|

2024 Ontario Electrical Safety Code (29th Edition) Comes into Effect May 1, 2025

ESA

November 18, 2024

The Electrical Safety Authority would like to advise that, following robust consultation, the Minister of Public and Business Service Delivery and Procurement has approved the regulatory amendment to adopt the 2024 Ontario Electrical Safety Code (OESC), which comes into effect on May 1, 2025.  

29th Edition

The Ontario-specific amendments included in the 29th OESC can be found here.

The new Code will be available for pre-order immediately, with PDF and hardcopy versions available in January 2025. The hardcopy of the Code book will be available for $243, as well as a PDF-version available for $217. These prices will include free access to the bulletins on CSA ONDemand website over the whole period of the Code cycle. 

ESA is partnering with the CSA Group to offer the Code book and all ESA bulletins – which provide important updates and interpretations – together for one price in a searchable, digital format for $217 – accessible on smart phones, tablets and desktops and compatible with Windows and iOS. This version will be available in Spring 2025.  

Order a copy of the 2024 OESC here.

Get more information on the new OESC here.

Source

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4% Read More…


Changing Scene