Southwire Casts First Copper Bar at New Plant

January 27, 2023

On Saturday, Jan. 21, 2023, at 12:45 p.m. (EST), the first copper bar was cast at Southwire’s new, state-of-the-art Copper Rod Plant in Carrollton, Ga. This moment is a key milestone in the start-up of the largest and most sophisticated Southwire Continuous Rod (SCR®) system in the world.

“It is truly an exciting day for Southwire. Our company is where it is today because of these copper rod plants, and starting up a new copper rod system is like starting a brand new chapter in our history,” said Will Berry, senior vice president of Modernization. “It’s a great time to be at this point; a perfect moment to build on all that we have already accomplished.”

In 1963, the company patented SCR technology, which transformed the wire and cable industry. More than half of all copper rod in the world has passed through a SCR system in some capacity. 

In 1981, Southwire started the operation of its current copper rod system in Carrollton, and four decades later, copper continues to be the primary source of metal for the company’s wire and cable operations.

“On December 9, more than 40 years ago, my dad drove my siblings and I to the existing rod plant. The plant was completed, and we watched it start production that night,” said Lee Richards, Southwire board member and son of the company’s founder, Roy Richards, Sr., during the groundbreaking for the new facility . “My dad always believed that there was a more efficient way to make copper and aluminum rod, and the SCR system development was the result of this belief.”

Through cutting-edge technology and practices, the new rod plant will produce more copper rod than any other SCR® system, while encompassing a smaller environmental footprint. In support of Southwire’s Carbon Zero initiative to achieve 100% carbon free energy for our operations by 2025, Southwire is partnering with Carroll EMC to utilize all renewable electricity for the facility.

“Mr. Richards’ philosophy was ‘build it big, and grow into it’ – and we’re already growing into it,” said Berry. “This place gives you energy – you can feel the anticipation around this facility and this system, and I’m proud of the team that has worked diligently to get the plant up and running. I believe that we’re sending a message to the local community that we’re here for the long haul and, at the same time, providing an international showcase for SCR technology.”

More updates will be shared as the new plant comes online in the coming weeks. The facility plans to celebrate its official grand opening in mid-April.

Source

Related Articles


Latest Articles


Changing Scene

  • Mac’s II Agencies Strengthens Lighting Division

    Mac’s II Agencies Strengthens Lighting Division

    March 19, 2025 Mac’s II Agencies Announces Jamie Capell as the New Sales Manager for Lighting Specification Mac’s II Agencies is pleased to announce the expansion of its lighting division with the addition of Jamie Capell as the Sales Manager for Lighting Specification. Jamie brings 25 years of experience in the lighting and electrical industry, most notably… Read More…

  • RENO Lighting Announce New Vice President of Sales

    RENO Lighting Announce New Vice President of Sales

    March 19, 2025 It is with great excitement that RENO introduce Jean-Claude Lespérance as Vice President of Sales at RENO Lighting. With over 35 years of experience in the Canadian electrical industry, Jean-Claude brings unrivalled knowledge of the market and strong relationship with key industry stakeholders, suppliers, and customers. Holding a college diploma in Electrodynamics… Read More…

  • Canada Invests in Deep Energy Retrofits for Affordable Housing in Hamilton

    Canada Invests in Deep Energy Retrofits for Affordable Housing in Hamilton

    March 13, 2025 There is a need and an opportunity for Canada to strengthen energy security and affordability for all Canadians. Canada’s buildings sector is the third-largest contributor to greenhouse gas emissions across the country. By increasing the scale and pace of building retrofits, we can make homes and buildings more energy-efficient and improve reliability in units.  The federal… Read More…

  • Tesla Products Excluded from BC Hydro Incentive Program

    Tesla Products Excluded from BC Hydro Incentive Program

    March 13, 2025 CBC has reported that BC Hydro is excluding Tesla products from their EV charger incentive program. However, products purchased prior to March 12 will still be eligible. “As of March 12, Tesla chargers, energy storage batteries and inverters are not eligible for rebates, according to B.C. Hydro. Those who have purchased or… Read More…