HPS Offers Enclosed Option to Existing Centurion R Reactor Line

Centurion Reactor

 

Hammond Power Solutions Inc. (HPS) now offers the Centurion R reactor with an enclosed option, providing customers with a complete reactor solution. The HPS Centurion R is available as an open core and coil, Type 1 (as standard) or Type 3R (as special) enclosed unit.These rugged steel ventilated enclosures are constructed for indoor use to provide protection to the reactor against ingress of solid foreign objects as well as protection to personnel against access to hazardous parts. The HPS Centurion R enclosed units may be ordered complete from HPS, or a partner may combine a core and coil unit with the enclosure in their authorized facility.

The HPS Centurion R reactor is designed to address both line-side and load-side issues associated with demanding AC drive applications. This reactor is available in standard ratings from 0.5HP to 1000HP, up to 690 V and is suitable for a variety of industries including pharmaceutical, waste water, oil and gas, food processing and automotive industries.

HPS is North America’s leading manufacturer of dry-type transformers and magnetics. For more information on the HPS Centurion R, visit http://www.hammondpowersolutions.com/category/canada/ or contact your local sales representative.

 

Hammond Launches Centurion R Reactor

Hammond Power Solutions Launches Cast Resin Transformers

 

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4% Read More…


Changing Scene