Number of power establishments by employment size category and region: December 2015
March 8 2016
The small and micro enterprises form the largest number of electrical workers.
Source: Statistics Canada http://www.servicecanada.gc.ca
March 8 2016
The small and micro enterprises form the largest number of electrical workers.
Source: Statistics Canada http://www.servicecanada.gc.ca
From jobsite surprises to installation mistakes, low-voltage installers have their hands full on a daily basis. Anything they can do to reduce costs or save time leads to increased productivity and more revenue.
February 27, 2023 Natural Resource Canada (NRCan) is seeking input regarding the regulatory, policy and market barriers and opportunities for accelerating the pace of electrification and electricity grid modernization. This is part of NRCan’s Innovation and Electricity Regulation Initiative, which aims to enhance Federal Programming to address stakeholder needs in the complex regulatory environment related to grid modernization and…
June 26, 2023 By Blake Marchand Schneider Electric and Toronto Metropolitan University held a live panel event at TMU’s Centre for Urban Energy to discuss the future workforce, as well as provide insight into the Schneider Electric Smart Grid Laboratory. The tour of the Smart Grid Lab included a practical use case from Elocity, an…
Only once in my life has time stood still. I can’t describe that brief period as bad or upsetting or even traumatic. All of those descriptors require an emotion to be present, so none of them would be an accurate portrayal.
On an incandescent light bulb, the component that supplies electrical current is called a “base.” There are several types of foot lamp, and each has a specific application.
The code is a comprehensive document. Sometimes, it can seem quite daunting to quickly find the information you need. In this current series of articles, I will provide a guide to help users find their way through this critical document.
November 18, 2024 Technical Advisor Diana Madill shares her inspiring career journey from electrician to inspector and how she overcame challenges as a woman in the trade. If you’ve ever wondered about becoming an Electrical Safety Authority (ESA) inspector, Diana Madill has a path she encourages you to follow. From her humble beginnings inspired by… Read More…
November 18, 2024 On November 7th, the YPN Quebec Region hosted its last 2024 event, the YPN Panel discussion. The panel discussion was moderated by Marcos Simard of Wesco, President of the Quebec YPN Committee. Three leaders from the electrical industry, Gilles Motard, VP operation, Lumen, Corinne Galarneau, company VP, Agence Ricard, Stéphanie Santini, VP… Read More…
The Electrical Safety Authority would like to advise that, following robust consultation, the Minister of Public and Business Service Delivery and Procurement has approved the regulatory amendment to adopt the 2024 Ontario Electrical Safety Code (OESC), which comes into effect on May 1, 2025. Read More…
Rule 22-000 outlinesthe Scope of Section 22 and that it amends or supplements the general requirements of the code. It provides specific rules for locations classified as Category 1 (moisture) or Category 2 (corrosive) environments that are significant enough to interfere with normal operation of electrical equipment. Read More…
November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…
November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…
November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…
November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.