Trent University Launches $15.5 Million Energy Reduction Project

Trent Traill College

 

Jan 07 2016

A two-year project to increase energy efficiency and upgrade infrastructure at Trent University in Peterborough, ON is expected to save the university more than $1.5 million in avoided energy costs annually over a nine-year term. Affecting 26 buildings and 126,000 square metres of space on the Symons Campus and Traill College, the project supports the university’s mandate to enhance environmental sustainability on campus, as well as in the greater community.
The changes will “significantly reduce our carbon footprint by approximately 2,650 metric tonnes of CO2 annually — the equivalent of planting 20.5 acres of trees, or taking 563 cars off the road,” says Dr. Leo Groarke, the university’s President and Vice-Chancellor.
The campus renewal will take place over two years, during which many infrastructure upgrades and energy conservation measures, will be undertaken.

The changes include:
• lighting retrofits
• micro cogeneration
• energy recovery systems
• new and re-commissioned air handling units (AHU)/variable air volume (VAV) conversions
• pool AHU
• HVAC control systems/redesign and equipment
• VSD pumps; heating boilers
• domestic hot water (DHW) boiler replacement and electric heat conversion
Trent University has awarded the $15.5 million contract to Ameresco Canada. Parent company Ameresco, Inc. provides comprehensive services, energy efficiency, infrastructure upgrades, asset sustainability and renewable energy solutions for businesses and organizations throughout North America and Europe.

Trent University Renews Campuses, Reduces Energy Consumption with Partner Ameresco
Over 20 campus buildings to be upgraded to enhance comfort, deliver energy savings and reduce the University’s carbon footprint
FRAMINGHAM, Mass. & TORONTO–(BUSINESS WIRE)–Trent University in Peterborough, Ontario announced today that it has selected Ameresco Canada, a wholly-owned subsidiary of Ameresco, Inc. (NYSE:AMRC), a leading energy efficiency and renewable energy company, to renew and upgrade campus infrastructure through the Campus Renewal Partnership (CRP), a facility-renewal plan funded through energy savings.

The $15.5 million project, which was approved by the Trent University Board of Governors, is expected to save the University more than $1.5 million in avoided energy costs annually for a nine-year term, and includes energy efficiency and infrastructure upgrades to 26 buildings and 126,000 square metres of space on the Symons Campus and Traill College in Peterborough, Ontario. The retrofits are expected to enhance comfort levels in campus buildings, and are in keeping with the University’s mandate to enhance environmental sustainability on campus, as well as in the greater community.

“Trent University is a proud leader in sustainability among post-secondary education institutions,” said Dr. Leo Groarke, President and Vice-Chancellor of Trent University. “By supporting the economic vitality of our neighbouring community while supporting improved learning spaces for our students, this partnership with Ameresco is enabling us to enhance the University environment for our students, faculty and staff, while being more environmentally sustainable and adding value to the entire Peterborough and Trent communities.”

Steven Pillar, Trent’s Vice President, Finance and Administration added, “This project will yield immediate cost-savings for Trent University, but more importantly, it will result in an over-achievement of our energy reduction targets set in our five-year Energy Conservation Plan and a simple payback of nine years. The partnership with Ameresco will create more efficient buildings and reduce our energy use, allowing us to significantly reduce our carbon footprint by approximately 2,650 metric tonnes of CO2 annually — the equivalent of planting 20.5 acres of trees, or taking 563 cars off the road.”

“Ameresco is honoured to be partnering with Trent University to provide budget-neutral solutions that support the University’s sustainability platform and will help the University achieve its sustainability goals,” said Bob McCullough, President of Ameresco Canada. “Students, faculty and staff will not only benefit from the campus improvements, the community will also benefit from lower greenhouse gas emissions.”

The Campus Renewal Partnership will include an approximate two-year construction period, during which many infrastructure upgrades, as well as energy conservation measures, will be undertaken. The following upgrades will enhance the quality of the teaching and learning environments: new and re-commissioned air handling units (AHU)/variable air volume (VAV) conversions, which drastically improve ventilation and air quality; pool AHU; HVAC control systems/redesign and equipment; VSD pumps; heating boilers; domestic hot water (DHW) boiler replacement and electric heat conversion, all improving temperature comfort; lighting retrofits, which are not only more efficient but also improve colour rendition and visibility; micro cogeneration; and energy recovery systems, for more reliable back-up power.

About Trent University
Trent University has a long-standing history of supporting environmental awareness as well as instituting environmentally sustainable practices on campus. Over the last few years Trent has built two LEED-certified buildings, instituted car and bike share programs, and substantially increased locally grown food being served on campus, including from a new on-campus farm. Building on Trent’s recognized leadership in teaching and research in all areas related to the environment, in September 2015 Trent University launched its new School of the Environment, which positions Trent University as Canada’s leading postsecondary environmental institution, offering students the chance to make their mark on this planet in a thoughtful and sustainable way.

About Ameresco
Founded in 2000, Ameresco, Inc. (NYSE:AMRC) is a leading independent provider of comprehensive services, energy efficiency, infrastructure upgrades, asset sustainability and renewable energy solutions for businesses and organizations throughout North America and Europe. Ameresco’s sustainability services include upgrades to a facility’s energy infrastructure and the development, construction and operation of renewable energy plants. Ameresco has successfully completed energy saving, environmentally responsible projects with Federal, state and local governments, healthcare and educational institutions, housing authorities, and commercial and industrial customers. With its corporate headquarters in Framingham, MA, Ameresco has more than 1,000 employees providing local expertise in the United States, Canada, and the United Kingdom. For more information, visit www.ameresco.com.

The announcement of a customer’s entry into or commencement of a project contract is not necessarily indicative of the timing or amount of revenue from such contract, of the company’s overall revenue for any particular period or of trends in the company’s overall total construction backlog. This project was included in Ameresco’s previously reported awarded projects as of September 30, 2015 and is included in our fully contracted backlog as of December 31, 2015.

 

 

Related Articles


Latest Articles

  • New Gender Equality Report Card Shows Most Jurisdictions are Failing

    New Gender Equality Report Card Shows Most Jurisdictions are Failing

    November 10, 2025 The Canadian Coalition of Women in Engineering, Science, Trade and Technology (CCWESTT) has just released the first Gender Equality Report Card, which provides comprehensive, evidence-based insight into the state of gender equality across Canada’s provinces and territories in science, engineering, trades and technology (SETT) workplaces. The report draws on 18 participatory research… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i] 26th Edition – A Road Map: Section 46

    Guide to the Canadian Electrical Code, Part 1[i] 26th Edition – A Road Map: Section 46

    November 10, 2025 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendices B and… Read More…

  • Calgary Project Transforms Office Building into Energy Efficient Housing

    November 10, 2025 More than 200 Calgarians now have new homes in Downtown West as the former Dominion Centre office reopens as Dominion Civic Apartments. The former Dominion Centre has been transformed from 100,000 square feet of vacant office space to an energy efficient and climate resilient residential building with 132 modern rental suites. The… Read More…

  • Remembering Katy Shebath, A Kind And Thoughtful Leader

    Remembering Katy Shebath, A Kind And Thoughtful Leader

    November 10, 2025 By Stanpro Katy Shebath played a critical role alongside her brother, David Nathaniel, throughout the last 32 years of Standard Products journey. She remains, with David, the heart and soul of this company. A Driving Force Behind STANDARD When Katy joined STANDARD in 1986, she took on the administration of the company. At… Read More…


Changing Scene

  • A Groundbreaking Return to the Sir Robert Peel Centre for Ellis Don

    A Groundbreaking Return to the Sir Robert Peel Centre for Ellis Don

    November 10, 2025 In a full circle moment, EllisDon has broken ground on the Sir Robert Peel Centre Redevelopment Project, a facility originally constructed by EllisDon in the 1980s. Now, this milestone marks the beginning of a new chapter in Peel Region’s public safety infrastructure. The redevelopment will deliver a modern, high-performance policing hub designed… Read More…

  • BCCA Response to Federal Budget 2025

    BCCA Response to Federal Budget 2025

    November 10, 2025 The BCCA welcomes the federal government’s investments into construction and infrastructure in Budget 2025. The budget includes increasing Canada Infrastructure Bank funding by $10 billion and funding the new Major Projects Office to the tune of $213.8 million over 5 years. The BCCA also supports the government’s investment into the construction workforce,… Read More…

  • Government of Canada Releases Budget 2025

    Government of Canada Releases Budget 2025

    November 10. 2025 Canada faces a rapidly changing and increasingly uncertain world. The rules-based international order and the trading system that powered Canada’s prosperity for decades are being reshaped – hurting companies, displacing workers, causing major disruption and upheaval for Canadians. In the face of global uncertainty, Canada’s new government is focused on what we… Read More…

  • CME: Budget 2025 Delivers Key Gains for Manufacturers Facing Tariff Pressures, but Canada Still Needs Deeper Competitiveness Reforms

    CME: Budget 2025 Delivers Key Gains for Manufacturers Facing Tariff Pressures, but Canada Still Needs Deeper Competitiveness Reforms

    November 10, 2025 Canadian Manufacturers & Exporters (CME) applauds Budget 2025 for recognizing the serious challenges facing Canada’s economy amid ongoing U.S. trade actions and for introducing new incentives to spur investment. “This budget takes meaningful steps to support manufacturers under pressure and acknowledges the critical role our sector plays in Canada’s economic future,” said… Read More…