before they travel.

Source

Related Articles


Latest Articles

  • Why Business ERP Software Integrations Matter for Modern Estimating Teams

    Why Business ERP Software Integrations Matter for Modern Estimating Teams

    March 2, 2026 By Melvin Newman, Patabid CEO Construction estimating is a high-stakes game. For large electrical contractors managing multiple projects, millions in material costs, and dozens of estimators, the margin for error is razor-thin. A misquoted job doesn’t just lose money—it can tie up crews, strain supplier relationships, and ripple through your entire operation. Read More…

  • Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    March 2, 2026 This International Women’s Day, the Ontario Building and Construction Tradeswomen (OBCT) proudly celebrates the leadership, resilience, and collective power of women in the trades across Ontario. This year’s theme is Give to Gain, which highlights the strength of reciprocity and collective support. When tradeswomen, organizations, and communities uplift each other through generosity, opportunities for women Read More…

  • Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    March 2, 2026 This recall involves Purevolt Photoelectric Smoke Detector model SD119-4 for fire alarm systems, compatible with 4 wires, 12V DC. The product measures 100mm x 48mm and is intended for indoor use, with ceiling or wall mounting. The model number can be found on the label affixed to the back of the product. Issue Health Canada’s sampling Read More…

  • Sustainable Urban Development Starts with Streetlighting Transformation in Val-D’or

    Sustainable Urban Development Starts with Streetlighting Transformation in Val-D’or

    March 2, 2026 The City of Val-d’Or, in the heart of Quebec’s Abitibi-Témiscamingue region, undertook a major streetlight revitalization project on 7th Street, a principal north-south artery. By updating public lighting, it would improve energy efficiency, give this iconic area a contemporary look, and preserve its urban identity. Old streetlights on 7th Street had been Read More…


Changing Scene